HomeMy WebLinkAboutNCGNE1675_Denial Letter (Signed)_20240806 a"" a
ROY COOPER n
Governor
ELIZABETH S. BISER * -
,,;
Secretary
WILLIAM E.TOBY VINSON.JR. NORTH CAROLINA
Interim Director Lnvironnienad t2uaiiiy
August 6, 2024
Greenville Utilities Commission
Attn: M.Jason Manning
PO Box 1847
Greenville, NC 27835-1847
Subject: Denial of No-Exposure Certification
NCGNE1675
Wastewater Treatment Plant
Pitt County
Dear Mr. Manning:
The Division of Energy, Mineral and Land Resources(DEMLR)has reviewed your submittal of the No Exposure
Certification for Exclusion from NPDES Stormwater Permitting form, received on May 10,2024. The Division is
unable to concur with your certification of no exposure.
Based on an inspection of your facility on July 31, 2024, Washington Regional Office staff found evidence of
sewage spills at various points at the facility as well as open-top dumpsters exposed to stormwater.Additionally,
inspectors noted sludge drying beds to be in use,which is an exposure issue.The Division cannot grant your
requested exemption from permit coverage when industrial activities or materials are exposed or have the
potential to be exposed. Please continue to operate under COC NCCH 10058. Information can be found at
deg.nc.gov/S W-industrial.
If you have any questions or need further information, please contact Brittany Cook at(919)707-3648 or email at
Brittarry.cook@deq.nc.gov
Sincerely,
Tob Vinso nterim Director
Division o ergy, Mineral and Land Resources
cc: Washington Regional Office/S. Dumpor
North Carolina Department of Environmental Qua@ty Division of Energy,Mineral and Land Resources
_ 512 North Salisbury Street 7612 Mail Service Center I Raleigh,North Carolina 27699-1612