Loading...
HomeMy WebLinkAboutNC0083925_authorization to construct_19961230State of North Carolina IT Department of Environment, Health and Natural Resources 4 • Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary p E H N F1 A. Preston Howard, Jr., P.E., Director December 30, 1996 Mr. Kent Davis Salem Glen Golf Course 5180 Dock Davis Road Clemmens, North Carolina 27012 Subject: Permit No. NCO083925 Authorization to Construct Salem Glen WWTP Davidson County Dear Mr. Davis: A letter of request for an Authorization to Construct was received September 24, 1996 by the Division and final plans and specifications for the subject project have been reviewed and found to be �.� satisfactory. Authorization is hereby granted for the construction of a 100,000 gpd package type wastewater treatment plant consisting of an influent flow control chamber with bar screen, a flow equalization tank, dual 50,000 gallon aeration basins with course bubble diffusors, one 70 CFM and three 375 CFM - 15 H.P. blowers, dual rectangular clarifiers with air lift sludge wasting and return, a tablet chlorination / dechlorination tank, an effluent clear well, an effluent pump station and an emergency engine generator, with final discharge of treated wastewater into the Yadkin River in the Yadkin -Pee Dee River Basin. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO083925 issued December 6, 1994, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0083925. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Regional Office, telephone number (910) 771-4608, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. /*4. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Permit No. NC0083925 Authorization to Construct Salem Glen Wastewater Treatment Plant December 30, 1996 Page 2 Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within thirty days after the wastewater treatment facilities are 50% complete. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143- 215.E for violation of or failure to act in accordance with the terms and conditions of this Permit. n, Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Mr. Mark McIntire, telephone number (919) 733- 5083, extension 553. Sincerely, �14qA� ??,,,�_ Preston Howard, Jr., P.E. cc: Central Files Permits & Engineering (ATC files) ' Winston-Salem Regional Office, Water Quality Training and Certification Unit A"1