Loading...
HomeMy WebLinkAboutNCC242118_ESC Approval Submitted_20240716 Matt Johnson From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov> Sent: Friday, April 26, 2024 11:05 AM To: Campbell Holdings LLC.; Matt Johnson Subject: NC DEMLR - FROF Application Approval with Modifications Needed CRM:0197075 Attachments: ALAMA-2024-0116 Cambro Building 2.pdf; FRO Application Report - 04-22-2024 16_31 _23.docx .% MAY 2q/7js fro 0, , 4;• i op 110 �11+V��jr 1 O 7 -re �''-1=2. 1776 *- 'S,Te- `A./AM Vld �- North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Roy Cooper Governor Elizabeth S. Biser Secretary William Vinson Jr. (Acting) Director 04-26-2024 Campbell Holdings LLC. PO Box 2000 Huntington Beach, CA 92647 RE: Project Name: Cambro Building 2 Acres Approved:21.45 Application ID: PA-004587 Permit Number: ALAMA-2024-0116 1 Address: NC Hwy 119 City: Mebane County:Ala mance River Basin:Cape Fear Stream Classification: NSW: Nutrient Sensitive Waters;WS-V:Water Supply V Plan Type: Revised Plan Dear Campbell Holdings LLC., This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed below. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit.After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email.As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOl form may be accessed atdeq.nc.gov/NCG01. Please direct questions about the eNOl form totheStormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan, not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this 2 project. Modifications Required for Approval: 1. Please provide one revised full set of plans to our office showing the following: a. Diversion 3B should be placed above the sediment basin or the sediment basin should be reconfigured so that sediment-laden water enters the sediment basin at the end opposite the outlet to allow for flow through three baffles. b.All ESC measures should be placed out of the Zone 1 Jordan Lake buffer. c. Please clarify the callout, "Maintain positive flow to skimmer basin 2" located in the middle of sheet EC102. d. Diversion 7B does not appear to outlet to an ESC measure, please revise or clarify flow path. e. Please include the entire construction sequence on the plans for clarity to the contractor. 2. Temporary slope drains should be provided where temporary diversions discharge into sediment basins or traps with a slope height greater than seven feet. [G.S. 113A-57(3)] 3. Access to construction entrance and to stockpile requires crossing diversion berms, please clarify the access paths on the plans, such that the temporary diversions and stormwater pipe installation are not disrupted by construction traffic. General Comments: 1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application. 2. Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800 and asking to speak with the Land Quality inspector for your county. Permission must be obtained and granted from NC DEQ DEMLR prior to the removal of any ESC measures. Please also include the pre-construction conference in the construction sequence in phase 1. [GS 113A-51, 15A NCAC 4B .0120] 3.Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110] 4.Additional measures may be required -The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 5.The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly NCG01 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate NCG01 coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment] 3 Your cooperation is appreciated. Sincerely, Ashley Vikara, El - Assistant Regional Engineer Winston-Salem Regional Office- 336-776-9800 North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Enclosures: Certificate of Approval Application Report North Carolina Department of Environmental Quality I Division of Energy, 1., Mineral and Land Resources I .„) Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 Winston-Salem NC, 27105 336-776-9800 Department of Environmental Oualih Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 4