Loading...
HomeMy WebLinkAboutNCC242042_ESC Approval Submitted_20240718 Iredell County Planning & Development `'' Erosion Control Section I R E D E L L 349 North Center Street u " ' ' P.O. Box 788 Statesville, NC 28687 Date: January 8'h 2024 LETTER OF APPROVAL WITH MODIFICATIONS Dominic Ferrovecchio 2357 Statesville Hwy, LLC 117 CrossIake Park Dr. Mooresville,NC 28117 RE: Project Name: Kilburn Court Apartments Acres Approved with Modifications: 5.5 Project ID: MVLLE-2024-060 Project Location: PIN 4668008270.000 Submitted By: Blue Ridge Engineering, PLLC Date Received: December 1 1th 2023 Plan Type: New Dear Mr. Ferrovecchio: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. 113A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the Letter of Approval with Modifications Kilburn Court Apartments January 8th 2024 Page 2 of 4 commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the applicable annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form and fee details may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. As required in the approved plan construction sequencing, please schedule a preconstruction conference with our staff prior to land disturbing activity. Your cooperation is appreciated. Sincerely, ce;e7r7414._ z/, L Jonathan Williams, CESSWI Erosion Control Coordinator Enclosures: Modifications Fact Sheet on the New NCGOI Permit Permit Letter of Approval with Modifications Kilburn Court Apartments January 8th 2024 Page 3 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Kilburn Court Apartments Project ID: MVLLE-2024-060 County: Iredell Reviewed by: Jonathan Williams Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. 1. If the construction site is to be accessed by Highway 115, add construction entrance at the entry/exit point for existing paved area. If Hwy 115 is proposed to not be used for site access, suggest blocking access to ensure it is not used mistakenly.—RC 2. Install and locate all diversions to direct as much of the basin drainage area as possible to the head of the basins, behind the 3`d baffle furthest from the skimmer. —RC 3. Close silt fence gap below Basin 1. —RC 4. Extend silt fence to the highway right-of-way on the downslope side of the current entrance from the highway. —RC 5. Provide inlet and outlet protection for all existing culvert pipes in the highway right-of- way within the limits of disturbance.—RC 6. Extend Basin 2 skimmer pipe to the silt fence so that the treated discharge does not travel across disturbed ground to leave the limits of disturbance.—RC 7. Delineate Basin 2 emergency spillway location on the plan. —RC 8. In the Construction Sequence add a step to clear only as needed to install erosion control measures and contact Iredell County for an initial inspection prior to mass grading of the site.—RC 9. In the Phase 2 Construction Sequence, notate that diversions may be shifted as needed to bring the site to permanent grade but cannot be removed until permission has been given to remove by Iredell County Erosion Control.—RC 10. In the Phase 2 Construction Sequence, notate the baffles and skimmer cannot be removed from Basin 1 until permission has been given to remove by Iredell County Erosion Control. —RC 11. Until road/parking lot and curb has been installed, use wire backed stone inlet protection in place of or in addition to silt sack inlet protection. Provide detail.—RC 12. Provide a temporary sediment basin installation and maintenance detail, including skimmer to riser connection.—RC 13. Provide a dust control detail. —RC 14. Ensure Basin 2 drainage and disturbed areas are correct in the calculations booklet.—RC 15. Correct Basin 2 labeled as Basin 1 in the calculations booklet. -RC Letter of Approval with Modifications Kilburn Court Apartments January 8th 2024 Page 4 of 4