Loading...
HomeMy WebLinkAboutNCC212280_NOT Closeout Documents_20240725 HOLLY Town of Holly Springs s SPRINGS Utilities and Infrastructure Department \**.oso Discover the Source. Certificate of Completion For Erosion and Sedimentation Control July 25, 2024 PROJECT Holiday Inn Express PHASE n/a ENVIRONMENTAL DEVELOPMENT PERMIT NO. 09-2021 FINANCIALLY RESPONSIBLE PARTY Holly Springs Ventures, LLC This is to certify that on the above referenced project the grading has been completed, all utilities and streets have been installed, and permanent stabilization has been successfully achieved in or along all roads and utilities in accordance with the approved erosion control plan. With this certificate, the Town of Holly Springs Engineering Department certifies that the above referenced project is in final compliance with the Town's Soil Erosion and Sedimentation Control Ordinance and therefore closes the active erosion control file for the above referenced project. /// Jeff Peters,Engineering Technician Note: This document does not preclude the Town from taking action on future land disturbance or other erosion or sedimentation issues at this site.