Loading...
HomeMy WebLinkAboutSW4240702_O&M Agreement/Plan_20240725 Operation & Maintenance Agreement Project Name: Dollar General Store #30370 Project Location: Welcome, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply&corresponding O&M sheets will be added automatically): Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: Location(s): Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity: Location(s): Sand Filter Quantity: 1 Location(s): 35.896453, -80.254688 Rainwater Harvesting Quantity: Location(s): Green Roof Quantity: Location(s):_ _ Level Spreader-Filter Strip Quantity: Location(s): Proprietary System Quantity: Location(s): Treatment Swale Quantity: Location(s): Dry Pond Quantity: Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s):- - Low Density Present: No Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Josh Hufstetler Title&Organization: Manager,Teramore Development, LLC Street address: 165 Big Star Drive City, state,zjp: Thomasville,GA 31757 Phone number(s : 229- 16-4289 Em il: jos er.more et vet Signature: In/ Date: �l 11 L I I, II^ I UY Ca , a Notary Public for the State of (S ii 1/ l County of TO MIAS , do hereby certify that uS \}Uffi-etvAr personally appeared before me this Isi- day of MIN and acknowledge the due execution of the Op ations and Maintenance Maintenance Agreement . Witness my hand and official seal, w°i - 1Ittm rryg r s • • EXPIRES • GEORGIA : SEEPTEIABEER 2,2027 Seal MAS„�0 0% My commission expires l 62 1 2.1 STORM-EZ 5/1/2024 Version 1.5 O&M Agreement Page 1 of 3 Important operation and maintenance procedures - Manage the drainage area to reduce the sediment load to the sand filter. VICdII VUl LI IC JCUll I IGI IId1IUII Glldffluel of WI CUdy INFIC11CVC1 JGUIIfIGf It UGpui CXGCCUJ civ i nhec - At least once a year, skim the sand media - Replace the sand filter media whenever it fails to function properly after maintenance. After the sand filter is established, it shall be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches(or 1.5 inches if in a Coastal County) . Records of operation and maintenance shall be kept in a known set location and shall be available upon request. 'ection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Entire sand filter I I Gib!l/UCUIIJ lb Remove the trash/debris. n n+ Adjacent pavement Sediment is present (if applicable) on the pavement Sweep or vacuum the sediment as soon as possible. Areas of bare soil Regrade the soil if necessary to remove the gully, and/or erosive gullies plant ground cover and water until it is established. The perimeter of the have formed. Provide lime and a one-time fertilizer application. sand filter Vegetation is too short Maintain vegetation at an appropriate height. or too long. The structure is Unclog the structure and dispose of sediment in a The flow diversion clogged. location where it will not cause impacts to streams or structure(if applicable) The structure is Make any necessary repairs or replace if the damage damaged. is too much for repair. The inlet pipe is Unclog the pipe and dispose of sediment in a location clogged (if where it will not cause impacts to streams or the SCM. I I IC II fIGl liffJC lb cracked or otherwise damaged (if Repair or replace the pipe. annlirahlal The inlet device Erosion is occurring in Regrade the swale if necessary and provide erosion the swale(if control devices such as reinforced turf matting or applicable). riprap to avoid future problems with erosion. O LUIIG vCIyG IJ clogged or covered in Remove sediment and clogged stone and replace sediment(if with clean stone. annlirahlal Sediment has Search for the source of the sediment and remedy the accumulated to a problem if possible. Remove the sediment and depth of greater than dispose of it in a location where it will not cause six inches. impacts to streams or the SCM. Sediment chamber Provide additional erosion protection such as (forebay) Erosion has occurred. reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. SCM element: Potential problem: How to remediate the problem: Water is ponding on Check to see if the collector system is clogged and Sand chamber and the surface for more flush if necessary. If water still ponds, remove the top underdrain collection system than 24 hours after a few inches of filter bed media and replace. If water storm. still ponds, then consult an appropriate professional. Clo in has Clean out the outlet device and dispose of sediment gg g in a location where it will not cause impacts to occurred. The outlet device streams or the SCM. The outlet device is Repair or replace the outlet device. damaged. Erosion or other signs Repair the damage and improve the flow dissipation of damage have structure. occurred at the outlet. The receiving water Discharges from the sand filter are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water.