Loading...
HomeMy WebLinkAboutNCC223678_NOT Closeout Documents_20240719 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699 County: Stanly Project: Richfield Climate Control Expansion River basin: Yadkin-PeeDee Person financially responsible:505 E.Church St.,LLC-Joshua Davis,Managing Project#: STANL-2023-005 Member Address: PO Box 221633,700 East Morehead Street,Suite 100B, 1. Project Location: Church Street,Richfield Pictures: No 2. Weather and soil conditions: Sunny,no activity Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: May 23,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have questions,contact me at Joshawa.Billiot@deq.nc.gov or by phone at(704) 235-2133. Reported by: Joshawa Billiot Others present: Date of inspection: May 22,2024 Time arriving on site: 02:00 PM Time leaving site: 02:30 PM CC: