Loading...
HomeMy WebLinkAboutSW7971015_CURRENT PERMIT_20210802 �q t!5z-(J ROY COOPER Governor ELIZABETH S.BISER Secretary BRIAN WRENN NORTH CAROLINA Drrector Environmental Quality August 2, 2021 United States Marine Corps Marine Corps Air Station Attention: Anthony A. Ference, Deputy Facilities Director PSC Box 8006 Cherry Point, NC 28833 Subject: Stormwater Permit Renewal Stormwater Management Permit SW7971015 MCAS Cherry Point— Operations/Maintenance Facility Craven County Dear Mr. Ference: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SV 7971015 for a stormwater treatment system consisting of a wet detention pond serving the Operations/Maintenance Facility located off Roosevelt Blvd. expires on January 17, 2022. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Application forms for renewal can be found on our website at: https://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-latid- rules/stormwater-program/post-construction. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application form. You can request a copy by e-mailing me at roger.thorpeCbncdenr.Qov. Sincerely, Roger K. Thorpe Environmental Engineer 'X oft t� North Carolina Depi n arent of Environmental Quality Division et Energy.Mineral and Land Resources wE �1/ Wa..ningtnn fieglonal OFR(e 043 Washington Square Mall I Washington.North Carolina 278A9 A W 0. o�OF:W...rFRQ Michael F.Easley,Governor 9 William G.Ross Jr.,Secretary r North Carolina Department of Environment and Natural Resources Coleen H.Sullins,Director Division of Water Quality January 17, 2008 Mr. G.W. Radford Environmental Affairs Department Marine Corps Air Station Cherry Point PSC Box 8006 Cherry Point, NC 28533 Subject: Permit No. SW7971015 Renewal MCAS Cherry Point Operations/Maintenance Facility High Density Stormwater Project Craven County Dear Mr. Radford: The Washington Regional Office received a completed Stormwater Renewal Application for the subject project on November 15, 2006. We are forwarding Permit No. SW7971015 dated January 17, 2008 to Marine Corps Air Station, Cherry Point for a wet detention pond to serve the Operations/Maintenance facility located off Roosevelt Blvd. at the Marine Corps Air Station in Cherry Point, NC. I r In This permit shall be effective from the date of issuance until January 17, 2018 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. The issuance of this permit does not resolve any previous violations of the stormwater rules for construction without a permit. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Roger Thorpe or me at(252) 946-6481. 77'1. Al Hodge, on Supervisor Surface Water Protection Section Washington Regional Office cc: L.�a shington Regional Office Central Files North Carolina Division of Water Quality Internet: ,ncaptc_qualm�i, One 943 Washington Square Mall Phone)25'_)946-6481 North Carolina Washington,NC 27889 Fax (252)946-9215 Naturally State Stormwater Management Systems Permit No. SW7971015 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Marine Corps Air Station,Cherry Point Operations/Maintenance Facility Craven County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 21-1.1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for a wet detention pond to serve the Operations/ Maintenance Facility located off Roosevelt Blvd. at the Marine Corps Air Station in Cherry Point, NC. This permit shall be effective from the date of issuance until January 17, 2018 and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 2 of this permit, the Project Data Sheet. 3. A maximum of 16.08 acres of built upon area is allowed on this 18.48 acre project site. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with approved plans. 5. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. DIVISION OF WATER QUALITY PROJECT DATA Project Name: MCAS Operations/Maintenance Facility Permit Number: SW7971015 Location: Craven County Applicant: MCAS, Cherry Point Mailing Address: PSC Box 8006 Cherry Point, NC 28533-0006 Application Date: 11/15/2007 Receiving Stream: UT to Slocum Creek Classification of Water Body: SC—NSW Project area: 18.48 ac Drainage Area: 18.48 ac Total Impervious allowed: 16.08 ac Pond Depth: 4.25 ft Required Storage Volume: 42,290 cf Provided Storage Volume: 42,290 of Required Surface Area: 1.19 ac Provided Surface Area: 1.19 ac Overflow Elevation: 4 in orifice 6. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 7. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built-upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 8. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE 1. The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: a. Semiannual scheduled inspections(every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall, Washington, North Carolina, 27889, attention Division of Water Quality. 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the project. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143- 215.6(a)to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 6. The Permittee, at least six(6) months prior to the expiration of this permit, shall submit in writing a request for an extension along with appropriate application fee. Permit issued this the 17 th day of January 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION L for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7971015