Loading...
HomeMy WebLinkAboutWQ0000807_Staff Report_20240807August 7, 2024 To: DWR Central Office — WQ, Non -Discharge Unit Attn: Leah Parente From: Caitlin Williams Winston-Salem Regional Office State of North Carolina Division of Water Resources Water Quality Regional Operations Section Staff Report Application No.: WQ0000807 Facility name: 821 Bobbit Road SFR Note: This form has been adapted from the non -discharge facility staff report to document the review of both non -discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or ❑ No a. Date of site visit: 8/7/2024 b. Site visit conducted by: C. Williams c. Inspection report attached? ❑ Yes or ® No d. Person contacted: Sarah Thompson and their contact information: stthomps@wakehealth.edu MI=*14h11YQ[12ZT411001111.�uto) 71yc4111IC17OMO13119040 ►AIIIKIW.199q[OFNI113eKi 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑ No ® N/A 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ® Yes or ❑ No 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? ® Yes or ❑ No 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? ❑ Yes or ® No 5. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No 6. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No 7. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No 8. Has a review of facility compliance been conducted (CEIs)? ® Yes or ❑ No 9. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No 10. Check all that apply: ® No compliance issues ❑ Notice(s) of violation ❑ Current enforcement action(s) ❑ Currently under JOC ❑ Currently under SOC ❑ Currently under moratorium If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Have all compliance dates/conditions in the existing permit been satisfied? ® Yes ❑ No ❑ N/A 11. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes ®No❑N/A FORM: WQROSSR 04-14 Page 1 of 2 III. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ® Hold, pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ❑ Issue ❑ Deny-($lAt,4te reasons: ) 2. Signature of report preparer: .. - Signature of regional supervisor: -8B834968199D49D. Date: 8/7/2024 1=3MF1137456... IV. ADDITIONAL REGIONAL STAFF REVIEW ITEMS Staff discussed monitoring requirements, repairs, and operation and maintenance requirements with the new homeowners. The deed has been filed. FORM: WQROSSR 06-2024 Page 2 of 2