To: DWR Central Office — WQ, Non -Discharge Unit
Attn: Leah Parente
From: Caitlin Williams
Winston-Salem Regional Office
State of North Carolina
Division of Water Resources
Water Quality Regional Operations Section
Staff Report
Application No.: WQ0000807
Facility name: 821 Bobbit Road SFR
Note: This form has been adapted from the non -discharge facility staff report to document the review of both non -discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable.
I. GENERAL AND SITE VISIT INFORMATION
1. Was a site visit conducted? ® Yes or ❑ No
a. Date of site visit: 8/7/2024
b. Site visit conducted by: C. Williams
c. Inspection report attached? ❑ Yes or ® No
d. Person contacted: Sarah Thompson and their contact information: stthomps@wakehealth.edu
MI=*14h11YQ[12ZT411001111.�uto) 71yc4111IC17OMO13119040 ►AIIIKIW.199q[OFNI113eKi
1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑ No ® N/A
2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal
system? ® Yes or ❑ No
3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately
assimilating the waste? ® Yes or ❑ No
4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance
boundary, new development, etc.)? ❑ Yes or ® No
5. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No
6. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No
7. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No
8. Has a review of facility compliance been conducted (CEIs)? ® Yes or ❑ No
9. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No
10. Check all that apply:
® No compliance issues
❑ Notice(s) of violation
❑ Current enforcement action(s) ❑ Currently under JOC
❑ Currently under SOC ❑ Currently under moratorium
If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been
working with the Permittee? Is a solution underway or in place?
Have all compliance dates/conditions in the existing permit been satisfied? ® Yes ❑ No ❑ N/A
11. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit?
❑ Yes ®No❑N/A
FORM: WQROSSR 04-14 Page 1 of 2
III. REGIONAL OFFICE RECOMMENDATIONS
1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No
Recommendation: ❑ Hold, pending receipt and review of additional information by regional office
® Hold, pending review of draft permit by regional office
❑ Issue upon receipt of needed additional information
❑ Issue
❑ Deny-($lAt,4te reasons: )
2. Signature of report preparer:
.. -
Signature of regional supervisor: -8B834968199D49D.
Date: 8/7/2024 1=3MF1137456...
IV. ADDITIONAL REGIONAL STAFF REVIEW ITEMS
Staff discussed monitoring requirements, repairs, and operation and maintenance requirements with the new homeowners.
The deed has been filed.