HomeMy WebLinkAbout20241016 Ver 1_US 64 Nash County Diffuse Flow Plan_20240726Diffuse Flow Plan for US 64 Nash County
This project is a maintenance activity undertaken with goal of protecting existing transportation facilities.
The primary objective is to stabilize an existing stormwater conveyance within the right of way. This
project is not expected to create or otherwise result in additional concentrated flow through or within
the buffer. The project will be executed in accordance with the NCDOT Best Management Practices
(BMP) Manual.