Loading...
HomeMy WebLinkAboutNCC224204_NOT Closeout Documents_20240723 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481 County: Craven Project: Palatine Meadows,Lot 2A River basin: Neuse Person financially responsible:Palatine Meadows Limited Partnership-Alexander Project#: CRAVE-2023-010 Keller,VP of Preconstruction Address: 500 South Front Street, 10th Floor,Columbus,OH 1. Project Location: 4100 Academic Dr.,New Bern Pictures: No 2. Weather and soil conditions: Cloudy/Warm/Dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Title: Inspection report: Sent Report Date given/sent: July 18,2024 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the 10. Comments: SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Amber Rights Others present: Date of inspection: July 17,2024 Time arriving on site: 1:00 PM Time leaving site: 1:15 PM CC: County: Craven Project: Palatine Meadows,Lot 2A River basin: Neuse Person financially responsible:Pease Law PLLC-Paige H Pease,Esq. Project#: CRAVE-2023-010 Address: 16151 Lancaster Hwy,Suite B,Charlotte,NC 28277 1. Project Location: 4100 Academic Dr.,New Bern Pictures: No 2. Weather and soil conditions: Cloudy/Warm/Dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington, NC 27889 (252) 946-6481 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Title: Inspection report: Sent Report Date given/sent: July 18,2024 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage 10. Comments: under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Amber Rights Others present: Date of inspection: July 17,2024 Time arriving on site: 1:00 PM Time leaving site: 1:15 PM cc: