HomeMy WebLinkAboutNCC232341_MODIFICATION Supporting Documents_20240711 From: SVC DONotReply-DEOPermits
To: Neil R Uldrick
Cc: Moffitt.Jason A
Subject: NC DEMLR-FROF Application Approval CRM:0104289
Date: Thursday,July 11,2024 3:24:45 PM
Attachments: Application Report-Thursday.July 11.2024 322 Modf
GUILF-2025-0119 Edinborouah East Lots Phases 3-6.pdf
[External]
North Carolina Department of Environmental Quality
Division of Energy, Mineral&Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S.Biser
Secretary
William Vinson Jr.(Acting)
Director
07-11-2024
LETTER OF APPROVAL
DR Horton,Inc.
4150 Mendenhall Oaks Parkway
High Point,NC 27265
R
E Project Name:Edinborough East Lots-Phases 3-6
Acres Approved:20.78
Application ID:PA-005873
Permit Number:GUILF-2025-0119
Address:INC HWY 61 North
City:Gibsonville
County:Guilford
River Basin:Cape Fear
Stream Classification:NSW:Nutrient Sensitive
Waters;WS-V:Water Supply V
Plan Type:New Plan(Express)
Dear DR Horton,Inc.,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of
Approval. The Certificate of Approval must be posted at thejob site. This plan approval shall expire three(3)years following the date of
approval,if no land-disturbing activity has been undertaken,as is required by Title 15A NCAC 4B.0129.
As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)form requesting a
Certificate of Coverage(COC)under the NCGO10000 Construction Stormwater General Permit. After the form is reviewed and found to be
complete,you will receive a link with payment instructions for the$120 annual permit fee. After the fee is processed,you will receive the COC
via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to
commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI
form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new
responsible party must obtain a new COC.
Title 15A NCAC 4B.0118(a)and the NCG01 permit require that the following documentation be kept on file at the job site:
1.The approved E&SC plan as well as any approved deviation.
2.The NCG01 permit and the COC,once it is received.
3.Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by G.S.113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining
properties. If,following the commencement of this project,the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973(North Carolina General Statute 113A-51 through 66),this office may require revisions to the
plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations,and rules.In
addition,local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form,
which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition,it
would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
General Comments:
1.Please print this email as your Letter of Approval for your NCGO10000 Certificate of Coverage application.
2.Please notify this office prior to your pre-construction conference for this project by calling(336)776-9800 and asking to speak with the Land
Quality inspector for your county.Permission must be obtained and granted from NC DEQ DEMLR prior to the removal of any ESC
measures.All additional permits should be obtained,as necessary,prior to beginning construction.[GS 113A-51,15A NCAC 4B.0120]
3.Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan,a site regulated under
the Mining Act of 1971,or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated
by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste
Management or Division of Water Resources rules and regulations.[15A NCAC 4B.0110]
4.Additional measures may be required-The applicant is responsible for the control of sediment on-site. If the approved erosion and
sedimentation control measures prove insufficient,the applicant must take those additional steps necessary to stop sediment from leaving this
site. [15A NCAC 4B.0115]
5.The NCG01 has a$120 yearly fee and our office often receives closure inspection requests days prior to yearly NCG01 fee payment due dates.
Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination(NOT)to terminate NCG01
coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been
removed. The removal of temporary ESC measures,including basins,requires prior approval.Often,a full growing season is necessary between
initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a
closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment]
Your cooperation is appreciated.
Sincerely,
Nicole Chiles,PE-Assistant Regional Engineer
North Carolina Department of Environmental Quality
Division of Energy,Mineral&Land Resources
Land Quality Section
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Winston-Salem Regional Office 1 450 West Hanes Mill Road,Suite 300 1 Winston-Salem NC,27105
336-776-9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.
CAUTION:This email originated from outside of the organization.Do not click links or open attachments unless
you recognize the sender and know the content is safe.
CERTIFICATE OF PLAN APPROVAL
TATE
mlei
ti n
QUAM V�
The posting of this certificate certifies that an erosion and sedimentation control plan has been
approved for this project by the North Carolina Department of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Chapter 413.0107 (c). This certificate must be posted
at the primary entrance of the job site before construction begins and until establishment of
permanent groundcover as required by North Carolina Administrative Code, Title 15A,
Chapter 413.0127 (b).
Edinborough East Lots - Phases 3-6
NC HWY 61 North Gibsonville, NC 27249
7/11/2024 GUILF-2025-0119
Date of Plan Approval Project Identifier
Certificate of Coverage Number: