Loading...
HomeMy WebLinkAbout[External] Notice of As-built Credit Release Approval/RES Yadkin 01 UMB - Green Mesa Site/SAW-2017-01466/Yadkin CountyCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon Jamey and Daniel, This correspondence is in reference to the monitoring report and credit release request submitted for the RES Yadkin 01 Umbrella Mitigation Bank, Green Mesa Mitigation Site, Action ID SAW-2017-01466. The purpose of this letter is to transmit comments provided by the NC Interagency Review Team (NCIRT) during the review of the monitoring report and to confirm the annual credit release. The review of the annual monitoring report followed procedures outlined in Section 332.8(o)(9) of the Mitigation Rule. The comments listed below were provided by the NCIRT during this process. While it is not necessary to provide a response to specific comments at this time, please be sure to address the issues raised in future monitoring report submittals. Maria Polizzi, NCDWR 1. In video 2, at approximately 1:20 you can see a white truck with a trailer and a short gravel drive or construction entrance. Is that gravel entrance outside of the easement? It is difficult to tell from the video. If not, please make sure this is removed and vehicles are not parked within the easement. 2. Please confirm that extra stakes have been removed since veg plot photos were taken. 3. Please be sure to include discussion of any supplemental seeding in next year's monitoring report. It appears that some areas (especially in P2 cuts) that may need some touch up to provide additional stabilization and prevent rilling. But it is still a bit early to tell based on video from February, so just keep an eye on it. 4. Are there photo points for the ford crossing? If not, can these be included? Is there a gate on both sides? Only one can be seen in the video. David McHenry, WRC 1. Aggradation/split apparent in meander repair on FF1A near station 8+50. 2. Rock toe right bank somewhere near powerline crossing may be seeing erosion in behind (FF1D). 3. Head cut may be forming near top of FF4A (maybe sta. 1+10) above that long stretch where the left bank was not disturbed. 4. I did notice in the report that the DOT culvert pictures on DD4are both inlet perspectives. I believe they probably intended an outlet photo instead of a duplicate of the inlet(?). This culvert has a backwatered outlet, which is good, and hopefully stays that way, though from drone footage you can see a split channel forming (retained?) at tail of the pool. Emily Dunnigan, USACE 1. CCPV a. Add walnut thinning area. b. Add constructed vernal pool. c. With so many easement breaks it would be helpful to have all the crossing types called out (ford, culvert, etc) and utilities shown on the map. 2. Add photo points to all crossings and include on the CCPV. 3. Please QA/QC cross section graphs. Some are missing LTOB line and some titles have the wrong stream label. 4. FF1-B was proposed for Enhancement III activities with no channel work, but the CCPV shows the channel with a typical restoration sinuosity. On the record drawing cover page, the channel appears to be in the existing condition with no change. I would have expected this channel to look similar to the other EIII channels on the CCPV. Please update the CCPV to only include the accurate channel. The FF1-B label on the CCPV is also confusing and indicates the channel starts within EII credit. 5. Lower FF1-B, FF1-C, the middle of FF5-A, and upper FF3 are not included in the plan sheets. Why? Though minimal stream work was completed, these reaches are part of the project and should be included. Based on our review of the monitoring report and the results of the NCIRT review, we confirm that you have satisfied requirements included in the approved banking instrument and mitigation plan for this site. Accordingly, with this correspondence we confirm the release of credits as shown on the table below and on the attached credit release schedule. The district ledger on the Regulatory In-lieu Fee and Bank Information Tracking System (RIBITS) has also been updated to reflect this transaction. Release Activity MY0/As-built Date of Release 7/16/2024 Credit Classification Stream Credits Wetland Credits Warm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal Current Credit Release Request 494.355 - - - - - - Approved Credit Release 494.355 - - - - - - Credits Not Released (if any) - - - - - - - Total Credits Released to Date 1,045.01 - - - - - - Additionally, per the request included in your monitoring report submittal, we confirm that you may reduce the bond (#612402480) in the amount of $153,095.00. Please ensure appropriate level of financial assurances is maintained in accordance with the schedule approved in the Final Mitigation Plan. Thank you for your interest in restoring and protecting waters of the United States. Please note that this electronic copy is an official Department of Army notification regarding this transaction. If you have questions regarding this email, please contact me by email at Emily.E.Dunnigan@usace.army.mil <mailto:Emily.E.Dunnigan@usace.army.mil> or telephone (919) 750-7397. Emily Dunnigan Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District emily.e.dunnigan@usace.army.mil <mailto:emily.e.dunnigan@usace.army.mil> (919) 750-7397 Enclosure cc (by email): NCIRT Distribution List 紀ṙ⩸ᱻ条幼蟐ᑜ亠麕ι�谎礮¸Āꂐﳉ3ЀぇɅ!ⷪᆪ让獠䘇㢈ꗣઈ錠᪸뺺넁컙곘 䖬狼ะ✳♥クꋟffi廄鉼⶛꛼꼊￯甀ᨀ$큉ᵔ꽀ꃶ뿃�柄丯䀣顨ᝫ⹀觜}ĀꂐﳉЀうɄ嘠聙뵠媶晝緞㻒Ď䇼㪭誳藅ᇚೠ炙ɀ儠ᙪ詑蔂껲퓬ԍ핿ꌻ灎硍མ뼄瘠ឈュا⬉ĆĄ㞂ਕᨄᠰਰࠆثԁ܅ȃਰࠆثԁ܅ă㰰आثЁ舁ᔷЇ〯ح⬥ĆĄ㞂ࠕ붇ᯗ䛫膂⺝킎蜌�崝蒂槥㺧Ăɤ☁脰ڴ⬈ĆԅćЁꞁ脰イٳ⬈Ćԅ〇蘂桧瑴㩰⼯睷⹷業牣獯景⹴潣⽭ 歰潩獰振牥獴䴯捩潲潳瑦㈥䄰畺敲㈥到䅓㈥吰卌㈥䤰獳極杮㈥䌰╁〲㠰㈥ⴰ㈥砰楳湧挮瑲ⴰࠆثԁ܅İↆ瑨灴⼺漯敮捯灳洮捩潲潳瑦挮浯漯獣ば؝唃ฝᘄᐄ줹灆䙱데▷淮莄龝ะ̆ᵕď!Єȃꀅ舰嘁̆ᵕБƂきƂ艉漗捤漮晦捩慥灰⹳楬敶挮浯ᖂ⸪景楦散灡獰氮癩⹥潣艭⨛漮捤浳漮晦捩慥灰⹳楬敶挮浯ᦂ摯獣⹭景楦散灡獰氮癩⹥潣艭⨙漮捤漮晦捩慥灰⹳楬敶挮浯ᢂ楤捳癯牥⹹灡⹩景楦散渮瑥᪂摯ⵣ晤漮晦捩慥灰⹳楬敶挮浯ᲂ⸪摯ⵣ晤漮晦捩慥灰⹳楬 敶挮浯᪂摯ⵣ略漮晦捩慥灰⹳楬敶挮浯ຂ牨⹤景楦散挮浯ႂ⸪牨⹤景楦散挮浯គ牨⹤癳⹣汣畯⹤業牣獯景艴⨙栮摲献捶挮潬摵洮捩潲潳瑦ర̆ᵕē!Ȅ0樰̆ᵕПっちꁟꁝ虛桙瑴㩰⼯睷⹷業牣獯景⹴潣⽭歰潩獰振汲䴯捩潲潳瑦㈥䄰畺敲㈥到䅓㈥吰卌㈥䤰獳極杮㈥䌰╁〲㠰挮汲昰̆ᵕРたそّ⬌ĆĄ㞂荌Ž、ぁؿ⬈Ćԅȇᘁ栳瑴㩰⼯睷⹷業牣獯景⹴潣⽭歰潩獰䐯捯⽳敒潰楳潴祲栮浴࠰؆腧ČȂἰ̆ᵕУ〘耖⽾肽䪣炲髟�쫭聡〇؝唃┝ᘄᐰࠆثԁ܅ ȃࠆثԁ܅ăരआ蘪虈෷āԌ̀ʂ굙蚑朤꟒⠶좜꼪뛈遤ﴻ캢�甝≪쉒ϴ╝뚪ųꂐἱ뭩�頻ᖊ憾ᑉ凭䌺廢㊺�ꔷᗾ观亳㺀灉鮷ങ逰ꣁ㵆⩄훨寥怺숦㳐ケ퉆ꨓ鰜봑圾襼姎�癩诣殏⣂擂뺬맟飔㫅⽪꾭ଙ౺쿐砅滜硯긠㍺࣭醈牡볆艭㨯겡纄ᬂᓅ騷諻錄鹇浕戛઀ⶌ彦䌃ٌ뽊⻌곆箳ඡ摼펵럜쾿保酁5⑆곙쟏幋풴놺﮴숕⑊ᱨ㾢荹韵㙛ಜ䞫絻ဪ赈ᾕᦘʲٵ�埄앬¾㻻Ꟑ矣煴ꗓ赔㵒ᝠ�䙩㬐掵䶅Ỉ冨绣㩉鏜䜢ꚝ恸쭗돊ﵯꃤ漪킍 삹ㄩ鎪웧眭칐贃싁薂摝몜ᦂ垑�㽓⡼彯啾鯦쀀详૯ꧯ큞箤꟭坼Ϳ䛅宫㺎딓䫝赵⚉囯뫿⏆ꖧ䑦錪�ⶵ祥⁃⺻໊缎洩௧紖唄Ӣ嵘ឞ䤸㺦嘔Ҵ఼곾覴�疽釶兄㐢衃ְ