HomeMy WebLinkAboutSW4240702_O&M Agreement/Plan_20240725 Operation & Maintenance Agreement
Project Name: Dollar General Store #30370
Project Location: Welcome, NC
Cover Page
Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location.
Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect
the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s).
The SCM(s) on this project include (check all that apply&corresponding O&M sheets will be added automatically):
Infiltration Basin Quantity: Location(s):
Infiltration Trench Quantity: Location(s):
Bioretention Cell Quantity: Location(s):
Wet Pond Quantity: Location(s):
Stormwater Wetland Quantity: Location(s):
Permeable Pavement Quantity: Location(s):
Sand Filter Quantity: 1 Location(s): 35.896453, -80.254688
Rainwater Harvesting Quantity: Location(s):
Green Roof Quantity: Location(s):_ _
Level Spreader-Filter Strip Quantity: Location(s):
Proprietary System Quantity: Location(s):
Treatment Swale Quantity: Location(s):
Dry Pond Quantity: Location(s):
Disconnected Impervious Surface Present: No Location(s):
User Defined SCM Present: No Location(s):- -
Low Density Present: No Type:
I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for
each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the
system or responsible party.
Responsible Party: Josh Hufstetler
Title&Organization: Manager,Teramore Development, LLC
Street address: 165 Big Star Drive
City, state,zjp: Thomasville,GA 31757
Phone number(s : 229- 16-4289
Em il: jos er.more et
vet
Signature: In/ Date: �l 11 L I
I, II^ I UY Ca , a Notary Public for the State of (S ii 1/ l
County of TO MIAS , do hereby certify that uS \}Uffi-etvAr
personally appeared before me this Isi- day of MIN and
acknowledge the due execution of the Op ations and Maintenance
Maintenance Agreement .
Witness my hand and official seal, w°i -
1Ittm rryg
r s
• •
EXPIRES •
GEORGIA :
SEEPTEIABEER 2,2027
Seal MAS„�0 0% My commission expires l 62 1
2.1
STORM-EZ 5/1/2024
Version 1.5 O&M Agreement Page 1 of 3
Important operation and maintenance procedures
- Manage the drainage area to reduce the sediment load to the sand filter.
VICdII VUl LI IC JCUll I IGI IId1IUII Glldffluel of WI CUdy INFIC11CVC1 JGUIIfIGf It UGpui CXGCCUJ
civ i nhec
- At least once a year, skim the sand media
- Replace the sand filter media whenever it fails to function properly after maintenance.
After the sand filter is established, it shall be inspected quarterly and within 24 hours after every
storm event greater than 1.0 inches(or 1.5 inches if in a Coastal County) . Records of operation
and maintenance shall be kept in a known set location and shall be available upon request.
'ection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element: Potential problem: How to remediate the problem:
Entire sand filter I I Gib!l/UCUIIJ lb Remove the trash/debris.
n n+
Adjacent pavement Sediment is present
(if applicable) on the pavement Sweep or vacuum the sediment as soon as possible.
Areas of bare soil Regrade the soil if necessary to remove the gully,
and/or erosive gullies plant ground cover and water until it is established.
The perimeter of the have formed. Provide lime and a one-time fertilizer application.
sand filter
Vegetation is too short
Maintain vegetation at an appropriate height.
or too long.
The structure is Unclog the structure and dispose of sediment in a
The flow diversion clogged. location where it will not cause impacts to streams or
structure(if
applicable) The structure is Make any necessary repairs or replace if the damage
damaged. is too much for repair.
The inlet pipe is Unclog the pipe and dispose of sediment in a location
clogged (if where it will not cause impacts to streams or the SCM.
I I IC II fIGl liffJC lb
cracked or otherwise
damaged (if Repair or replace the pipe.
annlirahlal
The inlet device Erosion is occurring in Regrade the swale if necessary and provide erosion
the swale(if control devices such as reinforced turf matting or
applicable). riprap to avoid future problems with erosion.
O LUIIG vCIyG IJ
clogged or covered in Remove sediment and clogged stone and replace
sediment(if with clean stone.
annlirahlal
Sediment has Search for the source of the sediment and remedy the
accumulated to a problem if possible. Remove the sediment and
depth of greater than dispose of it in a location where it will not cause
six inches. impacts to streams or the SCM.
Sediment chamber Provide additional erosion protection such as
(forebay) Erosion has occurred. reinforced turf matting or riprap if needed to prevent
future erosion problems.
Weeds are present.
Remove the weeds, preferably by hand. If a pesticide
is used, wipe it on the plants rather than spraying.
SCM element: Potential problem: How to remediate the problem:
Water is ponding on Check to see if the collector system is clogged and
Sand chamber and the surface for more flush if necessary. If water still ponds, remove the top
underdrain collection
system than 24 hours after a few inches of filter bed media and replace. If water
storm. still ponds, then consult an appropriate professional.
Clo in has Clean out the outlet device and dispose of sediment
gg g in a location where it will not cause impacts to
occurred.
The outlet device streams or the SCM.
The outlet device is
Repair or replace the outlet device.
damaged.
Erosion or other signs
Repair the damage and improve the flow dissipation
of damage have
structure.
occurred at the outlet.
The receiving water Discharges from the
sand filter are causing
erosion or Contact the local NCDEQ Regional Office.
sedimentation in the
receiving water.