Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
October 2, 2023 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes No
Is this project a public transportation project?*
Yes No
Change only If needed.
Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or
fuel, including natural gas, diesel, petroleum, or electricity?
Yes No
BIMS # Assigned Version# *
20241004 1
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Reviewing Office*
Fayetteville Regional Office - (910) 433-3300
Information for Initial Review
1a. Name of project:
Seminole Road Rolling Hills
la. Who is the Primary Contact?*
Samuel Adam Carter
1b. Primary Contact Email:*
Adam@wetlandnc.com
Date Submitted
7/24/2024
Nearest Body of Water
Daniels Creek
Basin
Cape Fear
Water Classification
C
Site Coordinates
Latitude:
35.442584
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Harnett
Is this a NCDMS Project
Yes No
Longitude:
-79.033739
What amount is owed?*
$240.00
$323.00
Select Project Reviewer*
Chad Turlington:chad.turlington
1c. Primary Contact Phone:*
(910)890-2779
$570.00
$767.00
Is this project a public transportation project?*
Yes No
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?
Yes
No
Please provide the date of the previous submission.'
2/13/2024
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
29 - Residential Developments
1e. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application? *
Yes No
fig. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
401 Water Quality Certification - Express
Riparian Buffer Authorization
2a. Name(s) on recorded deed:
RACOON PATH HOLDINGS LLC
2b. Deed book and page no.:
4181 - 1280
2c. Contact Person:
Mark Lyczkowski
2d.Address
Street Address
402 Forest Park Road
Address Line 2
City
State / Province / Region
Sanford
NC
Postal / Zip Code
Country
27330
USA
Yes No
Yes No
2e. Telephone Number:
(919)824-0334
2g. Email Address:"
mark@fig.l Ic
4. Agent/Consultant (if applicable)
4a. Name:
Samuel Adam Carter
4b. Business Name:
Wetland Solutions, LLC
4c.Address
Street Address
P.O. Box 244
Address Line 2
city
Bunnlevel
Postal / Zip Code
28323
4d. Telephone Number:
(910)890-2779
4f. Email Address:"
Adam@wetlandnc.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
Rolling Hills
1c. Nearest municipality I town:
Broadway
2. Project Identification
2a. Property Identification Number:
9681-96-9302.000
2c. Project Address
Street Address
78 TIM PATTERSON LN
Address Line 2
City
BROADWAY
Postal / Zip Code
27505
3. Surface Waters
3a. Name of the nearest body of water to proposed project: "
Daniels Creek
3b. Water Resources Classification of nearest receiving water:
C
3c. What river basin(s) is your project located in?*
Cape Fear
3d. Please provide the 12-digit HUC in which the project is located.
030300040105
4. Project Description and History
2f. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
2b. Property size:
365.45
State / Province / Region
NC
Country
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: "
Project area is within a large cow pasture. Abutting parcels consist of residential development, agg, and forested areas.
O
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
56.144
4g. List the total estimated linear feet of all existing streams on the property:
1,955Lf
4h. Explain the purpose of the proposed project:*
The purpose of the proposed project is to improve exsisting road to DOT excepted ROW.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
The project will consist fortifying project area for stormwater and sediment intrusion. Upgrading the exsisting road crossing with 60ft ROW. A 90in culvert will be install at grade on
wetlandfloor Then road will be constructed over culvert. A tracthoe and dozer will be utilized to install culvert and construct road.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No Unknown
Comments:
Cow pasture. desturbed in areas.
5b. If the Corps made a jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Samuel Adam Carter
Agency/Consultant Company: Wetland Solutions, LLC
Other:
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
NO
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
O
2a1 Reason (?)
2b. Impact type* (?)
2c. Type of W. *
2d. W. name
2e. Forested*
2f. Type of Jurisdicition *
(?)
2g. Impact
area *
X4
Rd
P
Headwater Forest
Daniels Creek
No
Both
0.010
(acres)
W5
Cul-de-sac RD
P
Seep
W5
No
Corps
0.025
(acres)
W11
Culvert
P
Seep
W11
No
Corps
0.051
(acres)
W11
Home Foundation
P
Seep =�Wii
E::]
Corps J9::::1
2g. Total Temporary Wetland Impact
0.000
2g. Total Wetland Impact
0.108
2i. Comments:
2g. Total Permanent Wetland Impact
0.108
3. Stream Impacts
F
3a. Reason for impact (?)
3b.lmpact type*
3c. Type of impact*
��name*
3e. Stream Type*
?)
3f. Type of
Jurisdiction*
3g. S. width
3h. Impact
length*
S1
Road
Permanent
Culvert
S1
Intermittent
Both
Average (feet)
92
(linear feet)
3i. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
92
3i. Total stream and ditch impacts:
92
3j. Comments:
4. Open Water Impacts
3i. Total temporary stream impacts:
0
4a. Site #
4a1. Impact Reason
4b. Impact type
4c. Name of waterbody _114d.
Activity type :114e.
Waterbody type
4f. Impact area
�K=�Road
Crossing
P
Cow pond
Fill
_11
Pond
0.07
4g. Total temporary open water Impacts:
0.00
4g. Total open water impacts:
0.07
4h. Comments:
E. Impact Justification and Mitigation
1. Avoidance and Minimization
4g. Total permanent open water impacts:
0.07
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
To minamize the enviromental impact we choose to upgrade exsisting crossing rather than costruction a new road crossing
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
We will be pumping down the pond in ordert to construct road which will help with reducing aquatic impact. Foritifing the project area with silt
fence,wadols rip rap and celcer matting and cold weather grass seed. BMP inspections will be conducted after rain events during and after construction
phase.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2c. If yes, mitigation is required by (check all that apply):
DWR Corps
2d. If yes, which mitigation option(s) will be used for this project?
Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
Yes No
4b. Stream mitigation requested:
(linear feet)
92U
4d. Buffer mitigation requested (DWR only):
(square feet)
4f. Non -riparian wetland mitigation requested:
(acres)
.07
4c. If using stream mitigation, what is the stream temperature:
warm
4e. Riparian wetland mitigation requested:
(acres)
.108
4g. Coastal (tidal) wetland mitigation requested:
(acres)
O
4h. Comments
6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR
6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information.
Yes No
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
No buffer in this area of the Cape Fear Watershed
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
Comments:
Lots are larger than lac less than 10% impervious surface
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
Yes No Unknown
5e. Is this a DOT project located within Division's 1-8?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS IPAC
No affect
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
NOAA's Essential Fish Habitat Mapper
Cape Fear Shiner
No effect
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? *
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
HPOWEB2.0
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? *
Yes No
8c. What source(s) did you use to make the floodplain determination?
NC Flood Risk Information System
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
File must be PDF or KMZ
Comments
Attached is the older submission and new NW and JD packet to help with review. Thank you all for your help and time. Stay dry.
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction' subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Samuel Adam Carter
Signature
Srf w4W64e?" 62ff4--f
Date
7/24/2024