HomeMy WebLinkAboutNCS000393_MS4 Annual Report (2023-24 FY)_20240724 (2) Town of Dallas
NCS000393
cinece‘CkIC D44
(1,
Ski464101r ,
CP,. .
1 '? :.. . , __4,--._
1
8 .:; • -0, , it • ,. : 8
6 . i!, 5i.v •,
•:1 ei •-
5 1 11: . 4 ,.:....t.,.. ,
, - 4-. , / ,WIN, 6
. ..5, :. _ ,..._-.,..
,..,. ./...-,:„. •• • - ,;.....-. 3
., , .. 4. • - 4.: ,,,C,'
. T't361
0110 rr -
44
tH
Annual SWMP
Self-Assessment
Part 1 —Program Administration & Responsibilities
Previously, the SWMP and Stormwater program was administered by the Public Works Director. These
responsibilities were updated in January 2024 and are reflected in the figure below. The SWMP and Stormwater
program are now administered by the Stormwater Administrator.
Town of Dallas Stormwater City Manager
Jonathan Newton
employee organization
Public Works Director
Board of Bill Trudnak
Aldermen
Asst. Public Works Director
City Manager Zack Foreman
Stormwater Administrator
Public Works Garrison Batchelor
Director
704-774-9711
gbatchelor@dallasnc.net
Assistant
Public Works Stormwater/ Water/ Sewer
Streets Director Water/Sewer Maintenance Supervisor
Engineering Supervisor Maintenance JJ Robbins
Stormwater Supervisor
Administrator Streets Supervisor
Crew Leader David Mathis
Engineering
Equipment Johnny Denton
Operator Diamond Engineering
Figure 1. The organization of employees related to the Town of Dallas Stormwater Program.
Part 2 —Program Administration BMPs
Annual Self-Assessment is completed by the Stormwater Administrator and submitted via the online
submission form provided by NC DEQ.
2.1.2 and Part 4: Annual Self-Assessment
Measures to evaluate the performance and effectiveness of the SWMP program components at
least annually. Results shall be used by the permittee to modify the program components as
necessary to accomplish the intent of the Stormwater Program. The self-assessment reporting
period is the fiscal year(July 1 —June 30).
BMP A B C D
No.
Description of Schedule for Implementation
Measurable Goal(s)
BMP Implementation Status
1. Annual Self-Assessment
•
Perform an 1.Prepare, certify and submit the Annual 1.Annually Years 1 -4
annual Self-Assessment to NCDEQ prior to
evaluation of August 31 each year.
SWMP
implementation,
suitability of
SWMP
commitments
and any YES
proposed
changes to the
SWMP utilizing
the NCDEQ
Annual Self-
Assessment
Template.
2. 1.6: Permit Renewal Application
Measures to submit a permit renewal application no later than 180 days prior Not Applicable
to the expiration date of the NPDES MS4 permit.
Part 3 —Public Education and Outreach BMPs
Permit 3.2.2 and 3.2.4: Outreach to Targeted Audiences
Ref.
Measures to identify the specific elements and implementation of a Public Education and
Outreach Program to share educational materials to the community or conduct equivalent
outreach activities about the impacts of stormwater discharges on water bodies and how the
public can reduce pollutants in stormwater runoff. The permittee shall provide educational
information to identified target audiences on pollutants/sources identified in table 12 of the
SWMP, and shall document the extent of exposure of each media, event or activity, including those
elements implemented locally or through a cooperative agreement.
A B C D
BMP
No. Schedule for Implementation
Description of BMP Measurable Goal(s)
Implementation Status
3. Public Education Materials
Stormwater 1. Prepare and distribute general 1.Annually-Permit
educational stormwater educational materials Years 1-5 YES
materials will be through such means as utility bill Event(s)
developed and inserts,documents/brochures information
distributed to available at community events/sites, provided in Table
appropriate target and direct delivery/mailing to specific below.
groups. The Town target groups.
may rely on Public 2. Utilize services of Gaston County . 2.Annually-Permit YES
Education and and the Regional Stormwater Years 1-5
Outreach materials Partnership to provide supplemental Event(s)
provided by Gaston educational materials. information
County and the provided in Table
Regional below.
Stormwater 3. Use Town staff to operate an 3.Annually-Permit YES
Partnership of the informational booth at a community Years 1-5
Carolinas to event to distribute materials on general Event(s)
supplement self- information
stormwater issues such as improper provided in Table
generated material. disposal of waste and illicit discharges.
below.
4. Maintain records of counts of all 4.Continuously—
educational materials on site for future Permit Years 1-5 YES
compliance audits.
4. Describe Target Pollutants
The Town shall 1.The Town will maintain and update 1.Continuously-
maintain a as needed the list of target Permit Years 1-5 YES
description of the pollutants/stressors and their likely
target pollutants sources as listed in Table 12.This list
and/or stressors shall be posted on the Town's website Provided in SWMP.
and likely sources. and Facebook page.
5. Describe Target Audiences
The Town shall 1.The Town will maintain and update 1.Continuously-
maintain a as needed a list of the target audiences Permit Years 1-5
description of the (as listed in Table 12)likely to
target audiences experience stormwater impacts. This YES
likely to have list shall describe the reasons for each
significant storm target audience being selected and
water impacts and shall be posted to the Town's website
why they were and Facebook page.
selected.
2. Information on Dallas'stormwater 2.Annually-Permit
program will be shared with several Years 1-5 YES
specific target audiences such as
scouts,schools,civic groups,and Event(s)
minority/disadvantaged communities, information
specifically addressing identified target provided in Table
pollutants/sources(as listed in Table below.
12).
6. Litter Management
The Town will 1. Develop a litter management plan 1.Once—Permit
develop and that includes staff responsibilities and Year 1 YES
implement a plan public involvement events.
for ongoing litter
management, 2. Perform regular inspections of public 2.Continuously— PARTIALLY
addressing public properties in accordance with plan and Permit Years 2-5 IMPLEMENTED
properties and remove litter.
street rights-of-way. 3.Conduct biannual public litter sweep 3.Twice—Permit PARTIALLY
events. Years 2-5 IMPLEMENTED
(Only 1 event for
23-24)
Permit 2.1.7,3.2.3 and 3.6.5(c): Web Site
Ref.
Measures to provide a web site designed to convey the program's message(s) and provide online
materials including ordinances, or other regulatory mechanisms, or a list identifying the
ordinances or other regulatory mechanisms, providing the legal authority necessary to implement
and enforce the requirements of the permit and SWMP. The web page shall also provide
developers with all relevant post-construction requirements, design standards, checklists and/or
other materials.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
7. Informational Web Site
The web site will 1. Maintain and update the web site, 1.Continuously-
provide information uploading new educational materials, Permit Years 1-5
on the Town's the most recent SWMP,and other
stormwater pertinent documents.
program, including
the permit,SWMP,
applicable
ordinances,and
annual reports. The
web site will include
educational
materials
developed by the YES
Town and links to
additional
stormwater
educational
resources.The web
site will also be
used to advertise
the stormwater
hotline and
opportunities for
public involvement.
8. Stormwater Issue Reporting Mechanism
A stormwater issue 1. Develop a reporting mechanism for 1.Once-Permit YES
reporting stormwater issues. Year 1
mechanism will be 2. Monitor and maintain the reporting 2.Continuously-
developed for the mechanism,adding new features as Permit Years 2-5
web site whereby needed. YES
citizens can report
Event(s)
observed information
stormwater
provided in Table
problems such as below.
illicit discharges or
runoff.
Permit 3.2.5: Stormwater Hotline
Ref.
Measures for a stormwater hotline/helpline for the purpose of public education and outreach.
A B C D
BMP _
No. Schedule for Implementation
Description of BMP Measurable Goal(s)
Implementation Status
9. Hotline/Helpline
The Town shall 1.The Town shall establish a 1.Once-Permit
promote and stormwater hotline phone number and Years 1 YES
maintain a responsible party.
stormwater
hotline/helpline for 2.The Town shall maintain a 2.Continuously-
the purpose of stormwater hotline phone number and Permit Years 1-5 YES
public education responsible party.
and outreach and to 3.Train additional staff to take 3.Annually-Permit Z. Foreman
take questions and stormwater calls and answer questions Years 2-5 as
complaints on as needed. needed. B.Trudnak
stormwater issues.
G. Batchelor
4. .Publicize the hotline number 4.Continuously- YES.
through the web site and other Permit Years 1-5
selected mechanisms. Posted on website
Event details for Public Education & Outreach BMP No. 3
Event Date Event Name Individuals Material Distributed Focus Pollutant(s)
Reached
04/20/2024 Dallas Spring 19 Verbal awareness, Business card, Floatables, Litter,
Clean Stormwater Website Sediment
05/11/2024 Dallas Library 5 Coloring sheets, 'Spot-the-Difference' Litter, Pet Waste, Yard
Presentation BMP sheet Waste, Sediment
Enviroscape demo, 'Spot-the-
DallasLitter,Yard Waste, Pet
05/11/2024 Concert 32 Difference' BMP sheet, Coloring Waste, Household
Series #1 Sheets Chemicals, Petroleum
Products, Sediment
Litter,Yard Waste, Pet
06/08/2024 Dallas Concert 44 Enviroscape demo, Water cycle Waste, Household
Series #2 bracelets, Coloring Sheets Chemicals, Petroleum,
1 Sediment
06/11/2024 Dallas Library 12 Enviroscape demo, `Spot-the- Litter, Pet Waste, Yard
Presentation Difference' BMP sheet, Coloring Waste, Sediment
sheets
Total Reached 112
Event details for Public Education & Outreach BMP No. 5
Event Date Event Name Individuals Activity/Material Distributed Focus Topic(s)/
Reached Pollutant(s)
Carr Elementary Litter, Sediment,
01/26/2024 5th Grade 100 Floodplain Model, verbal presentation Land-Use, Pervious v.
Impervious surfaces
02/02/2024 Carr Elementary 40 Be a Raindrop, Water cycle flow Water use, Litter
2nd Grade chart, Water cycle bracelet
02/09/2024 Carr Elementary 40 Be a Raindrop, Water cycle flow Water use, Litter
2nd Grade chart, Water cycle bracelet
Litter, Pet Waste, Yard
02/15/2024 Carr Elementary 80 Enviroscape demo, verbal presentation Waste, Sediment,
5th Grade and PowerPoint Fertilizer, Household
Chemicals. Petroleum
Litter, Pet Waste, Yard
02/16/2024 Carr Elementary 20 Enviroscape demo, verbal presentation Waste, Sediment,
5th Grade and PowerPoint Fertilizer, Household
Chemicals. Petroleum
02/16/2024 Carr Elementary 35 Be a Raindrop, Water cycle flow Water use, Litter
2nd Grade chart, Water cycle bracelet
02/20/2024 Carr Elementary 55 Be a Raindrop, Water cycle flow Water use Litter
1st Grade chart, Water cycle bracelet '
02/22/2024 Carr Elementary 40 Be a Raindrop, Water cycle flow Water use Litter
1st Grade chart, Water cycle bracelet '
03/05/2024 Carr Elementary 80 Career talk, Careers in science word General Awareness
5th Grade search
03/06/2024 Carr Elementary 20 Career talk, Careers in science word General Awareness
5th Grade search
03/14/2024 Carr Elementary 45 Share our Water activity, Stormwater Water Use, general
4th Grade word search, verbal instruction pollution
Groundwater
N. Gaston HS Grave Mistake activity, Career contamination,
03/21/2024 AP Earth Science 15 presentation Household chemicals,
flow gradient, general
awareness
04/12/2024 Carr Elementary 40 Share our Water activity, Stormwater Water Use, general
5th Grade word search, verbal instruction pollution
04/15/2024 Carr Elementary 60 Share our Water activity, Stormwater Water Use, general
5th Grade word search, verbal instruction pollution
Total Interactions 670
Total Unique Interactions* 370
*Total Unique Interactions accounts for visiting the same classroom more than once.
Event details for Public Education & Outreach BMP No. 6
Event Date Event Name Individuals Litter Removed Focus Pollutant(s)
Reached
200 lbs of litter removed
- 1 rubber tire
04/20/2024 Dallas Spring 19 - 20ft of plastic hose Floatables, Litter,
Clean - 15 total trash bags Sediment
10 storm drains cleared of vegetative
debris
Event details for Public Education & Outreach BMP No. 8
Report Report Description Responding Underlying Issue Solution
Date Party
Homeowner claims drainage Drainage ditch needs Customer refused our
ditch has filled in on S side Garrison to be dredged and offer to regrade ditch and
04/05/2024 of her driveway, requested Batchelor regraded to allow we denied help placing a
putting in a grate over her adequate storm flow.
grate over her culvert.
culvert to flatten her yard.
Homeowner claims drainage Drainage ditch was
ditch is not graded properly, Garrison not graded properly Pipe was removed, ditch
05/23/2024 leaving standing water in Batchelor due to an old regraded and reseeded
easement between road and walkway and pipe. with grass.
sidewalk of her front yard.
Clogged septic and After confirming there
grease trap, exposed were no detrimental
Restaurant owner has fill dirt sediment with no silt effects to Town of Dallas
in his parking lot w/out silt Zack fence. water intake, this was
06/08/2024 fence. Overflowing grease Foreman, passed to Gaston County
and septic trap is running off Garrison Stormwater as this
in South Fork River near Batchelor property is not within
Town of Dallas water intake. town limits. All pictures
and complaints were
provided.
The homeowner has placed Town ordinance is Public Works Director
plastic pipe in storm drainage too vague. Nothing spoke with homeowner
explicitly stating the and warned about not
ditch. The pipe is connecting homeowner isn't doing similar work again.
06/18/2024 his driveway culvert to his Bill Trudnak
neighbor's culvert. No prior allowed to do this. Town ordinances need to
authorization or engineering be rewritten to be more
plans submitted to Town. encompassing than
currently are.
Part 4 — Public Involvement & Participation BMPs
Permit 3.3.1: Public Input
Ref.
Mechanisms for public involvement that provide for input on stormwater issues and the stormwater
program.
BMP A B C D
No. Schedule for Implementation
Description of BMP Measurable Goal(s)
Implementation Status
10. Public Involvement and Participation
The Town shall provide and 1.The Town will 1.Continuously-
promote mechanisms for public maintain a telephone Permit Years 1-5
involvement that provide for input hotline for citizens to YES
on stormwater issues and the ask stormwater
overall stormwater program. questions and report
stormwater issues.
2.A public meeting will 2.Annually-Permit
be conducted annually Years 1-5
before the Town's Board
of Aldermen to report
on the stormwater Not Implemented in
program and issues of
current concern. FY 23-24
Recognitions will also
be made of
groups/individuals for
volunteer efforts.
11. Stormwater Web Site
The web site will provide 1. Maintain and update 1.Continuously-
information on the Town's the web site, uploading Permit Years 1-5
stormwater program, including the new educational
permit,SWMP,applicable materials,the most
ordinances, and annual reports. recent SWMP, and
The web site will include other pertinent
educational materials developed documents.
by
the Town and links to additional
stormwater educational resources. YES
The web site will also be used to
advertise the stormwater hotline
and opportunities for public
involvement.
Permit 3.3.2: Volunteer Opportunities
Ref.
Measures to provide volunteer opportunities designed to promote ongoing citizen participation.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
•
12. Volunteer Community Involvement Program
The Town shall include and 1.The Town will 1.Annually-Permit PARTIALLY
promote volunteer opportunities sponsor biannual Years 1-5 IMPLEMENTED(Only 1
designed to promote ongoing clean-up events,
event for 23-24)
citizen participation. organizing volunteers to
pick up trash or clean-
up litter from streams
or public rights-of-way Details in table above
that have the potential for Public Education&
to pollute stormwater. Outreach BMP No.6
2.The Town will create 2.Once-Permit Years 1
a drain stenciling
program in which
volunteers can stencil
YES
drains with a message
aimed at preventing
illegal dumping into
storm drains.
3.The Town will 3.Annually—Permit
continue its drain Years 2-5 Not Implemented
stenciling program until No events hosted in
all drains have been FY 23-24
addressed.
Part 5—Illicit Discharge Detection & Elimination BMPs
Permit 3.4.1: MS4 Map
Ref.
Measures to develop, update and maintain a municipal storm sewer system map including stormwater
conveyances,flow direction, major outfalls and waters of the United States receiving stormwater
discharges.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
13. Storm Sewer System Base Map
The Town shall maintain a current 1.The MS4 map will be 1.Once-Permit Year 1
map showing major outfalls and completed,to include
receiving streams. all major outfalls,flow YES
directions,and
receiving waters.
2.Conduct second 2.Annually-Permit Partially Implemented
phase of MS4 map to Year 2-5
add all stormwater
control infrastructure
such as catch basins, Currently undergoing
ditches, storm drainage an infrastructure
pipes, etc. inventory project.
3.Add pertinent state 3.Annually-Permit Partially Implemented
infrastructure to MS4 Years 2-5
map.
Currently undergoing
an infrastructure
inventory project.
4. MS4 map will be 4.Continuously-
monitored and updated Permit Years 2-5 as YES
on an ongoing basis. needed
Permit 3.4.2: Regulatory Mechanism
Ref.
Measures to provide an IDDE ordinance or other regulatory mechanism that provides legal authority to
prohibit, detect, and eliminate illicit connections and discharges, illegal dumping and spills into the
MS4, including enforcement procedures and actions.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
14. Legal Authorities
The Town shall annually review its 1. Develop and adopt 1.Once-Permit Year 1
IDDE ordinances or other an Illegal Discharge
regulatory mechanisms or adopt Detection and
any new ones that provide Elimination(IDDE)
adequate legal authority to prohibit Ordinance establishing YES
illicit connections and discharges the Town's legal
and enforce the IDDE program. authority to prohibit
illicit connections and
discharges.
2. Review and update 2.Annually-Permit
IDDE ordinance if it is Years 2-5
determined that
revisions or additions YES
are necessary to
maintain or enhance
legal authority.
Permit 3.4.3: IDDE Plan
Ref.
Measures to maintain and implement a written IDDE Plan to detect and address illicit discharges, illegal
dumping and any non-stormwater discharges identified as significant contributors of pollutants to the
MS4. The plan shall provide standard procedures and documentation to:
a) Locate priority areas likely to have illicit discharges,
b) Conduct routine dry weather outfall inspections,
c) Identify illicit discharges and trace sources,
d) Eliminate the source(s)of an illicit discharge, and
e) Evaluate and assess the IDDE Program.
BMP A B C D
No. Schedule for Implementation
Description of BMP Measurable Goal(s)
Implementation Status
15. Investigation of Illicit Discharges
The Town shall develop and 1. Develop a written 1.Once-Permit Year 1
maintain a Standard Operating IDDE plan, including
Procedure(SOP)for the SOPs and YES
investigation of potential illicit documentation for
discharges, illicit connections,and Permit Reference 3.4.3
illegal dumping.
2.Submit written IDDE 2.Once—Permit Year 1 Partially Implemented
plan to NCDEQ for
review and approval. Plan is drafted but not
reviewed yet by DEQ.
3. Implement approved 3.Continuously- Partially Implemented
IDDE plan,addressing Permit Years 2-5
issues identified under Plan is drafted but not
Permit Reference 3.4.3. reviewed yet by DEQ.
16. Dry Weather Flows
In accordance with the approved 1. In conformance with 1.Continuously-Permit
IDDE plan,the Town shall conduct the written SOP,staff Years 2-5 Partially
a program for dry weather flow field shall conduct annual Implemented.
observations for the purpose of inspections of all major
detecting and removing the outfalls during dry
sources of illicit discharges. weather flow Staffing not previously
conditions(no rain in available to conduct
previous 72 hours)to formal dry weather
proactively identify and inspections. Informal
eliminate illicit inspections done
discharges and illicit each week.
connections.
Permit 3.4.4: IDDE Tracking
Ref.
Measures for tracking and documenting the date(s)an illicit discharge, illicit connection or illegal
dumping was observed,the results of the investigation, any follow-up of the investigation,the date the
investigation was closed,the issuance of enforcement actions, and the ability to identify chronic
violators.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
17. Track and Document Investigations
In accordance with the approved 1. Develop an Illicit 1.Once-Permit Year 1
IDDE plan,the Town shall track all Discharge Report form YES.
investigations and document the to include observed
date(s)an illegal discharge was illicit discharge
observed,the results of the indicators, date, No Illicit Discharges
investigation, any follow-up of the location,and follow-up reported for FY 23-24.
investigation, and the date the contacts.
investigation was closed. 2. Develop a 2.Once-Permit Year 1
spreadsheet to
consolidate and
monitor the data
collected from the Illicit
Discharge Report
forms. The
spreadsheet should YES
also include the results
of each investigation,
any follow-up actions,
enforcement actions
taken, and date of
closure.
3. Utilize Illicit 3.Continuously-
Discharge Report form Permit Years 2-5
and spreadsheet for all YES
ongoing investigations
of illicit discharges
and/or connections.
Permit 3.4.5: Staff IDDE Training
Ref.
Measures to provide training for municipal staff and contractors who, as part of their normal job
responsibilities, may observe an illicit discharge, illicit connection, illegal dumping or spills. Training
shall include how to identify and report illicit discharges, illicit connections, illegal dumping and spills.
Each staff training event shall be documented, including the agenda/materials, date, and number of staff
participating.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
18. Employee Training
The Town shall implement and 1. Identify and provide 1.Annually-Permit
document a training program for training for Public Years 1-5
appropriate staff who,as part of Works Department staff
their normal job responsibilities, who,as part of their
may come into contact with or normal job
otherwise observe an illegal responsibilities, may
discharge or illicit connection to come into contact with YES
the storm sewer system. or otherwise observe
an illicit discharge or
illicit connection. Details in table below
Training will be
provided in-house or
through the Regional
Stormwater Partnership
or the National
Stormwater Center.
2. Provide training to 2.Annually-Permit
staff in other Town Years 2-5
departments,
YES
particularly drivers of
Town vehicles or those
whose duties require
visits to various Details in table below
locations within the
Town.
3. Utilize the Town's 3.Annually-Permit partially Implemented
Safety Committee as a Years 1-5
means of educating all
Town departments
about the impacts of Staffing not previously
illicit available. Metting for
discharges/connection FY 24-25 has been
s scheduled already.
19. Fact Sheets
Post illicit discharge fact sheets in 1. Develop illicit 1.Once-Permit Year 1
the staff common areas of all discharge fact sheet for YES
department facilities as a reminder display.
of the basics of identifying and
reporting illicit discharges, 2. Post illicit discharge 2.Annually-Permit 1 in Town Hall
connections,and dumping. fact sheets in each Years 2-5
departmental facility. 1 in Public Works
Warehouse
Permit 3.4.6: IDDE Reporting
Ref.
Measures for the public and staff to report illicit discharges, illegal dumping and spills.The mechanism
shall be publicized to facilitate reporting and shall be managed to provide rapid response by
appropriately trained personnel.
A B C D
BMP
No. Schedule for Implementation
Description of BMP Measurable Goal(s)
Implementation Status
20. Public Education
The Town shall inform staff, 1.The Town will use 1.Continuously-
businesses,and the general public various means of Permit Years 1-5
of hazards associated with illegal communication(utility
discharges and improper disposal bill flyers, newsletter,
of waste. website, Facebook,
electronic message
YES
board, etc.)to provide
general information on
the hazards associated
with illegal discharges
and the improper
disposal of waste.
21. Reporting Mechanism
The Town shall promote, publicize, 1.The Town maintain a 1.Continuously-
and facilitate a reporting stormwater hotline Permit Years 1-5
mechanism for the public and staff phone number and
to report illicit discharges and responsible party to YES
establish and implement citizen which the public can
request response procedures. report illicit discharge
issues or ask
questions.
2.Additional staff will 2.Annually-Permit
be trained to take Year 2-5 YES
stormwater calls and
answer questions.
3. Publicize the hotline 3.Continuously-Permit
number through the Years 1-5 YES
website and other
selected mechanisms.
4.The Town's website 4.Continuously-
will also include a Permit Year 2-5
reporting mechanism
whereby the public can YES
report illicit discharge
issues or ask
questions.
22. Enforcement
The Town shall implement a 1. Utilize a spreadsheet 1.Continuously-
mechanism to track the issuance to consolidate and Permit Years 2-5
of NOVs and enforcement actions. monitor the data
This mechanism shall include the collected from the Illicit Partially
ability to identify chronic violators Discharge Report Implemented.
for initiation of actions to reduce forms. The
non-compliance. spreadsheet should
also include the results
of each investigation, Historical data for
any follow-up actions, past FY needs to be
enforcement actions added.
taken (including the
issuance of NOVs),and
date of closure.
Details for Staff IDDE Training BMP No. 18
Training Date Training Topic Training Facilitator # of Participants
04/02/2024 Pollutants and Reporting Garrison Batchelor - Town of Dallas 12
Part 6 - Construction Site Runoff Control
Permit 3.5.6: Public Input
Ref.
Measures to provide and promote a means for the public to notify the appropriate authorities of
observed erosion and sedimentation problems.
A B C D
BMP
No. Schedule for
Description of BMP Measurable Goal(s) Implementation Status
Implementation
23. Municipal Staff Training
Train municipal staff who receive 1.Annually—Permit
1.Train municipal staff YES
calls from the public on the Years 1-5
protocols for referral and tracking on proper handling of
construction site runoff B.Trudnak,Z.
of construction site runoff control control complaints. Foreman,G. Batchelor.
complaints.
24. Stormwater Hotline
The Town shall provide and 1.The Town will 1.Continuously-
promote mechanisms for public maintain a telephone Permit Years 1-5
involvement that provide for input hotline for citizens to YES
on stormwater issues and the ask stormwater
overall stormwater program. questions and report
stormwater issues.
Permit 3.5.5: Waste Management
Ref.
Measures to require construction site operators to control waste such as discarded building materials,
concrete truck washout, chemicals, litter, and sanitary waste at the construction site that may cause
adverse impact to water quality.
A B C D
BMP
No. Schedule for
Description of BMP Measurable Goal(s) Implementation Status
Implementation
25. Control of Construction Waste
Whereas Section 11 of the Gaston 1. Train Town staff on 1.Annually-Permit YES
County Sedimentation and Erosion improper handling or Year 1.Additional
Control Ordinance designates control of construction annual training to new
waste from construction sites as waste and on reporting personnel in permit
part of the land-disturbing activity of such activities. years 2-5 as needed.
subject to the provisions of the
ordinance,Town staff will be 2. Report suspected 2.Continuously- Partially Implemented
provided training to report violations to Gaston Permit Years 1-5
County. following completion No documented record
violations of this provision to of incidents. Incidents
Gaston County officials. of training.
are typically reported
without
documentation.
Part 7-Post-Construction Site Runoff Control BMPs
Permit 3.6.5(a), 3.6.5(b), and 4.1.3: Minimum Post-Construction Reporting Requirements
Ref.
Measures to document activities over the course of the fiscal year(July 1 —June 30) including
appropriate information to accurately describe progress, status, and results.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
26. Standard Reporting
Implement standardized tracking, 1.Track number of low 1.Continuously— Partially Implemented
documentation, inspections and density and high Permit Years 1-5
reporting mechanisms to compile density plan reviews Records kept by
appropriate data for the annual performed. Gaston County, not
self-assessment process. Town of Dallas.This
will be fixed for next
FY(24-25)
2.Track number of low 2.Continuously— Partially Implemented
density and high Permit Years 1-5
density plans approved. Records kept by
Gaston County, not
Town of Dallas.This
will be fixed for next
FY(24-25)
4.Track number of SCM 4.Continuously— YES
inspections performed. Permit Years 1-5
5.Track number of low 5.Continuously— Partially Implemented
density inspections Permit Years 1-5
performed. Records kept by
Gaston County, not
Town of Dallas.This
will be fixed for next
FY(24-25)
6.Track number and 6.Continuously— Partially Implemented
type of enforcement Permit Years 1-5
actions taken. Records kept by
Gaston County, not
Town of Dallas.This
will be fixed for next
FY(24-25)
Permit 3.6.2: Legal Authority
Ref.
Measures to maintain adequate legal authorities through ordinance or other regulatory mechanism to:
(a) review designs and proposals for new development and redevelopment to determine whether
adequate stormwater control measures will be installed, implemented, and maintained, (b) request
information such as stormwater plans, inspection reports, monitoring results, and other information
deemed necessary to evaluate compliance with the Post-Construction Stormwater Management
Program, and (c)enter private property for the purpose of inspecting at reasonable times any facilities,
equipment, practices, or operations related to stormwater discharges to determine whether there is
compliance with the Post-Construction Stormwater Management Program.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
27. Adequate Legal Authorities
The Town shall annually review its 1.Town staff will 1.Annually-Permit
or other mechanisms to ensure conduct an annual Years 1-5 YES
there are adequate legal review of its
authorities to meet the objectives compliance with the
of the Post-Construction Site objectives of the Post- New ordinances are
Runoff Control Stormwater Construction Site being drafted to
Management Program. Runoff Controls restructure and
program to determine broaden stormwater
the adequacy of its protections
legal authorities.
Permit 3.6.3: Plan Review and Approval
Ref.
Measures to maintain plan review and approval authority, standards and procedures to:(a)Require
Federal, State, and local government projects to comply with Post-Construction Program requirements
throughout the entire MS4 permitted area, unless the entity is subject to its own NPDES MS4 permit or a
qualifying alternative program, (b) Conduct site plan reviews of all new development and redeveloped
sites that disturb greater than or equal to one acre, and sites that disturb less than one acre that are part
of a larger common plan of development or sale for compliance with 15A NCAC 02H.1017 and the
qualifying alternative programs that apply within your jurisdiction, (c)Ensure that each project has an
Operation and Maintenance Agreement that complies with 15A NCAC 02H.1050(12), (d)Ensure that
each project has an Operation and Maintenance Plan that complies with 15A NCAC 02H.1050(13), (e)
Ensure that each project has recorded deed restrictions and protective covenants, that require the
project to be maintained consistent with approved plans, and(f)Ensure that each SCM and associated
maintenance accesses be protected in a permanent recorded easement per 15A NCAC 02H 1050(9)
and(10).
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
28. Plan Reviews
The Town shall conduct site plan 1.All new development 1.Continuously-
reviews of all new development and redevelopment Permit Years 1-5
and redevelopment to determine activity will be reviewed
whether adequate stormwater by Town staff for YES
control measures will be installed, compliance with the
implemented,and maintained to appropriate stormwater
meet established standards. management design
standards.
2.Staff 2.Continuously-
recommendations on Permit Years 1-5
new development and
redevelopment
activities will be
presented to the Dallas YES
Planning Board for
formal
recommendations to
the Board of Aldermen
on plan approval.
3. Planning Board 3.Continuously-
recommendations on Permit Years 1-5
new development and
redevelopment
activities will be YES
presented to the Dallas
Board of Aldermen for
final action on plan
approval.
29. Deed Restrictions/Covenants
The Town shall provide 1.Town staff will 1.Continuously-
mechanisms such as recorded maintain copies of and Permit Years 1-5
deed restrictions and protective aid in ensuring
covenants that ensure compliance with all
development activities will be covenants as required YES
consistent with approved plans. by the Gaston County
Stormwater Ordinance
to guarantee continued
maintenance.
30. Operations&Maintenance Plan
The Town shall require an 1.Town staff will obtain 1.Continuously partially Implemented
Operations and Maintenance and maintain copies of Permit Years 1-5
(O&M)plan for the long-term all O&M plans as
operations of structural BMPs required by the Gaston
required by the program. Owners County Stormwater Town Engineer has
of structural BMPs must have Ordinance to guarantee copies of most O&M
annual inspections conducted by continued agreements but not
a qualified professional. maintenance. all.
2.Town staff will obtain 2.Continuously-
and maintain copies of Permit Years 1-5 Partially Implemented
all annual inspection
reports as required by
the Gaston County Town Engineer has
Stormwater Ordinance records of most
to verify proper annual reports,but
operation and not all.
maintenance.
Permit 3.6.4: Inspections and Enforcement
Ref.
Measures to maintain inspection and enforcement authority, standards and procedures to:(a)Conduct
post-construction inspections prior to issuing a Certificate of Occupancy or a Temporary Certificate of
Occupancy.Alternatively, the project owner may provide a surety bond to guarantee compliance with
the approved plan(s), (b)Ensure that the project has been constructed in accordance with the approved
plan(s), (c)Ensure annual inspection of each permitted SCM to ensure compliance with the approved
Operation and Maintenance Agreement, (d)Ensure inspection of low density projects at least once
during the permit term, and(e)Require that inspections be conducted by a qualified professional
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
31. Inspections
The Town shall have the authority 1. Utilizing the access 1.Annually-Permit
to enter private property for the authority provided by Years 1-5 Partially Implemented
purpose of inspecting any the Gaston County
facilities,equipment, practices or Stormwater Ordinance,
operations related to stormwater Town staff will conduct Responsibility for
discharges to determine annual inspections to inspections moving
compliance with Post- ensure compliance from Town Engineer to
Construction Stormwater with Post-Construction Stormwater
Management Program. requirements by each Administrator.
SCM.
2. Based on inspection 2.Annually-Permit
findings, report any Years 1-5
issues of non-
compliance to the
Gaston County Natural YES
Resources Department
for formal follow-up
action.
32. Monitoring
The Town shall request information 1..Town staff will 1.Continuously-
such as stormwater plans, obtain and maintain Permit Years 1-5
inspections reports, monitoring copies of all
results, and other information stormwater plans,
necessary to evaluate compliance inspection reports,and
with Post-Construction other related
Stormwater Management documents as required YES
Program. by the Gaston County
Stormwater Ordinance
to guarantee continued
compliance with the
Post-Construction
program.
Permit 3.6.6: Fecal Coliform Reduction
Ref.
Measures to control,to the maximum extent practicable, sources of fecal coliform per 15A NCAC 02H
.1017(7). At a minimum,the program shall include: (a)A pet waste management component,which
may be achieved by revising an existing litter ordinance, and (b)An on-site domestic wastewater
treatment system component, if applicable,which may be coordinated with local county health
department,to ensure proper operation and maintenance of such systems.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
This permit requirement is fully met by the existing post-construction program as YES
referenced in Table 19.
Part 8—Pollution Prevention & Good Housekeeping
Permit 3.7.1: Municipal Facilities Operation and Maintenance Program
Ref.
Measures to manage facilities that are owned and operated by the permittee and have the potential for generating
polluted stormwater runoff. The permittee shall maintain a current inventory of municipal facilities; perform facility
inspections and routine maintenance;establish specific frequencies,schedules,and standard documentation;
provide staff training on general stormwater awareness and implementing pollution prevention and good
housekeeping practices.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
33. Inventory of Facilities
The Town shall maintain a current 1.Compile list of 1.Once-Permit Year 1
inventory of facilities and current Town-owned YES
operations owned and operated by facilities.
the permittee with the potential for
generating polluted stormwater 2. Perform initial 2.Once-Permit Year 1
runoff. inspection of facilities for current facilities.
for potential to Annually-Permit Years
generate polluted 1-5 for facilities added YES
stormwater runoff and to the list.
classify each facility as
high or low potential.
3. Perform annual 3.Annually-Permit
inspection of facilities Years 2-5
classified as having
high potential for YES
generating polluted
stormwater runoff.
4. Update list as 4.Annually-Permit
facilities are added or Years 1-57 YES
closed.
34. O&M for Municipal Facilities
The Town shall maintain, 1. Develop and 1.Once-Permit Year 2
implement,assess annually,and implement an O&M
update as necessary an Operations plan for each high
and Maintenance(O&M)program potential facility that
for municipally owned and includes proactive YES
operated facilities. schedules,standard
documentation,staff
responsibilities,and
proper maintenance
training.
2. Perform regular 2.Annually-Permit
inspections on each Years 2-5
high potential facility in YES
accordance with the
O&M program.
3.Verify,document, 3.Annually-Permit
and prioritize Years 2-5
stormwater
YES
maintenance activities
identified by
inspections.
Permit 3.7.2: Spill Response Program
Ref.
Measures for facilities and operations that store and/or use materials that have the potential to contaminate
stormwater runoff if spilled. The permittee shall maintain written spill response procedures and train staff on spill
response procedures.
A B C D
BMP
No. Schedule for Implementation
Description of BMP Measurable Goal(s)
Implementation Status
35. Spill Response Procedures
The Town shall have written spill 1. Review written spill 1.Once-Permit Year 1
response procedures for response procedures YES
municipally owned and operated for thoroughness.
facilities.
2. Review specific spill 2.Once-Permit Year 1
response procedures
for facilities identified YES
as having potential for
high hazard spills.
3. Update written spill 3.Annually-Permit
response procedures Years 2-5
due to changes in YES
facilities or operations.
4.Train Public Works 4.Annually-Permit
and Fire Department Years 1-5
staff on spill response YES
procedures.
5.Train staff at facilities 5.Annually—Permit
designated high hazard Years 1-5
potential on spill YES
response procedures.
1 Permit 3.7.3: MS4 Operation and Maintenance Program
Ref.
Measures to minimize pollutants in the stormwater collection system. The permittee shall provide operation and
maintenance staff training on stormwater awareness and pollution prevention, perform MS4 inspections, maintain
the collection system including catch basins and conveyances;and establish specific frequencies,schedules,and
standard documentation.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
36. Staff Training
The Town shall implement a 1. Develop and 1.Once-Permit Year 1 .
training program for employees implement a training
involved in implementing pollution program on stormwater
prevention and good housekeeping awareness and YES
practices. pollution prevention for
all Town employees
involved in these
activities.
2. Provide initial training 2.Once-Permit Year 2
for all employees
involved in these YES
activities.
3. Provide ongoing 3.Annually-Permit
training for all Years 3-5
appropriate employees, YES
including new
employees.
37. MS4 Collection System Inspections and Maintenance
The Town will develop and 1. Develop a plan that 1.Once—Permit Year 1
implement a plan for ongoing MS4 includes inspection
system maintenance, requiring schedules,staff YES
regular inspections and responsibilities,and
maintenance. proper maintenance
activities.
2. Perform regular 2.Continuously—
inspections of MS4 Permit Years 2-5 as YES
collection system in called for in plan.
accordance with plan.
3. Perform regular 3.Continuously—
maintenance of MS4 Permit Years 2-5 as YES
collection system in called for in plan.
accordance with plan.
Permit 3.7.4: Municipal SCM Operation and Maintenance Program
Ref.
Measures to manage municipally-owned, operated,and/or maintained structural stromwater control measures
(SCMs)that are installed for compliance with the permittee's post-construction program. The permittee shall
maintain a current inventory of SCMs, perform SCM inspections and maintenance,and shall establish specific
frequencies,schedules,and documentation.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
38. Stormwater Controls Inventory
The Town shall maintain an 1. Develop an inventory 1.Once-Permit Year 1 .
inventory of municipally owned or of existing Town-owned
operated structural stormwater SCMs with information
controls installed for compliance including type,year YES
with the Town's post-construction built,date of last
ordinance. inspection,and
maintenance actions.
2. Update inventory as 2.Continuously-
required by new Permit Year 1-5 as
development activity required following YES
and related facilities. completion of initial
inventory.
39. O&M for Stormwater Controls
Within 12 months the Town shall 1. Develop and 1.Once-Permit Year 2
develop and implement an O&M implement an O&M
plan for municipally owned or plan for each Town
operated structural controls, owned or controlled
specifying the frequency of SCM that includes
inspections and routine proactive schedules, YES
maintenance. All inspections and standard
maintenance shall be documentation,staff
documented. responsibilities,and
proper maintenance
training.
2. Perform regular 2.Continuously-
inspections on each Permit Years 2-5 as YES
SCM in accordance called for in O&M plan.
with the O&M plan.
3.Verify,document, 3.Continuously-
and prioritize SCM Permit Years 2-5 as
maintenance activities called for in O&M plan. YES
identified by
inspections.
4.Obtain inventory of 4.Once-Permit Year 3
NCDOT-owned or
controlled SCMs for YES
addition to Town's
inventory.
Permit 3.7.5: Pesticide, Herbicide and Fertilizer Management Program
Ref.
Measures to minimize water quality impacts from the use of landscape chemicals. The permittee shall provide
routine pollution prevention and chemical use,storage and handling training,and shall ensure compliance with
permits and applicator certifications.
A B C D
BMP
No. Schedule for Implementation
Description of BMP Measurable Goal(s)
Implementation Status
40. Pesticide,Herbicide,and Fertilizer Application Management
The Town shall ensure that 1. Ensure that current 1.Annually-Permit
municipal employees and Public Works and Parks Year 1-5
contractors are properly trained &Recreation
and that all permits,certifications, employees holding
and other measures for applicators certifications for
are followed. pesticide, herbicide, YES
and fertilizer
application attend the
training required to
maintain those
certifications.
2. Provide training 2.Annually-Permit
opportunities for Years 2-5 as necessary.
additional employees YES
to obtain application
certification as
determined necessary.
3. Develop or identify 3.Once-Permit Year 2
pollution prevention
and chemical use, YES
storage, and handling
training program.
4. Provide staff training 4.Annually-Permit
in pollution prevention Years 3-5 YES
and chemical use,
storage, and handling.
Permit 3.7.6: Vehicle and Equipment Maintenance Program
Ref.
Measures to prevent and minimize contamination of stormwater runoff from areas used for municipal vehicles and
equipment maintenance and/or cleaning. The permittee shall ensure that municipal industrial facilities subject to
NPDES industrial permitting comply with those permit requirements, provide routine pollution prevention training
to staff, perform routine inspections,and establish specific frequencies,schedules,and documentation.
A B C D
BMP
No. Schedule for Implementation
Description of BMP Measurable Goal(s)
Implementation Status
41. Prevent/Minimize Stormwater Runoff from Vehicle/Equipment Cleaning Areas
The Town shall describe and 1. Develop an 1.Once-Permit Year 2
implement measures to prevent or inspection checklist to
minimize stormwater runoff ensure that vehicle and
contamination from all areas used equipment facilities are
for vehicle and equipment following proper YES
cleaning. procedures to minimize
water quality impacts
from vehicle and
equipment cleaning
and maintenance.
2. Perform inspections 2. Bi-annually-Permit .
of appropriate facilities Years 2-5
using inspection
checklist and follow-up YES
on any corrective
actions needed.
3. Perform re- 3. Bi-annually-Permit
inspection of any Years 2-5 as necessary. YES
facility that required
corrective action.
42. Staff Training
The Town shall provide general 1. Develop a training 1.Once-Permit Year 1
stormwater awareness and program on stormwater
pollution prevention training to awareness and
employees working in pollution prevention for YES
vehicle/equipment cleaning and all Town employees
maintenance areas. involved in these
activities.
2.Conduct training on 2.Annually—Permit
stormwater awareness Years 2-5
and pollution
YES
prevention for all Town
employees involved in
these activities.
Permit 3.7.7: Pavement Management Program
Ref.
Measures to reduce pollutants in stormwater runoff from municipally-owned streets, roads,and parking lots within
the permittee's corporate limits. The permittee shall implement measures to control litter, leaves,debris,
particulate and fluid pollutants associated with vehicles,and establish specific frequencies,schedules, and
documentation.
A B C D
BMP
No. Description of BMP Measurable Goal(s) Schedule for Implementation
Implementation Status
43. Streets, Roads,and Public Parking Lots Maintenance
The Town shall evaluate BMPs to 1.The Town will 1.Continuously-
reduce polluted stormwater runoff maintain its program of Permit Years 1-5
from municipally owned streets, regular trash and
roads,and public parking lots leaf/yard waste
within the Town limits. Within 12 collection to reduce the YES
months,the Town must update its amount of potential
Stormwater Plan to include the debris washed into
BMPs selected. storm drains following
rain events.
2. Implement a 2.Continuously-
program of regular Permit Years 1-5
YES
storm drain/catch basin
cleaning
3. Publicize the 3.Annually—Permit
schedule for trash and Years 1-5
leaf collection and YES
record the volumes
collected.
44. Vehicle Spill Cleanup
The Town shall establish an 1. Develop specific 1.Once-Permit Year 1
organized vehicle spill cleanup vehicle spill response YES
response to prevent or minimize procedures for dealing
pollutants from vehicle accidents with vehicle accidents.
from entering the storm drain
system. 2.Train Public Works 2.Annually-Permit
and Fire Department Years 2-5
staff in vehicle spill YES
response procedures.