Loading...
HomeMy WebLinkAboutWQ0045606_Application (FTSE)_20240712Nraa0 3 � State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-23) Entity Requesting Allocation: Brunswick County Project Name for which flow is being requested: Saunders Village off -site LPSS More than one FTSE may he required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: NORTHEAST BRUNSWICK WWTF b. WWTP Facility Permit #: WQ 0086819 All flows are in MGD c. WWTP facility's permitted flow 4.975 d. Estimated obligated flow not yet tributary to the WWTP 2.241 e. WWTP facility's actual avg. flow 2.128 f. Total flow for this specific request 0.00189 g. Total actual and obligated flows to the facility 4.37 h. Percent of permitted flow used 87.8% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Approx. Obligated, Total Pump Pump Average Current Not Yet Current Flow Station Station Firm Daily Flow** Avg. Daily Tributary Plus (Name or Permit Capacity, * (Firm / pf), Flow, Daily Flow, Obligated Available Number) No. MGD MGD MGD MGD Flow Capacity*** Commerc-_WQ0036073 3.168 1.2672 0.140 0.287 0.4269 0.8403 MOD * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): NORTHEAST BRUNSWICK WWTF Downstream Permit Number: WQ 0086819 Page 1 of 8 FTSE 10-23 III. Certification Statement: I William L. Pinnix, P.E., certify to the best of my knowledge that the addition of Director of Engineering Services the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Official Signature Title of Signing Official Page 2 of 8 FTSE 10-23