Loading...
HomeMy WebLinkAboutNCG060182_Cover Letter and Inspection Report_20240802 ROY COOPER Governor ELIZABETH S.BISER ' Secretary $ WILLIAM E. TOBY VINSON,JR NORTH CAROLINA Interim Director EnvironmentalQuafity August 2, 2024 Pilgrim's Pride Corporation Attention: Fabio Sandri 1770 Promontory Circle Greely, Colorado 80634 Subject: Stormwater Inspection Report NPDES Stormwater Permit Number or Certificate of Coverage Number NCG060182 Union County, North Carolina Dear Mr. Sandri: Enclosed please find a copy of the Compliance Inspection Report for the inspection conducted at the Pilgrims Pride— Marshville Complex facility located at 5901 Highway 74 E on July 25, 2024. The report should be self-explanatory, however, should you have any questions concerning these reports, please do not hesitate to contact Lily Kay at(704) 235-2100 or by email at Lily.Kay@deq.n.c.gov. Sincerely, Kathryn Peterson Assistant Regional Engineer Land Quality Section LCK/KP Enclosure: Inspection Report cc: Stormwater Laserfiche, NCG060182 MRO-Land Quality Section, Stormwater Files North Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115 704-235-2100 Compliance Inspection Report Permit:NCG060182 Effective: 07/01/21 Expiration: 06/30/26 Owner: Pilgrim's Pride Corporation SOC: Effective: Expiration: Facility: Pilgrims Pride-Marshville Complex County: Union 5901 Hwy 74 E Region: Mooresville Marshville NC 28103 Contact Person:Yin-Pong George Chang Title: Complex Environmental Manag4 Phone:704-624-4317 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 07/25/2024 Entry Time 10:35AM Exit Time: 11:30AM Primary Inspector:Lily C Kay Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Food/Tobacco/Soaps/Cosmetics/Public Warehousing Stormwater Discharge COC Facility Status: 0 Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG060182 Owner-Facility:Pilgrim's Pride Corporation Inspection Date: 07/25/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: The Stormwater Pollution Prevention Plan (SWPPP)and related documentation was complete including employee training records, inspection records, and the annual certification. The facility appeared well operated and maintained and no issues were observed at the outfalls. If you have questions, contact me at Lily.Kay@deq.nc.gov or by phone at(704)235-2137. Page 2 of 3 Permit: NCG060182 Owner-Facility:Pilgrim's Pride Corporation Inspection Date: 07/25/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ #Does the Plan include a General Location (USGS)map? 0 ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? N ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan(SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ #Does the facility provide and document Employee Training? ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ #Is the Plan reviewed and updated annually? N ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: The Stormwater Pollution Prevention Plan (SWPPP) and related documentation was complete including employee training records, inspection records, and the annual certification. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Qualitative monitoring records were available and complete. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Analytical monitoring records were available and complete. Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? E ❑ ❑ ❑ #If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑ Comment: All three outlets were observed at the time of inspection with no issues. Page 3 of 3