Loading...
HomeMy WebLinkAboutWQ0002927_Monitoring - 03-2024_20240417Monitoring Report Submittal Permit Number#* WQ0002927 Name of Facility:* Domtar Paper Company, LLC - Bonsai Chip Mill Month: * March Year: * 2024 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR 03.24 BCM NDMR.pdf 1.59MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address: * john.cecil@domtar.com Name of Submitter: * John T Cecil Signature: 631;�'.Y kv&w Date of submittal: 4/17/2024 This will be filled in automatically Initial Review Reviewer: Wanda.Gerald Is the project number correct?* W00002927 Is the monitoring report accepted?* Yes NO Regional Office* Raleigh Reviewer: _anonymous Review Date: 7/22/2024 FORM NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page _ I of c Permit No.: WQ0002927 Facility Name: Domtar Paper Company, L.L.C. county: Chatham Month: March Year: 2024 PPI: 001 Flow Measuring Point: InFluent _Effluent No Flow generated Parameter Monitoring Point: 7T7T Z o z 0 mg/L mg/L mg/L mFluent Effluent ] Groundwater towering surface water Parameter Code P 50050 00400 50060 00310 006107:; 00665 i E F O C O E +-' ~ O ; O 2 a IG O C t°- n° d LE � U N O C O E Q (n P «O ° ui H O r a 24-hr hrs 1 2 GPD 41 41 su mg/L mg/L mg/L mg/L #/100 mL mg/L 3 41 4 12:00 0.42 41 672 0.64 5 36 6 36 7 39 36 8 36 9 36 10 36 11 12:00 0.42 36 6.78 0.57 12 48 13 48 14 48 15 48 16 48 17 48 18 16:50 0A2 48 6.71 0.41 19 37 20 21 37 37 22 37 23 37 24 37 25 126 1 1 55 0 42 37 668 0.36 41 27 41 28 41 29 41 30 41 31 41 AverageL48 41 0.50 Daily Maximum 6.78 0.64Daily Minimum6 6-68 0.36 Sampling Type: Monthly Avg. Limit: Daily Limit: Sample Frequency: FORM NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page �t of Sampling Person(s) II Certified Laboratories Name: Randall Jarrell Name: Eurofins (591) Name: Name: Wastewater Management, L.L.C. (5038) Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? f compliant Non -compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification Permittee: Domtar Paper Company, L.L.C. ORC: Randall Jarrell Certification No.: 7937, 23925 Signing Official: John T Cecil Grade: WW4, SI Phone Number: 919-210-2500 Signing Official's Title: District Forester Has the ORC changed since the previous NDMR? I Yes =j No Phone Number: 919-545-4571 Permit Expiration: 7/31/2028 -12� 'e u —1 l C Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inof the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page � _ of No.: WQ0002927 Facility Narne: Domtar Paper Company, L.L.C. Month:Permit County: Chatham 1 Nary Field Name: • • . • • Fiel• •Field at this facility? 1Area (acres): Area (acre! Area (acres): Cover Crop: Cover Crop: Cover Crop: Cover C • Hurly- 1Hourly• •. Annual Rate® - ••. .. •• • .. •• •Field Irrigated?• •. •• ■ 1 •1 1 11 -_---_---_- �_____ © 1 11 1 /, -_Elm --_---_- ___ �© 1 11 1 11 1 / / 1 / 1 -_-- -_-- -_-- -_-- -_-- Elm�© © 1 11 1 11 -----_Elm --Elm Elm 11M Elm Elm ME 11MME m-_-- _--_---_-- -_-_ • 1 �-_� / / 1 1 1 / Elm -_-- -_-- ®___-_ ®® 1 • 1 1 • 1 -_---_ME -_-Elm Alm -_-mom -_- 12 Month Monthly Floating Loading:' Total (in): lmmwm� � elm FORMNDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page Lt of S Did the application rates exceed the limits in Attachment B of your permit? Q Compliant ❑ Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? 0 Compliant ❑ Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? Q Compliant ❑ Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? Q Compliant ❑ Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? [�] Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Randall Jarrell Permittee: Domtar Paper Company, L.L.C. Certification No.: 7937, 23925 Signing Official: John T. Cecil Grade: WW4, SI Phone Number: 919-210-2500 Signing Officials Title: District Forester Has the ORC changed since the previous NDAR-1? ` Yes No Phone Number: 919-545-4571 Permit Exp.: 7/31/28 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief. true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 } Domtar 12 Month Rolling Total Application In Inches 2024 2024 2024 2023 2023 2023 2023 2023 2023 2023 2023 2023 2024 Field Jan Feb March April MaLy June July August Sept Oct Nov Dec Total 1 0.43 0.13 0.11 0.08 0.14 0.1 0.09 0.1 0.1 0.09 0.09 0.09 1.55