Loading...
HomeMy WebLinkAboutNCC214103_NOT Closeout Documents_20240805 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704) 663-1699 County: Cleveland Project: WTP Contract 1.0 Clearwell High River basin: Broad Person financially responsible:Cleveland County Water-Brad R Cornwell, Project#: CLEVE-2021-001 Manager Address: 439 Casor Lawndale Road,PO Box 788,Lawndale,NC 28090 1. Project Location: Casar-Lawndale Road,Lawndale Pictures: No 2. Weather and soil conditions: Sunny,workable soils. Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: August 05,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: William Baummer Others present: Date of inspection: July 24,2024 Time arriving on site: 11:35 AM Time leaving site: 11:50 AM CC: