Loading...
HomeMy WebLinkAboutNCC242189_ESC Approval Submitted_20240718 Ray Bissram From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov> Sent: Tuesday,June 4, 2024 9:01 AM To: Forsyth Technical Community College; Rav Bissram Subject: NC DEMLR - FROF Application Approval with Modifications Needed CRM:0104234 Attachments: Application Report - Tuesday, June 4, 2024 810 AM.pdf; FORSY-2024-0125 Forsyth Tech Stream Restoration Phase 2.pdf STAT . ♦ - MAY 2q l2js >, 4, plkv , . Oi -=•tiP • �i %,, es f`12. 177„� * , r Sf QUAM - x =- North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Roy Cooper Governor Elizabeth S. Biser Secretary William Vinson Jr. (Acting) Director 06-04-2024 Forsyth Technical Community College FTCC Winston-Salem, NC 27103 RE: Project Name: Forsyth Tech Stream Restoration Phase 2 Acres Approved:0.98 Application ID: PA-004755 Permit Number: FORSY-2024-0125 i Address:2100 Silas Creek Parkway City:Winston Salem County: Forsyth River Basin:Yadkin-Pee Dee Stream Classification: C:Aquatic Life,Secondary Contact Recreation, Fresh water Plan Type: New Plan Dear Forsyth Technical Community College, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOl form may be accessed atdeq.nc.gov/NCG01. Please directquestions about the eNOlform totheStormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a newCOC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan, not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. 2 General Comments: 1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application. 2.Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800 and asking to speak with the Land Quality inspector for your county. Permission must be obtained and granted from NC DEQ DEMLR prior to the removal of any ESC measures. All additional permits should be obtained, as necessary, prior to beginning construction. [GS 113A-51, 15A NCAC 4B .0120] 3.Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110] 4. Be advised the financially responsible party must have all retaining walls over 4 feet designed, sealed, and construction certified by a professional engineer licensed in North Carolina in accordance with all state and local building codes/ordinances. This plan review is for erosion and sediment control and construction stormwater during construction only and does not include approval of retaining wall construction or slope-stability analysis. [North Carolina Building Code 1807] 5.Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 6. The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly NCG01 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate NCG01 coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment] Your cooperation is appreciated. Sincerely, Nicole Chiles, PE - Assistant Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Attachments: Certificate of Approval FRO Application Report 3 ..••■---••=mA North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 I Winston-Salem NC, 27105 336-776-9800 Department of Emrommotai OrWq Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 4