HomeMy WebLinkAboutNCC214103_NOT Closeout Documents_20240805 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704) 663-1699
County: Cleveland Project: WTP Contract 1.0 Clearwell High River basin: Broad
Person financially responsible:Cleveland County Water-Brad R Cornwell, Project#: CLEVE-2021-001
Manager
Address: 439 Casor Lawndale Road,PO Box 788,Lawndale,NC 28090
1. Project Location: Casar-Lawndale Road,Lawndale
Pictures: No
2. Weather and soil conditions: Sunny,workable soils. Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: August 05,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: William Baummer Others present:
Date of inspection: July 24,2024 Time arriving on site: 11:35 AM Time leaving site: 11:50 AM
CC: