HomeMy WebLinkAboutSW6230805_Design Calculations_20240711 Stormwater Management Report June 21, 2024 Turnberry South - Phase 1 Royal Birkdale Drive Raeford, Hoke County, NC Prepared for: D&L Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 Prepared by: Bowman North Carolina, Ltd. cARo( '% 4006 Barrett Drive, Suite 104 = ; ° Ess,°y-�• • aSEAL • . Raleigh, NC 27609 05}57 (919) 553-6570 •4LI Firm#F-1445 : .( Q ,�'• Bowman TABLE OF CONTENTS OVERVIEW FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP WATER SURFACE CLASSIFICATIONS HUC NOAA POINT PRECIPITATION FREQUENCY ESTIMATES SHWT REPORT WATER QUANTITY-WET POND SCM 1 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES WET POND DESIGN SCM DETAILS SPILLWAY DESIGN PRE-DEVELOPMENT HYDROGRAPHS POST-DEVELOPMENT HYDROGRAPHS TIME OF CONCENTRATION RIP-RAP APRON DESIGN WATER QUANTITY-BIORETENTION POND SCM 2 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES BIORETENTION POND DESIGN SCM DETAILS SPILLWAY DESIGN PRE-DEVELOPMENT HYDROGRAPHS POST-DEVELOPMENT HYDROGRAPHS TIME OF CONCENTRATION RIP-RAP APRON DESIGN OVERVIEW This report contains the storm water management overview for the residential project Turnberry South Phase 1 on Royal Birkdale Drive in Raeford, Hoke County. The project site is currently undeveloped, wooded area. The proposed site consists of 18.92 acres. The proposed site is located in Flood Zone `X' as shown on FEMA FIRM Panel 3710945500j with an effective date of 10/17/06. Flood zones are subject to change by FEMA. There are no surface waters on the property, but there are wetland features. The County Soils Survey indicates that Norfolk loamy sand, Wagram loamy sand, Goldsboro loamy sand, and Blaney loamy sand soils are present on the site. There are two proposed storm water management facilities (one wet pond and one bioretention pond) outlined in this report and they have been designed for post-development peak attenuation to treat the impervious areas of the development. The Wet Pond SCM 1 is designed to capture a drainage area of 9.27 ac with an impervious area of 4.78 ac. The Bioretention Pond SCM 2 is designed to capture a drainage area of 14.15 ac with an impervious area of 6.12 ac. The balance of the site is open and thinly wooded space and will by-pass the proposed SCMs. The SCMs are designed to treat a 1.0" storm event. VARIANCE Wet Pond MDC 6 requires that the main pool be equipped with a vegetative shelf around it's perimeter. No vegetated shelf is provided along the perimeter of the retaining wall. However, the retaining wall includes a fence that will deter any humans from getting into the pond. Therefore, the fence on the retaining wall meets the requirements for MDC 6. Impervious Area Summary-Wet Pond SCM 1 Roadway 71,013 sf 1.63 ac Sidewalk 1 7,1 59 sf 0.39 ac Lots (30 lots @ 4,000 sf/lot) 120,000 sf 2.76 ac Total IA to Pond 208,172 sf 4.78 ac Impervious Area Summary- BioRetention Pond SCM 2 Roadway 19,068 sf 0.44 ac Sidewalk 5,533 sf 0.12 ac Lots (24 lots @ 4,000 sf/lot) 96,000 sf 2.20 ac Future Roadway 44,532 sf 1.02 ac Future Sidewalk 13,316 sf 0.31 ac Future Lots (22 lots @ 4,000 sf/lot) 88,000 sf 2.02 ac Total IA to Pond 266,449 sf 6.12 ac Impervious Area Summary-Total Roadway 90,081 sf 2.07 ac Sidewalk 22,692 sf 0.52 ac Lots (24 lots @ 4,000 sf/lot) 216,000 sf 4.96 ac Future Roadway 44,532 sf 1.02 ac Future Sidewalk 13,316 sf 0.31 ac Future Lots (22 lots @ 4,000 sf/lot) 88,000 sf 2.02 ac Total IA to Pond 474,621 sf 10.90 ac FIGURES Hydrologic Soil Group—Hoke County, North Carolinato o v 667200 667500 667800 668100 668400 668700 66910 35°0'41"N 2 �. 1 35°0'41"N 0 9 ' i / , ' . - 0 rb-____. --„ . . ,. . .. , - . , , tit 1 M C- 4 _„,* --. 4.... '' A\ \\ .AO BaD ---_ 1 t ji ' � i fir\ °." 'i,' y,\ WaB �'�n t\ r- ./ NoB "WaB ': a "_,.---- 1 #°* • ' NoB BaD•, =4 filii‘----- : BaD tVED JT . • GoA '` JT `yi ,,, , `1.. ` .. h., L 4 - . 'WaB BaD S VI- { I WED _ — - , \ 'V. 10 �CCIIo 0 BaB f= g kw A \ - t f BaD Bab,.r �• ,- T BaD ` ,.,, •, , 'r 8 .. •' :‘,W 140. .'.(11144 •, ...; .;A: a.: -,,,, ,. ,,, _. ,,,, 1.. irk. i .+ - ;" �3 i :� 34°59'8"N • ,., t-f'`7[-r._ 3 _..�.,.�° f. i 34°59'8„N 667200 667500 667800 668100 668400 668700 669000 669300 3 3 to a Map Scale:1:14,000 if printed on A portrait(8.5"x 11")sheet v N Meters it 0 200 400 800 1200 Feet 0 500 1000 2000 3000 Map projection:Web Mercator Corner coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 5/31/2023 di id Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Hoke County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. O C/D Soils Please rely on the bar scale on each map sheet for map Soil Rating Polygons • D measurements. 0 A p Not rated or not available Source of Map: Natural Resources Conservation Service n A/D Water Features Web Soil Survey URL: Streams and Canals Coordinate System: Web Mercator(EPSG:3857) B Maps from the Web Soil Survey are based on the Web Mercator Transportation 0 B/D projection,which preserves direction and shape but distorts Rails distance and area.A projection that preserves area,such as the n •.i Interstate Highways Albers equal-area conic projection,should be used if more accurate calculations of distance or area are required.C/D US Routes This product is generated from the USDA-NRCS certified data as 0 D Major Roads of the version date(s)listed below. n Not rated or not available Local Roads Soil Survey Area: Hoke County, North Carolina Soil Rating Lines Background Survey Area Data: Version 20,Sep 8,2022 A 1111 Aerial Photography Soil map units are labeled(as space allows)for map scales • A/D 1:50,000 or larger. .v B Date(s)aerial images were photographed: Apr 17,2022—May 20,2022 •y B/D The orthophoto or other base map on which the soil lines were • • C compiled and digitized probably differs from the background • • C/D imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. • • D • • Not rated or not available Soil Rating Points O A O ND ▪ B • B/D USDA Natural Resources Web Soil Survey 5/31/2023 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Hoke County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Blaney loamy sand,2 to C 44.6 5.8% 8 percent slopes BaD Blaney loamy sand,8 to C 156.1 20.3% 15 percent slopes CaB Candor sand, 1 to 8 A 6.5 0.8% percent slopes GoA Goldsboro loamy sand, B 21.5 2.8% 0 to 2 percent slopes, Southern Coastal Plain JT Johnston loam A/D 70.0 9.1% Ly Lynchburg sandy loam, B/D 3.6 0.5% 0 to 2 percent slopes Mc McColl loam D 6.2 0.8% NoB Norfolk loamy sand,2 to A 135.5 17.6% 6 percent slopes W Water 0.2 0.0% WaB Wagram loamy sand,0 A 324.6 42.2% to 6 percent slopes Totals for Area of Interest 768.6 100.0% USDA Natural Resources Web Soil Survey 5/31/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Hoke County,North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 5/31/2023 Conservation Service National Cooperative Soil Survey Page 4 of 4 r p11114 .._, . 1 -.?), r i 1--- • i 1111 .. ti Vii.- .5 lk. ' ►&1 • Aso .,A I�] _ 4 �� a / S�� Ng. AMERICANA DR J ����N L A� i . ��44 ' ) 1 ,f_j , 1--- '' . _ 1\ 40 I, i- ill)p1ii`11.- I , c\- � ds __ - JOHNSON iMILL�RD/ o ;81P t- - ir . _ 4 41.1 'Fs : 49 All* ...(1.00-\' ,.. \* ir r ° t tih Ik . T_* c rn gUC(EYE.DR �ti • . NIIL • "ft;\. a- 4 • Bus z c � ."_ 64*' MAE ip 401 cl;'3 1' '4- ,...., lie III I PROJECT SITE National Flood Hazard Layer FlRMette . FEMA Legend 79°10'2"W 35°0'43"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT I vw•- v , ; Without Base Flood Elevation(BFE) 2063421 FEET ♦ Ali • iligR ZoneA.V A99 SPECIAL FLOOD With BFE or Depth Zone AE.AO.AH.VE.AR 206 FEET — HAZARD AREAS Regulatory Floodway e 0.2%Annual Chance Flood Hazard.Areas of 1%annual chance flood with average yr l r depth less than one foot or with drainage areas of less than one square mile ' 41.114 • i Future Conditions 1%Annual ♦•.• . f nib - Chance Flood Hazard zone.e itio • �.• �• "4" • dr % A Area with Reduced Flood Risk due to • �"' 205 FEET _ • •• I Levee.See Notes. a0 _ OTHER AREAS OF -+.' FLOOD HAZARD '/J Area with Flood Risk due to Levee ec y..� , • NO SCREEN Area of Minimal Flood Hazard \ f'^ , Pt'r Effective LOMRs (� 14 zip c t OTHER AREAS Area of Undetermined Flood Hazard 4 • �� C _+'Alt �' A1240:ati46%6 9•%.*144, GENERAL — - Channel.Culvert.or Storm Sewer ��3 Q9 f �' 1 , , C r STRUCTURES milli Levee,Dike,or Floodwall (�` \ -1 ` •• T Z • • O 20.2 Cross Sections with 1%Annual Chance ir • AREA OF MINIMA__F,LOOD HAZA ��5 Water Surface Elevation EE €OUNT �� zon X111 "' Coastal Transect PI ` 440 � . . 4 _ i � M Base Flood Elevation Line(BFE) - '370397 w • <p` ' Limit of Study Zone AE , JP •. Jurisdiction Boundary 4 - .. � f # " A --— --— Coastal Transect Baseline • TS'J1i • 3710�' {,t� a y• OTHER - Profile Baseline A ) 4, FEATURES Hydrographic Feature • ''� .. eff. 10/17/2006 �•t r 1Digital Data AvailableN 200 FEETIdie %i _ • ZILI,10:41 . ' t4 ....,0 • S No Digital Data Available + y ' `� • MAP PANELS Unmapped 0 1„p�E /'r �� ficiii- ,-,•A The pin displayed on the map is an approximate P .,,,,, � ' •. point selected by the user and does not represent jei -� ,. �� an authoritative property location. • t 1 ,� ' ` t This map complies with FEMA's standards for the use of . ,, 4t,4, ��� A40 • •S ,� digital flood maps if it is not void as described below. r rIM. v,thqi _ - 1a = �� • The basemap shown complies with FEMA's basemap • • ,9 � ' �` ` • ` •S accuracy standards do t .� 19� 1 ��1 la) M' • w 41°• The flood hazard information is derived directly from the I. ‘ ,, 1�� . .,.,, , authoritative NFHL web services provided by FEMA.This map 1 41s • ,0 was exported on 5/23/2023 at 2:27 PM and does not c_ reflect changes or amendments subsequent to this date and .." . tot" CI 411 - ', ,44 % 4 •i • time.The NFHL and effective information may change or K f - I ,••• ' become superseded by new data over time. • (A. e 1°�g5 9 FE . This map image is void if the one or more of the following map . ;, , _ , �,t 1 elements do not appear: basemap imagery.flood zone labels. • • ♦ '" `La legend,scale bar, map creation date.community identifiers, . - - — FIRM panel number.and FIRM effective date. Map images for Feet 79°9'25'W 35°0'13"N unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 1 :6'00� regulatory purposes. Basemap: USGS National Map: Orthoimagery: Data refreshed October. 2020 rDQom. NC Surface Water Classifications NC Classifications Website Report an Issue a A Amn�knrv� , *c Search X Q Stream Dote Is C _ege^d X Layers X • t P., o Surface Water Classifications: v ED X o, 4944 Fayetteville Rd. X oo ) 00 00 r7i Stream Index: 18.31-19-5 - - v Stream Name: Beaver Creek Surface Water Classifications: Description: From sourcem Puppy Creek - c�F Gtw1'a'-',,, e Stream Index: 18-31-19-5 Classification: c U' v Date of Class.: June30,1973 e JoIen nM" Stream Name: Beaver Creek What does this Class.mean? veo, Description: From source to Puppy Creek e`x',,,,veno g J River Basin: Cape Fear Classification: C CI,zoom to Date of Class.: June 30,1973 y 1 :anon Heath Dr ., cG :wit—fe 4 'BdO o F What does this Class.mean? View River Basin: Cape Fear 159 0 > n e " n ch Dl Jockey Dr 3 °e 4} 'fay ette+110.12d a' v n �•� ' `- me" nfJr 259 ft o t1ao1,D1 J CC LaWre H,,,. ',ek° PROJECT SITE . d apt Uo0w1n $�a N°+ -79.191 34.998 Degrees 0 v q '�M�ooe i_, _ _ _ _,yr°r 259 are�9y1 4 rq Or Club Fo,9c In r, \ _� �encana Or \ o •..l .. �� II\ il'ald en Green Of - �% .,,\ log _ mac"C3cz-,---- PROJECT SITE / y :40, Li //,‘ _ —.11/4 -\\\ --. ' - ' 1 4111 (iorz) • IP x — i si (t4`IP..— •-• -Digit HUC(Subwatershed) • i 12•igit Name: Lower Puppy Creek .1� 12-Di .Code. 030300040606 1.\� _ '• \\\ 10.D1g1 Name: Rockfish Creek f• I\• . 1 -- 10.Digit Code: 0303000406 _ ' • ;7 1111 a 8-Digit Code: 03030004 t ') River Basin: Cape Fear 1+1 1.11 • r O '$� ep 12-Digit Area(ac): 31.636.32 1 >/ $r � r nJ \, Zoom to / I� L^ o i : Cent`Qe6e s ' • — - 0t,; R ? • 0. o m+f 1171 Pprhsst I =(II hr� a o` r ,o` Co( I0'sd.C;I \.1 5/23/23,2:21 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 Location name: Raeford, North Carolina, USA* °�✓ '°° V lt. Latitude: 35.0076°,Longitude:-79.1669° V nunElevation:247 ft**1`� *source:ESRI Maps**source:USGS ""`" `' POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 0.436 0.514 0.600 0.664 0.741 0.797 0.850 0.899 I 0.961 1.01 (0.396-0.482) (0.468-0.569) (0.545-0.664) (0.602-0.733) (0.669-0.816) (0.717-0.876) (0.761-0.933) (0.801-0.987) (0.848-1.06) (0.884-1.11) 10-min 0.696 0.823 0.960 1.06 1.18 1.27 1.35 1.42 1.52 I 1.59 (0.633-0.770) (0.749-0.911) (0.873-1.06) (0.963-1.17) (1.07-1.30) (1.14-1.40) (1.21-1.48) (1.27-1.56) l (1.34-1.67) (1.39-1.74) 15-min 0.870 1.03 1.22 1.34 1.50 1.61 1.71 1.80 1.91 1.99 (0.791-0.963) (0.941-1.14) (1.10-1.34) (1.22-1.48) (1.35-1.65) (1.45-1.77) (1.53-1.88) (1.60-1.98) (1.69-2.10) (1.75-2.19) 30-min 1.19 1.43 1.73 1.95 2.22 I 2.42 2.61 2.80 3.04 3.23 (1.08-1.32) (1.30-1.58) (1.57-1.91) (1.76-2.15) (2.00-2.44) (2.18-2.66) (2.34-2.87) (2.49-3.07) (2.69-3.34) (2.83-3.55) 60-min 1.49 1.79 2.21 2.54 2.95 3.28 3.60 3.93 4.37 4.71 (1.35-1.65) (1.63-1.98) (2.01-2.45) (2.30-2.80) (2.66-3.25) (2.95-3.60) (3.22-3.96) (3.50-4.31) (3.86-4.80) (4.13-5.18) 2-hr 1.73 I 2.10 2.64 3.06 3.61 4.06 4.50 4.96 5.59 6.08 (1.56-1.95) (1.90-2.36) (2.38-2.96) (2.74-3.42) (3.23-4.04) (3.61-4.54) (3.98-5.04) (4.36-5.54) (4.86-6.23)I (5.25-6.79) 3-hr 1.84 2.22 2.81 3.27 3.92 4.44 4.99 5.57 I 6.38 7.03 (1.66-2.07) (2.00-2.50) (2.53-3.16) (2.94-3.68) (3.49-4.39) (3.94-4.98) (4.39-5.58) (4.86-6.22) (5.50-7.12) (6.00-7.85) 6-hr 2.19 2.65 3.35 3.91 4.70 5.35 6.03 6.74 7.76 I 8.59 (1.98-2.44) (2.40-2.96) (3.03-3.72) (3.53-4.35) (4.20-5.21) (4.75-5.91) (5.31-6.66) (5.89-7.43) (6.69-8.55) (7.32-9.45) 12-hr 2.58 3.13 3.97 4.66 5.64 6.45 7.31 8.24 9.57 10.7 (2.33-2.88) (2.83-3.49) (3.58-4.42) (4.19-5.19) (5.02-6.25) (5.70-7.13) (6.40-8.07) (7.14-9.09) I (8.17-10.6) (8.99-11.7) 24-hr 3.04 3.68 4.66 5.44 6.52 7.39 8.28 9.21 I 10.5 11.5 (2.82-3.28)i (3.41-3.98) (4.32-5.04) (5.03-5.88) (6.00-7.04) (6.78-7.97) (7.58-8.93) (8.40-9.93) (9.52-11.3) (10.4-12.4) 2-day 3.53 I 4.26 5.35 6.22 7.42 8.38 9.38 10.4 11.8 12.9 (3.29-3.79) (3.97-4.58) (4.98-5.76) (5.77-6.69) (6.86-7.97) (7.72-9.00) (8.61-10.1) (9.51-11.2) (10.7-12.7) (11.7-13.9) 3-day 3.75 4.51 5.64 6.54 7.78 8.76 9.78 10.8 12.3 13.4 (3.50-4.02) (4.22-4.84) (5.26-6.04) (6.09-7.00) (7.21-8.32) (8.10-9.37) (9.01-10.5) (9.94-11.6) (11.2-13.2)I (12.2-14.4) 4-day 3.97 4.77 5.93 6.86 8.13 9.14 10.2 11.3 12.7 I 13.9 (3.72-4.24) (4.47-5.10) (5.55-6.33) (6.40-7.31) (7.56-8.66) (8.47-9.74) (9.41-10.9) (10.4-12.0) (11.7-13.6) (12.7-14.9) 7-day 4.61 5.52 6.78 - 7.78 9.14 10.2 11.4 12.5 14.1 15.4 (4.31-4.93) (5.16-5.89) (6.33-7.25) (7.25-8.31) (8.50-9.77) (9.50-10.9) (10.5-12.2) 1 (11.5-13.4) (12.9-15.1) (14.0-16.5) 10-day 5.28 6.30 7.62 8.65 10.0 11.1 I 12.3 13.4 14.9 16.1 (4.97-5.61) I (5.93-6.70) (7.16-8.09) (8.12-9.18) (9.40-10.7) (10.4-11.8) (11.4-13.0) (12.4-14.2) I (13.8-15.9) (14.8-17.2) 20-day 7.12 I 8.43 10.0 11.3 13.0 14.3 15.6 17.0 18.8 20.3 (6.72-7.56) 1 (7.96-8.95) (9.46-10.6) (10.6-12.0) (12.2-13.8) i (13.4-15.2) i (14.6-16.6) 1 (15.8-18.1) (17.5-20.0)I (18.7-21.6) 30-day 8.85 10.4 12.2 13.6 15.4 16.8 18.1 19.5 21.4 22.8 (8.38-9.37) (9.88-11.0) (11.5-12.9) (12.8-14.4) (14.5-16.3) (15.8-17.8) (17.0-19.2) (18.3-20.7) (19.9-22.7) (21.1-24.2) 45-day 11.2 13.1 15.1 16.6 18.6 20.1 I 21.5 23.0 24.9 26.3 (10.6-11.8) (12.5-13.9) (14.3-16.0) (15.7-17.6) (17.6-19.6) (19.0-21.2) (20.3-22.8) (21.6-24.3) (23.3-26.3) (24.6-27.9) 60-day 13.4 15.7 17.9 19.6 21.7 23.3 24.9 26.4 28.4 29.9 (12.7-14.1) (14.9-16.5) (17.0-18.8) (18.6-20.6) (20.6-22.8) (22.1-24.5) i (23.5-26.2) 1 (24.9-27.8) (26.7-30.0) (28.0-31.6) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0076&Ion=-79.1669&data=depth&units=english&series=pds 1/4 5/23/23,2:21 PM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.0076°, Longitude: -79.1669° 30 - --==—, —Average recurrence interva2 l 1 (years) 25 - c / — 1 a 20 - 5 a) -o — 10 0 15 - �� — 25 y — 50 •O. 10 - — 100 1. 200 m �� a 5 — /' �'C1/iii1111 500 0- 1 I I - I I I I I —__ C_ C C C C ' " '- im >. >.>. >. T >. >. 9.>. E ro E E E N A kb N v v v-o v 7 7 7 7-9 `^ o U1 m 6 Duration N N "I ^ o R R v$ 30 - - 25 - �- Duration 20 - - O. — 5-min — 2-day v 0 15 _ — 10 ruin — 3-day r iiiiIIIIIIIIIII15-min — 4-day '= — 30-min — 7-day v10 - _� — 60-min — 10-day a` g — 2-hr — 20-day 5 — 3-hr — 30-day — 6-hr — 45-day__ — 12-hr — 60-day — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Tue May 23 18:21:33 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0076&Ion=-79.1669&data=depth&units=english&series=pds 2/4 5/23/23,2:21 PM Precipitation Frequency Data Server FORT BRASS MILITARY RESERVATION 41'K AJRPARK Raeford — 3km I 2mi Large scale terrain Winston-Sal em • • •Durham Rocky Mount Greensboro • Raleigh NORTH CAROLINA Green •Charlotte FayettJille. Jacksol • T H CAROLIA N A Wilmington la 100km • Y C 60mi Large scale map Winston-Salem Greensboro ' 0 Darham Rocky Mount Raleigh North Greenvi Carolina • arlotte I Fayetteville Io ackson Wilmini 100km r CCI % IMI 60mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?Iat=35.0076&Ion=-79.1669&data=depth&units=english&series=pds 3/4 5/23/23,2:21 PM Precipitation Frequency Data Server Winston-Salem Greensboro Durham . Rocky Mount • Raleigh • Green North • Carolina Charlotte —�� Fayetteville • Jackson Wilmin 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questionsnoaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.0076&Ion=-79.1669&data=depth&units=english&series=pds 4/4 Scott Cole,NCLSS 312 Copples Road Ext Asheboro,NC 27205 (336) 460-4554 D&L Engineering,PLLC March 28,2023 Attn: Mr. Lee Humphrey 150 S. Page Street Southern Pines,NC 28387 Re: Seasonal High-Water Table Identification and Soil Infiltration Rates: Turnberry, Hoke County NC parcel 494560301008 Soil conditions and infiltration rates were evaluated and measured on the above-referenced property within the proposed storm water BMP device. Work was conducted in accordance with Parts A-2 and C-1 of the North Carolina Department of Environmental Quality Stormwater Design Manual. Soil samples were evaluated with a hand auger. SEASONAL HIGH WATER TABLE IDENTIFICATION Seasonal High Water Table depth is determined by field evaluation for soil wetness conditions which are indicated by the presence of redoximorphic (redox) features with chroma colors of 2 or less (in Munsell color notation) in mottles or the horizon matrix, and at times, saturated soil conditions and/or free water within the soil profile. Colors of chroma 2 or less due to relic minerals from parent material (underlying rock), anaerobic activity created by placement of fill material, or soil textural class transitions (perched water) are not considered as indicators for seasonal high water. Upon determination of SHWT depth, an additional 6" will be deducted from the observed depth to account for capillary fringe water movement above the SHWT. Stormwater infiltration trenches are designed to ensure the lowest point is at least two feet above the Seasonal High Water Table(SHWT). SATURATED HYDRAULIC CONDUCTIVITY(Ksat) Soils evaluated on this property are typical of those within Blaney Loamy Sand Soil series. These soils are well drained to moderately well drained soils with varying rates of permeability. Infiltration rates are measured to determine if soil conditions are suitable for the installation of stormwater infiltration devices. Infiltration rates are measured using a Johnson Constant Head Permeameter. Measurements are recorded at varying intervals until equilibrium is reached. The SHWT and Infiltration rates for the stormwater BMP devices are reported in the table below. BMP Device Site#1 Test Location SHWT Munsell Color Ksat#1 Ksat#2 (feet below Notation ground surface) Not observed 0-5' 7-15' Elevation 232' within 15'of N/A Sandy Clay Sandy Clay surface Loam/Sandy Loam(sap) (Elevation 217') Clay Not 2.5"/hour Measured Scott Cole,NCLSS 312 Copples Road Ext Asheboro,NC 27205 (336) 460-4554 BMP Device Site#2 Test Location SHWT Munsell Color Ksat#1 Ksat#2 Ksat#3 (feet below Notation ground surface) Observed 0-2' 2-10' 10-13" Elevation 218' within 13'bgs 2.5Y 7/1 Sandy Clay Sandy Clay Clay (Elevation 205') Loam Loam/Sandy Expansive 5"/hour Clay Not 2.5"/hour Measured CONCLUSION Field evaluation of hydraulic conductivity provides estimations of soil infiltration rates;however,methods used to measure these rates can influence the results. Side walls of the bore hole are"smeared"by the soil auger as the hole is prepared and loose soil in the bottom of the hole is placed in suspension when water is applied; both factors negatively influence water infiltration rates. To help overcome these issues, after excavation of each infiltration trench, it is recommended the trench bottom and sidewalls be raked and dusted with pulverized limestone. These are practices that have been in place within the on-site wastewater industry to help loosen the soil and aid in restoration of soil structure. I am pleased to be of service in this matter and can be contacted at your convenience should you have any questions concerning information within this report. Thank you, n 5ait so Scott Cole 1":0 J► North Carolina Licensed Soil Scientist ""� �,�i' .al rr'';Aiy� et 0,14 Avg ct` 12g3 r iS" F "IQR-CY co N W .P O o O 'A al cNs A to N 0 BMP Site#1(Elevation 232') SHWT: Not Observed SHWT Elevation: NA Ksat 0-5'SCL/SC: 2.5"/hour Ksat 7-15'SCL(sap): Not Measured *10 II'Ps 111 aill Ili* IF 4 is sag is ■ •♦ ... ft ail* ali / a� N lia left i 2N2 9,q8 411 eit 494560301008 6111661 ON #100 o. Nod' N 27 *IA #A10 # ¢ sOIL ►i.�'vERs.NX(/a, ( � NN # 0 tire" VP0 10 N� NN N 7,4 0 / ## 0 \\ 114 �rve N NsAPIP'r n R BMP Site#2(Elevation 218') ` '� SHWT: 13'bgs SHWT Elevation: 205' Ksat 0-2'SCL: 5"/hour Ksat 2-10'SCLISC: 2.5"/hour Ksat 10-13'C(exp): Not Measured ilk \.13'heavy wetness/free water: SHWT WIP- • N•r. • ■ ■ NI c„, •• ... F__ 1 226 __ _1_ — nr_ n .C_ _i� 2a� SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION--- '-�--- -"'"--`-- -"'--"`"—"'—'—""'_______s..____•._._.--- a__ 1 I Project Name Turnberry South Phase 1 2 Project Area(ac) 18.92 3 Coastal Wetland Area(ac) . - 4 Surface Water Area(ac) - 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 1 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 i Bayfilter 0 26 I Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 'Name and Title: Carlo Pardo, PE 28 Organization: Bowman North Carolina,Ltd. 29 Street address: 4006 Barrett Drive,Suite 104 30 City,State,Zip: Raleigh,NC 27609 31 Phone number(s): 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer \\�\\\1111111if1/;f//// 1.---)4 o�o,ESSf.' 4/.1; % 9 SEAL Signat o Designer 051571 ,,Aii,II ///7l!//iIIIGIam10 \\ Date DRAINAGE AREAS 1 Is this a high density project? Yes , 2 ! If so,number of drainage areas/SCMs 2 3 Does s this project have low density areas? No 4 4 i If so,number of low density drainage areas 0 J Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM - Wet Pond BioRetention 5 Total drainage area(sq ft) 824106 sf 403800 616411 6 Onsite drainage area(sq ft) 824106 sf 403800 328663 7 Offsite drainage area(sq ft) 287748 8 Total BUA in project(sq ft) 328773 sf • 208172 sf 266449 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) 216000 sf 120000 sf 96000 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 112773 sf 88172 sf 24601 sf 11 Offsite BUA(sq ft) 145848 sf 12 ;Breakdown of new BUA not on subdivided lots: -Parking(sq ft) _ -Sidewalk(sq ft) 22692 sf 17159 sf 5533 sf -Roof(sq ft) -Roadway(sq ft) 90081 sf 71013 sf 19068 sf -Future(sq ft) i -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq_ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 16 Existing BUA that is already permitted(q ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 39.89% 51.6% 43.2% 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) _ _ 19332 cf 26625 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Drainage Area 2's offsite area is on Parcel 494550301299.The offsite BUA will include 88,000 sf on 22 lots,and 57,848 sf of roadways and sidewalks. BIORETENTION CELL 1 Drainage area number 2 2 Minimum required treatment volume(cu ft) 22552 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? i Yes 4 Is the SCM located away from contaminated soils? 1Yes _ 5 What are the side slopes of the SCM(H:V)? 3:1 Does the SCM have retaining walls,gabion walls or other engineered 6 side slopes? No Are the inlets,outlets,and receiving stream protected from erosion 7 (10-year storm)? Yes Is there an overflow or bypass for inflow volume in excess of the 8 design volume? Yes g What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable.will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes _ 13 If the SCM is on a single family lot,does(will?)the plat comply with N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes BIORETENTION CELL MDC FROM 02H.1052 18 SHWT elevation(fmsl) 205.00 ' 19 Bottom of the bioretention cell(fmsl) 220.00 20 Ponding depth of the design storm(inches) 7 in 21 Surface area of the bioretention cell(square feet) 43600 sf 22 Design volume of SCM(Cu ft) 26625 cf 23 Is the bioretention cell used for peak attenuation? Yes 24 Depth of peak attenuation over planting surface(in) 29.16 in 25 Height of peak attenuation outlet above the planting surface(in) 29.16 in 26 Infiltration rate of the in situ soil(inch/hour) 2 in/hr 27 Diameter of the underdrain pipes(if applicable) 4 in 28 Does the design include Internal Water Storage(IWS)? Yes 29 if so,elevation of the top of the IWS(fmsl) 218.5 30 Elevation of the planting surface(fmsl) 220.00 31 What type of vegetation will be planted? (grass,trees/shrubs, other)? I Grass 32 Media depth(inches) I 30 in _33 Percentage of medium to coarse washed sand by volume ; 75-85% _34 Percentage of fines(silt and clay)by volume 8-10% _ 35 Percentage of organic matter by volume 5-10% 36 Type of organic material Pine Bark Fines 37 ;Phosphorus Index(P-Index)of media(unitless) 30 — 38 Will compaction be avoided during construction? Yes 39 Will cell be maintained to a one inch/hour standard? Yes 40 Depth of mulch,if applicable(inches) , 41 Type of mulch,if applicable 42 How many clean out pipes are being installed? 47 43 Type of pretreatment that will be used: Forebay ADDITIONAL INFORMATION Please use this space to provide any additional information about the bioretention cell(s):LA4 : Bioretention 1 1:04 PM 6/21/2024 WET POND 1 Drainage area number ; 1 2 Minimum required treatment volume(cu ft) ; 17295 cf I GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered Yes side slopes? 7Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Pump(preferredL - 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13!If the SCM is on a single family lot,does(will?)the plat comply with WA General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes - 15 Is there an O&M Plan that complies with General MDC(12)? Yes _- 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA _ 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth(bottom of sediment 220.00 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 221.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 226.50 23 Elevation of the permanent pool(fmsl) 227.00 24 Elevation of the top of the vegetated shelf(fmsl) 227.50 25 Elevation of the temporary pool(fmsl) 228.30 _ 26 Surface area of the main permanent pool(square feet) 9630 _ 27 Volume of the main permanent pool(cubic feet) 41228 cf 28 Average depth of the main pool(feet) 4.67 ft 29 Average depth equation used Equation 3 30 If using equation 3,main pool perimeter(feet) 446.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 32 Volume of the forebay(cubic feet) 7830 cf 33 Is this 15-20%of the volume in the main pool? Yes 34 Clean-out depth for forebay(inches) 12 in 35 Design volume of SCM(cu ft) 19332 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 2.00 in 38 If weir,weir height(inches) r 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 2.55 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance(inches) 30 in 44 Depth of forebay at exit(inches) 24 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) 6:1 48 Does the orifice drawdown from below the top surface of the Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- yes yr,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes - 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda 54,Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION 55'Please use this space to provide any additional information about the wet pond(s): Wet Pond MDC 6 requires that the main pool be equipped with a vegetative shelf around it's perimeter.No vegetated shelf is provided along the perimeter of the retaining wall.However,the retaining wall includes a fence that will deter any humans from getting into the pond.Therefore.the fence on the retaining wall meets the requirements for MDC 6. Wet Pond 1 1:04 PM 6/21/2024 WATER QUALITY/QUANTITY WET POND SCM 1 9I11/90 it/ j'1111`s<\ I I l S UI /(I I IIr11ly/ C( )' /%/!/1,_✓� ll(\ l )L✓ Ic\ i\w\`vl\I I�/�i/Ilj v, ,,,,./ . / I a �II 111 Ill �� rl �` l <�(� N U1111111j11 III (z�_ I I )1 ,' �/ar 41 ��11 III�I117II1J 1\�� / V AVA �11111 {( I >Il /) Jl \ I �� to z 1 ti L )/� 91 III I111\VAI£�1V\11�Al�t V��A \VA \ I� �)� c I n VA AVA�IIAl IIII ll�l��`y�^1° ��-��^V1AAi (( \A�(%/ (�� � �� i /_ ----� -1_-.„'' 1 •-%_d `y v 1 t r V\� VAAV��� ��v�VA V AV 1l ,. AA �� o lA�\VAV1QI��l\��� ��/�I ) I ) l l r�i� � ., f A \ ( I v 11 C �VAAIt i /( I �� I-r.,��� ' t l / J s ` \ V 1� �l V`\�V \ AAA � I 4 3' �J AV I (II II��V\(� ��\� .�-i% l� l V11 IIII / /.> v —� �. l A 1 I c ( �� e I ��� ,� 1 a ) , l y�11 vv\ y �� vv\� ' A 9�`,t /�/%1 1I I / �(i/� -)9 ��— I.9�' vzv / `ll 5 � , � 1Tr i- _� (CI ` � ���Av� 1�\ --"-', ���i � AA\ I I / A\ i � II(� � �� IIL- I I \ � ��A-�� 11 � Lro � 7 `� SV�>,.---��--,\ � �r-�` '' �< <y S ! // 1 I�l V AA ��-// -7 1 1 I 1AA�` `.\ 1 5 `� � ✓ 1� I"' VA�A�� 1\l \ ''N�� � Ai/ / j J0 �1 \� �t1��VA�111%%%��Ilt�/ (�I11 IIII 1\V1�121 � �;�a��VA�c/A�VI� /1� �� 1 < �c \ �� ����� VAS AV\v\V AA VA�V � hVA�V A (!/ �/ ( II_,�-„A//I = j,lI _// II '' !✓1 �sl ��y,�„ ,, �,r ,A\ ( 9A 11 z z z �9, � �. j v1 \ /�\�\1 1 I 1 I9 \ /VAAV)1�111111111�! lI j 111�1f11I)(I IIVI V III}I( 11 1 1. r 1Ill,llll ) V HP -,\�\11�111(l,l '—"\y-, „.-- -:—,2/�� ,�,•✓JI(r1�11 �)- ,. -������� \ ) ��e J rt�;x-ei, �", v �� ' 7 /1�� HIIi)yW, `0 ,1 �0 111111i11,, (^AVA; AI//� � �j�/i/�%7,t_ - �)// )( r,,"` 911.1 9',/ ',s," �fll C' IrO \ 1✓� A���.��� ���� �: cear iik ( f�1�r � i� �l ���� 1� - 11 -✓////�,��tiin a _ i--- �r� z% ��l 1A��AV� IA ��A� / ✓ 711E OFCONCEN7RA710N �; ho o ��: I�v /j/ 1VAA- � > 1 �� ll ///552-��� ����� �.�`�� / a// \ I VI 1 / VA 1 h v �V / ,,/'-- t :�z/1 -'.. lip < �1 / �rl / / v� � _ Ft01Y PATH d 5v� A' � v�� ���v�` ���•�� �' V �i` 1 / Y�� �� 11✓� r`'/1 �1111�,>>1v � / I /f1r ,,\_. w lir���A�� �� �// r z?d . �� A, L I o III AAVAA �1��✓ sa�> Ji< ,.(�A , \V�\VAA ( , � z�' I � �� I 1Ij,l' `� 11 �` t v e /< `�, (• > ,l \ v F, // i `� - -L e �11� ' > > 1 ✓ f fl !I C AV � � --� � f e , r ( / t i I � � e ( >e 1 � � I � CCI - i� N�11111VA \ \1 l��\/C1 ����VAti �AA\ A��yl� �� _ I \\ �/< )1Al Ile 11 II7�11 1 l of ( / U l / 1A\ Oslo �A �VJ- >1V�\vA�V ` \�°` V ,*z � {� v _ l N / A�- s�A 1 1-v �`'h l �A 1 �V �� / / )(CC� VA �� °- )l `.� �-- J III V - � ',.\ J r \ /r' — 1 ((//�I 11 1 l (1 v A V v I I l w l A\ �lAr IG� r V1A1�1/III Illl1�11\ A 1 1 Z°(� VV(lQ� ��� �1\V �_� ,, _,,,,„_,--\, '�111\Vl - 1� 1 Il �`AVA V 1A \Z ,?"��It, l l �� /,z ��� j / 1}�Ii�Ic 11W vVvvvvVA1 )vvv v> / )(a. „1V w�h AvAlA V Al c�1 v 1 1VV / 1 I I ( ) 1 \ 1A ,\1 , 1 �1 A )v ! °1�_ - VAIN 1111\))VAAt��l,lA��,� _ �yfpt t, �\, 1zEV A �_I vzr/ , I ���,/ v�0w� r 1 Q o� � � 1 � � 1II )/ F . I /l1)/ // /i //of 1\\�'', • ', -` \1v1(\III ow � 1 ) 1 POST-DEVELOPED J �,Jf, / =; r, . DRAINAGE AREA �,,/< 1 v ,, �° o a 11`I`Ill V ✓�JIIl11 II\IIII( _�' sTV1/v II CI\) \\ l \�111 II /ice / l// ( / Uf /��� I t i(i�i oo,e„eA ( \ A ( e a E 1 p ll I 1 /�r)�/� f _ � �` >a V A j �'° 1 1 1 ) A l / 1 3 d E \ 11A t _-' -/ / 1 --�/��/l///il/ / S V A51 ,- > 1(1 1 )I( , I\ sl 1 v t m m l 1A��� r C // ( ✓ / J 41 1 \ _ I l A 1 l c .• WAN (lVc !✓ 1 ✓ i -�,ry( /v I II AN l I 1 1I14)I f r.7 B %)/(4 //I d i 11/� 1 v \\\ \ V ./ri< rl✓ / / ` � ` �. \,c_11,\\\ /}/7- _y2/r-> 2.,_//,./s)////> AV AA �� j e �n I V , S Q z I iiir ) )\) )J))) 7/ / V IC: w 57t, \N / z 2 k, 4 WL,k \ G9 269 PC MB / 1I 1 1 1 1 l > 1-\\_,?_,, 1 iv.oas,slat'?'°''s,''''':'�wM. °Pti a ¢ [� o 0. (( \ (_\ I\ __ _ 4Nk.„,... a. "„ear bi _�:(1(,. --\ 1, 23.--2'. c ' 0 Lit \\ \ �t9 A G i I Gc uJ 1 I -- \ \\\\\ 2)-')11111k‘ ,,, '''-- of)/ ))/ 1 \.,,, \ ) _ r,,)6 yl.'Z''';'?;1„,07„,,,,,..1‘ ,g,.. \I N\ 5, __,_2 ) 1'lt.\\\ 111,10,1 I L „.,),>;1\ * ',)::: .,),,),‘,,,.,,,s ,),.0:), ,.4)101(4;A>):.104t,, , ,4 1:: ik 1,--..a...7.. / !.... ,g..,: g. . - CC �iLc ���'� e • miv_ v .t M �o Re• S ti , i � f'a�cSsia..4. \\ c'''\''‘\1's,‘,1.t.s.,:\ts.\\.\\S:: �� o�Mac".9 _ ►s/� -_' ��� r✓ -`�I �I "I 16 /, n55,,, :' t‘-\\_vp.,>,7: r \ 11 / � / I � l ��\ \. �/ , u of . � >s �r�. ,,-\\7 „)ji /( //i/;-:__,---:,. r . . 1 b., ,4„,.. oic,-,,,17~.:\x , „ ,„ \.\,, ,,,,_.es ,‘, „„,1 ,, , \\VN li \b -\\\)\-w))6)!II POST-DEVELOPED DRAINAGE AREA f s., rw/ .`--5 s25F T N \ ei , li . n,,,// � � �� 'DIE OF CONCEN7RA11011�. � - �� -t � ��, 1 SCM#2 7.55 AC (ON SITE) ` °`' FlOW PATM - 'Ir PLAN STATUS �� ' c, r `� °P»>Ss�c��' � w�\` 07/13/23 INITIAL SUBMISSION 4 ��� III... r\\\\\\irl\I4ilii�':7�, '�.I`/;ii= /�� ` ., As. case..` .,�...01 a� �0�os\ •�' cs`q,�l ` `"��N-, of os , �,'.` , POST DEVELOPED DRAINAGE AREA U Pri -, --- „ ......-.-,...1.1,,..... �� � I SCM#2 14.15 AC OVERALL) __ � ,5o � �� ` r�a,.. i, DATE OESGRIPTION ✓� '� )1 (INCLUDING FUTURE PHASE) 1 , ' ‘1.°- , 1( \� (� �� c III Igo �,v��; _ cB Ce cEP / v��'�� // v'°� __, � - 1r e v v se v N_� �" '�Saq DESIGN DRANM CHKD _ I, s' � ,n�z v L �,o / „%_1` a SCALE H: I e 1 4. �s3' GRAPHIC SCALE Joe No. 220164-01-007 �1111 � aasss Ity �i. �`.4 — a // I I I l 1 )) �/ �� `VA., ' �e- I�� �_ �_ ,.‘� c,� e��s '�� ��e� �eN o°Nj ," o Aso �� .';,',Z----, --;--a.::4 i 1. � � ° %� .'�,, Na`�,,��s�� � DATE JULY 13, 2023 ..‘ ) )//t1;<7 h ., I\ ,, ;--,„.,,s\ „ 1 )))7//»fd/ /- ,,/�� I�' ° es 1� �� �� J •;/h �n( N eeEz) ni _ 1 t lil �� r nKig,,,gillitip\-.11'1'.. ( e �y�,.�'/�../Alb, '`� ) / : 1inch— 30 1t, �_ _ �, � SHEET �U, Cad fie none:\G r 64-Stanegate\220164-0I-007(ENG)-Tumberry South-Raeford NC\Engineerng\Engineerng Plans\Construction Drawings\220164-01-067-O(P_CPAeg Bowman North Carolina, Ltd. Turnberry South, Hoke County, NC Curve Number Calculation (CN) Pre-Developed Conditions(Wet Pond #1) Drainage Area(acres): 9.27 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A NoB/WaB Norfolk/Wagram Loamy Sand 5.17 56% C BaD Blaney Loamy Sand 4.10 44% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Wooded -Good Stand A 5.17 50 27.9 Wooded -Good Stand C 4.10 73 32.3 Cumulative Curve#= 60.2 Bowman North Carolina, Ltd. Turnberry South, Hoke County, NC Curve Number Calculation (CN) Post-Developed Conditions(Wet Pond #1) Drainage Area(acres): 9.27 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A NoB/WaB Norfolk/Wagram Loamy Sand 5.17 56% C BaD Blaney Loamy Sand 4.10 44% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A 0.00 55 0.0 Open Space-Good Condition C 2.22 77 18.4 Impervious Area 4.78 98 50.5 Cumulative Curve#= 69.0 Proposed Wet Pond Project Information Project Name: Turnberry South Project#: 220164-01-007 Designed by: CP Date: 6/16/2023 Revised by: CB Date: 12/6/2023 Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 9.27 Acres 403,800 sf Impervious Area (IA) = 4.78 Acres 208,172 sf Percent Impervious (I) = 51.55 % Required Surface Area Permament Pool Depth: 4.67 ft SA/DA= 1.408 Min Req'd Surface Area = 5,686 sf(at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non-Coastal County Determine Rv Value = 0.05 + .009 (I) = 0.514 in/in Storage Volume Required = 17,295 cf(above Permanent Pool) Elevations Top of Pond Elevation = 231.00 ft Temporary Pool Elevation = 228.30 ft Permanent Pool Elevation = 227.00 ft Shelf Begining Elevation = 227.50 ft Forebay Weir= 226.00 ft Shelf Ending Elevation = 226.50 ft Bottom Elevation = 221.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 9,630 sf Volume of Temporary Storage = 19,332 cf Is Permenant Pool Surface Area Sufficient(yes/no)? Yes ( 9630 > 5686 ) sf Volume of Storage for Design Storm = 19,332 Yes ( 19332 > 17295 ) cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD-Water Quality Volume Project Information Project Name: Turnberry South Project#: 220164-01-007 Designed by: CP Date: 6/16/2023 Checked by: CB Date: 12/12/2023 Water Quality Orifice *Incremental Determination of Water Quality Volume Drawdown Time A Zone 3 Q3=0.0437 CD*D2(Z-D/24-Ei)"(1/2) V • Zone 2 Q2=0.372 CD*D*(Z-Ei)^(3/2) ♦ Zone 1 Q1 =0 • Orifice Diameter(D)= 2 in Cd= 0.6 Ei= 227 Orifice Inv. Zone 1 Range= 0.00 to 227 Zone 2 Range= 227 to 227.1 Zone 3 Range= 227.1 to 228 Incremental Drawdown Method Contour Incremental Drawdown Countour Area Volume Stage,Z Zone Q Time sq ft cu ft ft cfs min 227.00 _ 13,600 0 0.00 _ 2.00 0.000 -- 227.50 _ 14,740 7,085 0.50 _ 3.00 0.068 1,744 228.00 _ 15,450 7,548 1.00 _ 3.00 0.100 1,253 228.30 15,880 4,700 2.00 3.00 0.116 677 Total -- 19,333 -- -- -- 3,674 Drawdown Time=Incremental Volume/Q/60sec/min Summary Total Volume= 19,333 cf Total Time= 3,674 min Total Time= 2.55 days 4/2/2024 Prop Wet Pond#1-new design(Montrose).xls 1 of 1 Project: Pond #4 Date: 4/2/2024 Main-Pond Contours-Volumes Elevation Main-Pond Incremental Vol. Accumulated Vol. Description 227 9,630 4,598 41,228 A2 (Perm_Pool) 226.5 8,760 4,310 36,630 Al (Bottom_Shelf) 226 8,480 8,045 32,320 225 7,610 7,210 24,275 224 6,810 6,430 17,065 223 6,050 5,680 10,635 222 5,310 4,955 4,955 221 4,600 0 0 A3 (Bottom_Pond) Forebay Contours-Volumes Elevation FB1 FB2 FB3 Total-Areas Incremental Vol. Accumulated Vol. 227 3,760 3,760 1,835 7,830 226.5 3,580 3,580 1,748 5,995 226 3,410 3,410 3,155 4,248 225 2,900 2,900 1,093 1,093 224.5 1,470 1,470 0 0 Forebay Volume 19.0% *Between 15% &20% Average Depth (Option 1) 4.18 *At least 3'average depth Average Depth Calculation (Option 2) Vpp 41,228 permeter of shelf 446 width of shelf 3 Al (Bottom_Shelf): 8,760 Average Depth = 4.67 Proposed Wet Pond Project Information Project Name: Turnberry South Project#: 220164-01-007 Designed by: CP Date: 6/16/2023 Revised by: CB Date: 12/12/2023 Checked by: Date: Site Information Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 9.27 Acres Impervious Area (IA) = 4.78 Acres Percent Impervious (I) = 51.55 % (Drainage Area) Orifice Sizing Orifice Size = 2.00 in (Diameter) Drawdown Time = 2.55 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day(yes/no) ? yes Anti-Flotation Device 4'x 4' Outlet Structure Area: 16.0 sf Volume: 160.0 cf (Water Displaced -Top of Pond to Bottom of Pond) Weight: 9984 lbs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 11,981 lbs Volume of Concrete Req'd: 79.9 cf (Unit WT of Concrete = 150 pcf) Volume Provided: 85.5 cf (4'x4' riser x 3' =48sf, 5'x5'footing x 1.5' =37.5cf) / 1 / ) \ / \ � , \� 1 '\ I / \ STORMWATER ,i �� --� \ - N ti \ I 1 1 MANAGEMENT \ \ - Ilt > 1 \ EASEMENT \� �: \ \ // \ ),\- -� \ - %�'/•,235.0(TW) \ / N-'\ 1�34 ----1 /' • 234.0(BW) \ I _ \„ fl 233.6(TW) \\ i4. L , RIP RAP DISSIPATER PAD r , ''• \ mit -- WIDTH=7.5' sif ' \ _„, it \ \LENGTH=6.0 __ //1 THICKNESS=12" I I RIP RAP CLASS=A --- \\ \\ \\ // / II I\ ` FES INV=226.7 /� , Milk 0"0 ...vv.- C 11**IssiMiirei 1\~ CONCRETE\ `N�`! \ �/ I � III�� /_ i / \ SEEPAGE COLLAR \/ \ \ - I I .��, 41I /-� r 18" OUTLET PIPE \ �;_ ►�1.�11 i // REFER TO DETAILS J \ ` I \ / j` ,' 17 / /// ON THIS SHEET 11 ti 233.0(TW) ( 1 t z1 \ 226.0(BW)I I ( /// / ) /- \ \ I 1 I\ I /233.0(TW) // /it / I 1 \ OUTLET CONTROL 1 1 IIt1I(Lc/air ,. . aiyI4I/i1 \ STCTI ) / /THISSHEET \ / / / / i/ / MAIN POND AREA 1 I� I _. -/ / ii / / ) / ;-ems I I < I '!" I 234.0(TW)' [ / ' I I \J N _ - ' , r �p1 / 226.0(BW) SOD AREAS ABOVE /I ���J'��c t III 1 VEGETATIVE SHELF\ I Ili"' -4__J=Y$ �iI o I ELEVATION = 227.5 I Y / / �� �� / / �J / / I I t s I / I �, f CLASS B RIP-RAP / I / / 91/ I/ / // /7 i ����� AT FOREBAY WEIR \ _-/-'- / / / / � / _ J/ / i 235.0(TW) I /� // // / TOP OF / I -- / 226.0(BW) \ / / r/ / / EMBANKMENT ›/ _i i /// / / 1 Ak ;! / ' I I ( l J 1 /___./ ELEV=231.0--- \------- ..-- ...-- \ i ict // �� f �/ �/ /\ Q j( 6...--i-,..., � /��ill1ni� 2270(BW) LITORAL SHELF 7% y � � 1411I�r 8�� / ( i , AREA=1,730 SF ,/ _ � = ,, •�' ��' 41 r // REFER TO DETAIL G/lJ / / \ yam -C / �'233.0(TW�/ �� INLET PIPE WITH FOR PLANTINGS �- i �� Ilk/ RIP RAP APRON / L �`-1Ift,ri 111 230.0(6W) If i v ii N.r '�_f_ - 7\ ♦ / �... �I RIP RAP DISSIPATER PAD . - ft,, �,� : / ��1�� �� WIDTH=18.0' - dI I LENGTH=16.0' -J STORMWATER, / ��II�_lip 240.0(TW). //� THICKNESS=36„ MANAGEMENT / �� 235.0(BW) �, RIP RAP CLASS=2 FOREBAY AREA I /EASEMENT/ � / � ►�� i 1 I GRAPHIC SCALE 300 15 60 120 PLAN VIEW ( IN FEET ) III 1 inch = 30 ft. STAGE/STORAGE TABLE STAGE(FT) ELEVATION (FT) CONTOUR AREA INCREMENTAL TOTAL STORAGE (SF) STORAGE (CF) (CF) 0.0 227.0 13,600 0 0 0.5 227.5 14,740 7,085 7,085 1.0 228.0 15,450 7,548 14,633 1.3 228.3 15,880 4,700 19,332 (WQV) 2.0 229.0 16,890 11,470 30,802 3.0 230.0 18,310 17,600 48,402 4.0 231.0 19,610 18,960 67,362 "STORMWATER MANAGEMENT DESIGN WET DETENTION POND: RIVER BASIN: CAPE FEAR RECEIVING STREAM: BEAVER CREEK STREAM INDEX: 18-31-19-5 STREAM CLASS: C HUC: 0303000406 PROJECT COORDINATES: 35.009339TI, -79.160924'W POND DESIGN SUMMARY DRAINAGE AREA TO POND: 9.27 ACRES SITE IMPERVIOUS AREA TO POND: 4.78 ACRES OFF-SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 4.78 ACRES PRE-DEVELOPED POST-DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 9.27 AC 9.27 AC CURVE NUMBER: 60.2 69.0 TIME OF CONCENTRATION: 21.8 MIN 5 MIN 1.0" STORM EVENT: 0.026 CFS 0.000 CFS 1-YEAR STORM EVENT: 1.982 CFS 10.51 CFS 0.107 CFS 2-YEAR STORM EVENT: 4.496 CFS 16.63 CFS 0.488 CFS 10-YEAR STORM EVENT: 14.44 CFS 35.92 CFS 5.460 CFS 100-YEAR STORM EVENT: 34.76 CFS 71.38 CFS 14.67 CFS SHALLOW LAND ZONE HERBACEOUS PLANTS SHALLOW WATER ZONE ` HERBACEOUS PLANTS f p POND (NORMAL POOL) 1I 6 TYPICAL LITTORAL SHELF VEGETATION DETAIL SCALE: N.T.S. SCIENTIFIC NAME COMMON NAME PLANTING ZONE QUANTITY NURSERY CONTAINER SPACING PLANTING SEASON TYPE Jancus effesus Soft Rush SHALLOW LAND 75 PEAT POT 6' O.C. SPRING/SUMMER Iris virginica Blue Flag Iris SHALLOW LAND 75 PEAT POT 6' O.C. SPRING/SUMMER Schoenoplectus tabernaemontani Soft Stem Bulrush SHALLOW LAND 75 PEAT POT 6' O.C. SPRING/SUMMER Eupatoriadelphus maculatus Spotted Trumpetweed SHALLOW WATER 75 PEAT POT 6' O.C. SPRING/SUMMER Eupatoriadelphus fistulosus Joe-Pye Weed SHALLOW WATER 75 PEAT POT 6' O.C. SPRING/SUMMER Rhynchospora colorata Starrush Whitetop SHALLOW WATER 75 PEAT POT 6' O.C. SPRING/SUMMER TYPICAL LITTORAL SHELF PLANTING SCHEDULE 4'MIN EMBANKMENT WIDTH 6"TOPSOIL FOR ALL AREAS ABOVE THE TRASH RACK NORMAL POND ELEVATION REFER TO DETAIL THIS SHEET 18"HDPE WITH WATER TIGHT SEAL PIPE TO BE BEDDED TOP OF EMBANKMENT ELEVATION=231.0 PER DIRECTION OF GEOTECHNICAL 6"TOPSOIL ABOVE // \\ NOTE:1.0"STORM ELEVATION IS 227.0 AND INTERMEDIATE WEIR IS ELEVATION 228.3.THERE IS ADDITIONAL STORAGE ENGINEER 3 _ _ _ _ 6°CLAY LINER REFER TO DETAIL 100 YEAR STORM ELEVATION=230.75 DESIGNED FROM THE 1.0"STORM ELEVATION TO THE ON LITTORAL SHELF HEIR.... HEIR FOR INCREMENTAL INTERMEDIATE WEIR ELEVATION. 1 6°CLAY SOIL LINER ON INSIDE FACE OF 10 YEAR STORM FI EVATION=729 00 EMBANKMENT 1 6 44'PRECAST 6FT LITTORAL 1 1 ..=/ CONCRETE RISER < SHELF 2 YEAR STORM ELEVATION=228.41 AS NECESSARY) 1 YEAR STORM ELEVATION=228.18 INV=227.0 r 1.0-INCH STORM ELEVATION=227.0 EXISTING GRADE=231.Ot JI 0 NORMAL POND ELEVATION=227.0 •. L PVC ELBOW SEE DETAIL 3'MIN \1 ELEV=224.0 2 NOTE:PUMPS SHALL BE USED TO DRAIN 1 1 THE THIS SHEEETD WFOR DEWAEN TERING REQSARY. UIREMENTS. REFERD 4'NIN. ASTM C-923 SEAL - - KEY BETWEEN BARREL&RISER. - CUTOFF TRENCH RISER BASE TO BE FILLED --_ BOTTOM OF POND(TOP OF SEDIMENT STORAGE=221.0 WITH CONC.TO INVERT OF ) APPROXIMATE SIZE BARREL CONCRETE SHALL BE _ - PLACED IN RISER AFTER _ EXCAVATE AND BACKFlLL 8"XB"X1°X12°LONG ANGLE(6 TOT.REQUIRED)TO ANCHOR RISER TO ANGLES ARE SECURED (BOTTOM OF SEDIMENT STORAGE)=220.0 WITH COMPACTED BASE.PROVIDE 2-3/4"A307 BOLTS FROM ANGLE TO RISER AND TO BASE AND RISER. Y� ICI II` _- STRUCTURAL FILL AS 2-A307 "J"HOOKS 3/4"DIA.X 12"LONG FROM ANGLE TO BASE. �L. ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER DIRECTED BY GEOTECHNICAL CONSTRUCTION.°J°HOOKS TO BE PLACED UNDER LOWER REINFORCING ENGINEER STEEL. 6"CLAY SOIL 5'x5'x1.5'CONC.BASE REINFORCE WITH#4 BARS AT 12°O.C.TOP LINER AND BOTTOM OF EACH DIRECTION PROVIDE 3"MIN.CLEARANCE MAIN POOL 37.-18°HDPE 10.80% BETWEEN EDGE OF CONC.AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM SCALE:N.T.S. 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERM FOREBAY TOP ELEV= 229.0 WIDTH AT TOP = 2.0 FT 6" TOPSOIL ABOVE 6" CLAY LINER 3:1 // / NOTE: PUMPS SHALL BE USED TO DRAIN ON LITTORAL SHELF //l THE FOREBAY WHEN NECESSARY. REFER TO DETAIL SEDIMENT STORAGE TOP THIS SHEET FOR DEWATERING REQUIREMENTS. J7 FOREBAY BOTTOM' ELEV=224.5 „,„ '. 6FT LITTORAL 6;1 1 ' NORMAL POND ELEVATION SHELF I �� BOTTOM LITTORAL SHELF ELEV. 1 1 CLASS B RIP-RAP OVER FILTER FABRIC MIN. 4' FOREBAY1 ....4444w WEIR AT ELEV=226.0 t;'` i v 6" TOPSOIL FOR ALL FOREBAY ENTRANCE SHALL BE II III v- AREAS ABOVE THE DEEPER THAN FOREBAY EXIT NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/EXIT BOTTOM OF SEDIMENT ELEV=224.0 STORAGE/ENTRANCE ELEV=223.5 FOREBAY ENTRANCE SHALL BE FOREBAY DEEPER THAN FOREBAY EXIT 12" 6.0' 14 REBAR®12"OC IN FRONT&REAR FACE OF COLLAR.REBAR TO 3.0 _ HAVE 3"MIN.CONC.COVER FROM EDGE OR FACE OF COLLAR d a • Q • • d a a° • • ° d ° d da d°'• 18" HDPE ; ° � 1 ° dd • mad . • ° CONCRETE SEEPAGE COLLAR SCALE: N.T.S. TOP OF STRUCTURE NOT SHOWN FOR CLARITY Top or (REMOVABLE TRASH RACK) WFlR`229.0 ry�RMFO/q 827q ell• 30 FT OUTLET CONTROL STRUCTURE-INCREMENTAL WEIR SCALE: N.T.S. RISER STRUCTURE 4"PVC SCREW CAP FOR CLEANING ACCESS 12"MIN. EXTEND 4" PVC THROUGH hilL RISER STRUCTURE 4"x4"PVC TEE PERM.POND ELEV.=227.0 INSTALL 4"PVC SCREW CAP AT END OF TEE AND DRILL 2"DIA.HOLE INTO PVC CAP AT ELEV=227.0 12"MIN. 2"DIA.OPENING PVC DRAIN OUTLET SCALE: N.T.S. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 3 Peak Flow Period Post Through Pond 12.37 - 12.03 = 0.34 - 1 hour Hydrograph type = Reservoir Peak discharge = 14.67 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 142,807 cuft Inflow hyd. No. = 2 - BMP Post-DevelorRdservoir name = BMP Pond Max. Elevation = 230.75 ft Max. Storage = 62,582 cuft Storage Indication method used. Hydrograph Discharge Table (Printed values>=1.00%ofQp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.77 23.63 228.36 0.290 0.112 0.164 0.276 11.80 29.25 228.55 1.367 0.107 1.257 1.363 11.83 37.64 228.78 3.402 0.098 3.299 3.397 11.87 48.50 229.05 6.294 0.068 5.656 0.570 6.294 11.90 61.25 229.37 9.988 0.032 4.938 5.016 9.986 11.93 71.38 « 229.75 11.86 0.018 4.520 7.308 11.85 11.97 70.53 230.14 13.11 0.012 4.391 8.696 13.10 12.00 56.22 230.45 13.97 0.010 4.383 9.563 0.000 13.96 12.03 35.75 230.65 14.48 0.008 4.187 9.555 0.664 14.41 12.07 19.84 230.74 14.70 0.007 4.100 9.508 1.018 14.63 12.10 12.39 230.75 « 14.72 0.007 4.093 9.509 1.056 14.67 12.13 10.22 230.73 14.67 0.007 4.108 9.508 0.970 14.59 12.17 9.807 230.70 14.59 0.008 4.130 9.509 0.852 14.50 12.20 9.414 230.67 14.52 0.008 4.170 9.541 0.719 14.44 12.23 9.019 230.63 14.43 0.008 4.213 9.576 0.577 14.37 12.27 8.620 230.60 14.35 0.008 4.259 9.613 0.426 14.31 12.30 8.215 230.56 14.25 0.009 4.307 9.639 0.268 14.22 12.33 7.809 230.52 14.15 0.009 4.357 9.668 0.101 14.13 12.37 7.399 230.48 14.04 0.010 4.386 9.639 0.000 14.03 12.40 6.986 230.44 13.93 0.010 4.382 9.527 0.000 13.92 Continues on next page... 2 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.43 6.570 230.39 13.81 0.010 4.378 9.409 13.80 12.47 6.150 230.35 13.69 0.010 4.372 9.273 13.66 12.50 5.729 230.30 13.56 0.011 4.365 9.133 13.51 12.53 5.340 230.25 13.42 0.011 4.374 9.006 13.39 12.57 5.049 230.20 13.28 0.012 4.382 8.874 13.27 12.60 4.867 230.15 13.13 0.012 4.390 8.720 13.12 12.63 4.752 230.09 12.98 0.013 4.397 8.565 12.98 12.67 4.659 230.04 12.83 0.013 4.407 8.398 12.82 12.70 4.566 229.99 12.68 0.014 4.420 8.229 12.66 12.73 4.472 229.94 12.52 0.015 4.444 8.050 12.51 12.77 4.378 229.88 12.35 0.016 4.467 7.858 12.34 12.80 4.283 229.83 12.16 0.016 4.486 7.642 12.14 12.83 4.188 229.77 11.95 0.017 4.509 7.414 11.94 12.87 4.093 229.72 11.73 0.019 4.534 7.176 11.73 12.90 3.997 229.67 11.51 0.020 4.565 6.922 11.51 12.93 3.901 229.62 11.29 0.021 4.599 6.659 11.28 12.97 3.805 229.57 11.05 0.023 4.645 6.378 11.05 13.00 3.708 229.52 10.81 0.024 4.697 6.090 10.81 13.03 3.616 229.47 10.57 0.026 4.762 5.775 10.56 13.07 3.537 229.42 10.31 0.029 4.835 5.444 10.31 13.10 3.474 229.38 10.04 0.031 4.921 5.083 10.04 13.13 3.419 229.34 9.747 0.034 5.022 4.689 9.745 13.17 3.368 229.29 9.449 0.037 5.130 4.279 9.446 13.20 3.316 229.25 9.069 0.042 5.290 3.736 9.067 13.23 3.265 229.21 8.710 0.046 5.441 3.223 8.709 13.27 3.213 229.18 8.244 0.051 5.578 2.615 8.243 13.30 3.161 229.15 7.733 0.056 5.701 1.975 7.732 13.33 3.109 229.12 7.268 0.061 5.813 1.393 7.267 Continues on next page... 3 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.37 3.057 229.09 6.848 0.064 5.826 0.957 6.847 13.40 3.004 229.06 6.470 0.067 5.710 0.693 6.469 13.43 2.952 229.04 6.124 0.069 5.604 0.451 6.123 13.47 2.900 229.02 5.807 0.070 5.507 0.229 5.806 13.50 2.847 229.00 5.516 0.072 5.418 0.026 5.516 13.53 2.795 228.98 5.383 0.075 5.306 5.381 13.57 2.749 228.96 5.276 0.077 5.194 5.271 13.60 2.707 228.95 5.172 0.080 5.084 5.164 13.63 2.669 228.93 5.064 0.082 4.970 5.053 13.67 2.631 228.91 4.878 0.084 4.778 4.862 13.70 2.594 228.90 4.705 0.087 4.597 4.684 13.73 2.556 228.88 4.542 0.089 4.428 4.517 13.77 2.518 228.87 4.389 0.091 4.270 4.360 13.80 2.480 228.85 4.244 0.092 4.124 4.215 13.83 2.443 228.84 4.105 0.093 3.989 4.082 13.87 2.405 228.83 3.974 0.094 3.862 3.956 13.90 2.367 228.82 3.850 0.095 3.742 3.837 13.93 2.329 228.81 3.732 0.096 3.628 3.724 13.97 2.290 228.80 3.620 0.097 3.520 3.617 14.00 2.252 228.79 3.516 0.097 3.418 3.515 14.03 2.217 228.78 3.428 0.098 3.326 3.424 14.07 2.188 228.77 3.345 0.098 3.239 3.338 14.10 2.169 228.76 3.267 0.099 3.156 3.255 14.13 2.154 228.76 3.192 0.099 3.078 3.178 14.17 2.142 228.75 3.122 0.100 3.005 3.105 14.20 2.129 228.74 3.056 0.100 2.936 3.036 14.23 2.116 228.73 2.994 0.101 2.870 2.971 14.27 2.103 228.73 2.936 0.101 2.809 2.910 Continues on next page... 4 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.30 2.090 228.72 2.880 0.101 2.751 2.852 14.33 2.077 228.72 2.828 0.102 2.698 2.799 14.37 2.064 228.71 2.778 0.102 2.650 2.752 14.40 2.051 228.71 2.730 0.102 2.604 2.706 14.43 2.038 228.70 2.685 0.102 2.560 2.663 14.47 2.025 228.70 2.642 0.102 2.519 2.621 14.50 2.012 228.69 2.600 0.102 2.479 2.582 14.53 1.999 228.69 2.561 0.103 2.441 2.544 14.57 1.986 228.69 2.523 0.103 2.405 2.508 14.60 1.973 228.68 2.487 0.103 2.370 2.473 14.63 1.960 228.68 2.452 0.103 2.337 2.440 14.67 1.947 228.68 2.419 0.103 2.305 2.408 14.70 1.934 228.67 2.387 0.103 2.274 2.377 14.73 1.920 228.67 2.356 0.103 2.244 2.348 14.77 1.907 228.67 2.326 0.103 2.216 2.319 14.80 1.894 228.66 2.297 0.103 2.188 2.292 14.83 1.881 228.66 2.269 0.103 2.162 2.265 14.87 1.868 228.66 2.243 0.104 2.136 2.240 14.90 1.854 228.65 2.217 0.104 2.111 2.215 14.93 1.841 228.65 2.192 0.104 2.087 2.191 14.97 1.828 228.65 2.168 0.104 2.064 2.168 15.00 1.815 228.65 2.148 0.104 2.043 2.147 15.03 1.801 228.64 2.128 0.104 2.023 2.127 15.07 1.788 228.64 2.108 0.104 2.003 2.107 15.10 1.775 228.64 2.089 0.104 1.984 2.088 15.13 1.761 228.64 2.070 0.104 1.965 2.069 15.17 1.748 228.64 2.052 0.104 1.946 2.050 15.20 1.735 228.63 2.033 0.104 1.927 2.032 Continues on next page... 5 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 15.23 1.721 228.63 2.016 0.104 1.909 2.014 15.27 1.708 228.63 1.998 0.104 1.891 1.996 15.30 1.694 228.63 1.981 0.105 1.874 1.978 15.33 1.681 228.62 1.963 0.105 1.856 1.961 15.37 1.667 228.62 1.947 0.105 1.839 1.944 15.40 1.654 228.62 1.930 0.105 1.822 1.927 15.43 1.641 228.62 1.914 0.105 1.806 1.910 15.47 1.627 228.62 1.897 0.105 1.789 1.894 15.50 1.613 228.61 1.881 0.105 1.773 1.878 15.53 1.600 228.61 1.865 0.105 1.756 1.861 15.57 1.586 228.61 1.849 0.105 1.740 1.845 15.60 1.573 228.61 1.834 0.105 1.725 1.830 15.63 1.559 228.61 1.818 0.105 1.709 1.814 15.67 1.546 228.61 1.803 0.105 1.693 1.798 15.70 1.532 228.60 1.788 0.105 1.678 1.783 15.73 1.519 228.60 1.772 0.105 1.662 1.768 15.77 1.505 228.60 1.757 0.105 1.647 1.752 15.80 1.491 228.60 1.742 0.105 1.632 1.737 15.83 1.478 228.60 1.728 0.105 1.617 1.722 15.87 1.464 228.59 1.713 0.105 1.602 1.707 15.90 1.450 228.59 1.698 0.106 1.587 1.692 15.93 1.437 228.59 1.683 0.106 1.572 1.678 15.97 1.423 228.59 1.669 0.106 1.557 1.663 16.00 1.409 228.59 1.654 0.106 1.542 1.648 16.03 1.397 228.59 1.640 0.106 1.528 1.634 16.07 1.387 228.58 1.626 0.106 1.513 1.619 16.10 1.379 228.58 1.612 0.106 1.499 1.605 16.13 1.374 228.58 1.598 0.106 1.486 1.592 Continues on next page... 6 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 16.17 1.369 228.58 1.586 0.106 1.473 1.579 16.20 1.365 228.58 1.575 0.106 1.462 1.568 16.23 1.360 228.58 1.564 0.106 1.451 1.557 16.27 1.355 228.57 1.553 0.106 1.441 1.547 16.30 1.351 228.57 1.543 0.106 1.430 1.537 16.33 1.346 228.57 1.533 0.106 1.421 1.527 16.37 1.341 228.57 1.523 0.106 1.411 1.517 16.40 1.337 228.57 1.514 0.106 1.401 1.508 16.43 1.332 228.57 1.504 0.106 1.392 1.499 16.47 1.327 228.57 1.495 0.106 1.383 1.490 16.50 1.322 228.57 1.486 0.106 1.375 1.481 16.53 1.318 228.56 1.478 0.106 1.366 1.472 16.57 1.313 228.56 1.469 0.106 1.358 1.464 16.60 1.308 228.56 1.461 0.106 1.350 1.456 16.63 1.303 228.56 1.453 0.106 1.342 1.448 16.67 1.298 228.56 1.445 0.106 1.334 1.440 16.70 1.294 228.56 1.438 0.106 1.326 1.433 16.73 1.289 228.56 1.430 0.106 1.319 1.425 16.77 1.284 228.56 1.423 0.106 1.312 1.418 16.80 1.279 228.56 1.415 0.107 1.304 1.411 16.83 1.275 228.56 1.408 0.107 1.297 1.404 16.87 1.270 228.55 1.401 0.107 1.290 1.397 16.90 1.265 228.55 1.394 0.107 1.283 1.390 16.93 1.260 228.55 1.388 0.107 1.277 1.383 16.97 1.256 228.55 1.381 0.107 1.270 1.377 17.00 1.251 228.55 1.374 0.107 1.264 1.370 17.03 1.246 228.55 1.368 0.107 1.257 1.364 17.07 1.241 228.55 1.361 0.107 1.251 1.358 Continues on next page... 7 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 17.10 1.236 228.55 1.355 0.107 1.245 1.351 17.13 1.232 228.55 1.349 0.107 1.238 1.345 17.17 1.227 228.55 1.343 0.107 1.232 1.339 17.20 1.222 228.55 1.337 0.107 1.226 1.333 17.23 1.217 228.54 1.330 0.107 1.220 1.327 17.27 1.212 228.54 1.325 0.107 1.214 1.321 17.30 1.208 228.54 1.319 0.107 1.208 1.315 17.33 1.203 228.54 1.313 0.107 1.203 1.309 17.37 1.198 228.54 1.307 0.107 1.197 1.304 17.40 1.193 228.54 1.301 0.107 1.191 1.298 17.43 1.188 228.54 1.295 0.107 1.185 1.292 17.47 1.183 228.54 1.290 0.107 1.180 1.287 17.50 1.179 228.54 1.284 0.107 1.174 1.281 17.53 1.174 228.54 1.278 0.107 1.169 1.276 17.57 1.169 228.54 1.273 0.107 1.163 1.270 17.60 1.164 228.54 1.267 0.107 1.158 1.265 17.63 1.159 228.54 1.262 0.107 1.152 1.259 17.67 1.154 228.53 1.256 0.107 1.147 1.254 17.70 1.149 228.53 1.251 0.107 1.141 1.248 17.73 1.145 228.53 1.245 0.107 1.136 1.243 17.77 1.140 228.53 1.240 0.107 1.131 1.238 17.80 1.135 228.53 1.235 0.107 1.125 1.233 17.83 1.130 228.53 1.229 0.107 1.120 1.227 17.87 1.125 228.53 1.224 0.107 1.115 1.222 17.90 1.120 228.53 1.219 0.107 1.110 1.217 17.93 1.115 228.53 1.214 0.107 1.104 1.212 17.97 1.111 228.53 1.208 0.107 1.099 1.206 18.00 1.106 228.53 1.203 0.107 1.094 1.201 Continues on next page... 8 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.03 1.101 228.53 1.198 0.107 1.089 1.196 18.07 1.096 228.53 1.193 0.107 1.084 1.191 18.10 1.091 228.53 1.187 0.107 1.078 1.186 18.13 1.086 228.53 1.182 0.107 1.073 1.181 18.17 1.081 228.52 1.177 0.107 1.068 1.175 18.20 1.076 228.52 1.172 0.107 1.063 1.170 18.23 1.071 228.52 1.167 0.107 1.058 1.165 18.27 1.066 228.52 1.161 0.107 1.053 1.160 18.30 1.062 228.52 1.156 0.107 1.048 1.155 18.33 1.057 228.52 1.151 0.107 1.043 1.150 18.37 1.052 228.52 1.146 0.107 1.038 1.145 18.40 1.047 228.52 1.141 0.107 1.033 1.140 18.43 1.042 228.52 1.136 0.107 1.027 1.135 18.47 1.037 228.52 1.131 0.107 1.022 1.130 18.50 1.032 228.52 1.126 0.108 1.017 1.125 18.53 1.027 228.52 1.121 0.108 1.012 1.120 18.57 1.022 228.52 1.116 0.108 1.007 1.115 18.60 1.017 228.52 1.110 0.108 1.002 1.110 18.63 1.012 228.51 1.105 0.108 0.997 1.105 18.67 1.007 228.51 1.100 0.108 0.992 1.100 18.70 1.002 228.51 1.095 0.108 0.987 1.095 18.73 0.997 228.51 1.090 0.108 0.982 1.090 18.77 0.992 228.51 1.085 0.108 0.977 1.085 18.80 0.988 228.51 1.080 0.108 0.972 1.080 18.83 0.983 228.51 1.075 0.108 0.967 1.075 18.87 0.978 228.51 1.070 0.108 0.962 1.070 18.90 0.973 228.51 1.066 0.108 0.958 1.066 18.93 0.968 228.51 1.062 0.108 0.954 1.061 Continues on next page... 9 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.97 0.963 228.51 1.058 0.108 0.949 1.057 19.00 0.958 228.51 1.053 0.108 0.945 1.053 19.03 0.953 228.51 1.049 0.108 0.941 1.048 19.07 0.948 228.51 1.045 0.108 0.936 1.044 19.10 0.943 228.51 1.041 0.108 0.932 1.040 19.13 0.938 228.50 1.037 0.108 0.927 1.035 19.17 0.933 228.50 1.032 0.108 0.923 1.031 19.20 0.928 228.50 1.028 0.108 0.918 1.026 19.23 0.923 228.50 1.024 0.108 0.914 1.022 19.27 0.918 228.50 1.019 0.108 0.909 1.017 19.30 0.913 228.50 1.015 0.108 0.905 1.013 19.33 0.908 228.50 1.011 0.108 0.900 1.008 19.37 0.903 228.50 1.006 0.108 0.896 1.004 19.40 0.898 228.50 1.002 0.108 0.891 0.999 19.43 0.893 228.50 0.997 0.108 0.886 0.994 19.47 0.888 228.50 0.993 0.108 0.882 0.990 19.50 0.883 228.50 0.988 0.108 0.877 0.985 19.53 0.878 228.50 0.984 0.108 0.872 0.980 19.57 0.873 228.49 0.980 0.108 0.868 0.976 19.60 0.868 228.49 0.975 0.108 0.863 0.971 19.63 0.863 228.49 0.970 0.108 0.858 0.966 19.67 0.858 228.49 0.966 0.108 0.853 0.962 19.70 0.853 228.49 0.961 0.108 0.849 0.957 19.73 0.848 228.49 0.957 0.108 0.844 0.952 19.77 0.843 228.49 0.952 0.108 0.839 0.947 19.80 0.838 228.49 0.948 0.108 0.834 0.943 19.83 0.833 228.49 0.943 0.108 0.830 0.938 19.87 0.828 228.49 0.939 0.108 0.825 0.933 Continues on next page... 10 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 19.90 0.823 228.49 0.934 0.108 0.820 0.928 19.93 0.818 228.49 0.929 0.108 0.815 0.923 19.97 0.813 228.49 0.925 0.108 0.810 0.919 20.00 0.808 228.49 0.920 0.108 0.805 0.914 20.03 0.803 228.48 0.915 0.108 0.800 0.909 20.07 0.800 228.48 0.911 0.108 0.796 0.904 20.10 0.798 228.48 0.906 0.108 0.791 0.899 20.13 0.797 228.48 0.902 0.109 0.786 0.895 20.17 0.796 228.48 0.898 0.109 0.782 0.891 20.20 0.795 228.48 0.894 0.109 0.778 0.886 20.23 0.794 228.48 0.890 0.109 0.774 0.882 20.27 0.793 228.48 0.886 0.109 0.770 0.878 20.30 0.792 228.48 0.882 0.109 0.766 0.874 20.33 0.791 228.48 0.879 0.109 0.762 0.871 20.37 0.790 228.48 0.875 0.109 0.758 0.867 20.40 0.789 228.48 0.872 0.109 0.755 0.864 20.43 0.788 228.48 0.869 0.109 0.752 0.860 20.47 0.787 228.48 0.866 0.109 0.748 0.857 20.50 0.786 228.48 0.863 0.109 0.745 0.854 20.53 0.785 228.47 0.860 0.109 0.742 0.851 20.57 0.784 228.47 0.857 0.109 0.739 0.848 20.60 0.783 228.47 0.854 0.109 0.736 0.845 20.63 0.783 228.47 0.851 0.109 0.734 0.842 20.67 0.782 228.47 0.849 0.109 0.731 0.840 20.70 0.781 228.47 0.846 0.109 0.728 0.837 20.73 0.780 228.47 0.844 0.109 0.726 0.835 20.77 0.779 228.47 0.841 0.109 0.723 0.832 20.80 0.778 228.47 0.839 0.109 0.721 0.830 Continues on next page... 11 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 20.83 0.777 228.47 0.837 0.109 0.719 0.827 20.87 0.776 228.47 0.835 0.109 0.716 0.825 20.90 0.775 228.47 0.833 0.109 0.714 0.823 20.93 0.774 228.47 0.831 0.109 0.712 0.821 20.97 0.773 228.47 0.829 0.109 0.710 0.819 21.00 0.772 228.47 0.827 0.109 0.708 0.817 21.03 0.771 228.47 0.825 0.109 0.706 0.815 21.07 0.770 228.47 0.823 0.109 0.704 0.813 21.10 0.769 228.47 0.821 0.109 0.702 0.811 21.13 0.768 228.47 0.819 0.109 0.700 0.809 21.17 0.768 228.47 0.817 0.109 0.698 0.807 21.20 0.767 228.47 0.816 0.109 0.696 0.805 21.23 0.766 228.47 0.814 0.109 0.695 0.803 21.27 0.765 228.47 0.812 0.109 0.693 0.802 21.30 0.764 228.47 0.811 0.109 0.691 0.800 21.33 0.763 228.47 0.809 0.109 0.689 0.798 21.37 0.762 228.47 0.808 0.109 0.688 0.797 21.40 0.761 228.47 0.806 0.109 0.686 0.795 21.43 0.760 228.47 0.805 0.109 0.685 0.794 21.47 0.759 228.47 0.803 0.109 0.683 0.792 21.50 0.758 228.47 0.802 0.109 0.682 0.791 21.53 0.757 228.47 0.800 0.109 0.680 0.789 21.57 0.756 228.46 0.799 0.109 0.679 0.788 21.60 0.755 228.46 0.798 0.109 0.677 0.786 21.63 0.754 228.46 0.796 0.109 0.676 0.785 21.67 0.753 228.46 0.795 0.109 0.674 0.784 21.70 0.752 228.46 0.794 0.109 0.673 0.782 21.73 0.751 228.46 0.792 0.109 0.672 0.781 Continues on next page... 12 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 21.77 0.750 228.46 0.791 0.109 0.670 0.779 21.80 0.749 228.46 0.790 0.109 0.669 0.778 21.83 0.748 228.46 0.788 0.109 0.668 0.777 21.87 0.748 228.46 0.787 0.109 0.666 0.776 21.90 0.747 228.46 0.786 0.109 0.665 0.774 21.93 0.746 228.46 0.785 0.109 0.664 0.773 21.97 0.745 228.46 0.784 0.109 0.663 0.772 22.00 0.744 228.46 0.782 0.109 0.661 0.771 22.03 0.743 228.46 0.781 0.109 0.660 0.769 22.07 0.742 228.46 0.780 0.109 0.659 0.768 22.10 0.741 228.46 0.779 0.109 0.658 0.767 22.13 0.740 228.46 0.778 0.109 0.657 0.766 22.17 0.739 228.46 0.777 0.109 0.655 0.765 22.20 0.738 228.46 0.776 0.109 0.654 0.763 22.23 0.737 228.46 0.774 0.109 0.653 0.762 22.27 0.736 228.46 0.773 0.109 0.652 0.761 22.30 0.735 228.46 0.772 0.109 0.651 0.760 22.33 0.734 228.46 0.771 0.109 0.650 0.759 22.37 0.733 228.46 0.770 0.109 0.649 0.758 22.40 0.732 228.46 0.769 0.109 0.647 0.757 22.43 0.731 228.46 0.768 0.109 0.646 0.755 22.47 0.730 228.46 0.767 0.109 0.645 0.754 22.50 0.729 228.46 0.766 0.109 0.644 0.753 22.53 0.728 228.46 0.765 0.109 0.643 0.752 22.57 0.727 228.46 0.764 0.109 0.642 0.751 22.60 0.726 228.46 0.763 0.109 0.641 0.750 22.63 0.725 228.46 0.762 0.109 0.640 0.749 22.67 0.725 228.46 0.761 0.109 0.639 0.748 Continues on next page... 13 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 22.70 0.724 228.46 0.760 0.109 0.638 0.747 22.73 0.723 228.46 0.759 0.109 0.637 0.746 22.77 0.722 228.46 0.758 0.109 0.635 0.745 22.80 0.721 228.46 0.757 0.109 0.634 0.744 22.83 0.720 228.46 0.756 0.109 0.633 0.743 22.87 0.719 228.46 0.755 0.109 0.632 0.742 22.90 0.718 228.46 0.754 0.109 0.631 0.741 22.93 0.717 228.46 0.753 0.109 0.630 0.739 22.97 0.716 228.46 0.752 0.109 0.629 0.738 23.00 0.715 228.46 0.751 0.109 0.628 0.737 23.03 0.714 228.46 0.750 0.109 0.627 0.736 23.07 0.713 228.46 0.749 0.109 0.626 0.735 23.10 0.712 228.46 0.748 0.109 0.625 0.734 23.13 0.711 228.46 0.747 0.109 0.624 0.733 23.17 0.710 228.46 0.746 0.109 0.623 0.732 23.20 0.709 228.46 0.745 0.109 0.622 0.731 23.23 0.708 228.46 0.744 0.109 0.621 0.730 23.27 0.707 228.46 0.743 0.109 0.620 0.729 23.30 0.706 228.46 0.742 0.109 0.619 0.728 23.33 0.705 228.46 0.741 0.109 0.618 0.727 23.37 0.704 228.45 0.740 0.109 0.617 0.726 23.40 0.703 228.45 0.739 0.109 0.616 0.725 23.43 0.702 228.45 0.738 0.109 0.615 0.724 23.47 0.701 228.45 0.737 0.109 0.614 0.723 23.50 0.700 228.45 0.736 0.109 0.613 0.722 23.53 0.699 228.45 0.735 0.109 0.612 0.721 23.57 0.698 228.45 0.734 0.109 0.611 0.720 23.60 0.697 228.45 0.733 0.109 0.610 0.719 Continues on next page... 14 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 23.63 0.696 228.45 0.732 0.109 0.609 0.718 23.67 0.695 228.45 0.731 0.109 0.608 0.717 23.70 0.694 228.45 0.730 0.109 0.607 0.716 23.73 0.693 228.45 0.729 0.109 0.606 0.715 23.77 0.692 228.45 0.728 0.109 0.605 0.714 23.80 0.692 228.45 0.727 0.109 0.604 0.713 23.83 0.691 228.45 0.726 0.109 0.603 0.712 23.87 0.690 228.45 0.725 0.109 0.602 0.711 23.90 0.689 228.45 0.724 0.109 0.601 0.710 23.93 0.688 228.45 0.724 0.109 0.600 0.709 23.97 0.687 228.45 0.723 0.109 0.599 0.708 24.00 0.686 228.45 0.722 0.109 0.598 0.707 24.03 0.548 228.45 0.718 0.109 0.594 0.703 24.07 0.274 228.45 0.705 0.109 0.581 0.690 24.10 0.091 228.45 0.683 0.110 0.558 0.668 24.13 0.000 228.44 0.657 0.110 0.530 0.640 24.17 0.000 228.44 0.633 0.110 0.506 0.616 24.20 0.000 228.43 0.612 0.110 0.485 0.595 24.23 0.000 228.43 0.591 0.110 0.464 0.574 24.27 0.000 228.42 0.571 0.110 0.444 0.554 24.30 0.000 228.42 0.552 0.110 0.425 0.535 24.33 0.000 228.42 0.533 0.110 0.406 0.517 24.37 0.000 228.41 0.515 0.111 0.388 0.499 24.40 0.000 228.41 0.498 0.111 0.371 0.482 24.43 0.000 228.40 0.481 0.111 0.354 0.465 24.47 0.000 228.40 0.465 0.111 0.338 0.449 24.50 0.000 228.40 0.449 0.111 0.322 0.433 24.53 0.000 228.40 0.434 0.111 0.307 0.418 Continues on next page... 15 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 24.57 0.000 228.39 0.420 0.111 0.293 0.404 24.60 0.000 228.39 0.406 0.111 0.279 0.390 24.63 0.000 228.39 0.392 0.111 0.265 0.377 24.67 0.000 228.38 0.379 0.111 0.252 0.364 24.70 0.000 228.38 0.366 0.111 0.239 0.351 24.73 0.000 228.38 0.354 0.112 0.227 0.339 24.77 0.000 228.38 0.342 0.112 0.215 0.327 24.80 0.000 228.37 0.331 0.112 0.204 0.316 24.83 0.000 228.37 0.320 0.112 0.193 0.305 24.87 0.000 228.37 0.310 0.112 0.184 0.295 24.90 0.000 228.37 0.304 0.112 0.178 0.290 24.93 0.000 228.37 0.299 0.112 0.172 0.284 24.97 0.000 228.36 0.293 0.112 0.167 0.279 25.00 0.000 228.36 0.287 0.112 0.162 0.274 25.03 0.000 228.36 0.282 0.112 0.156 0.268 25.07 0.000 228.36 0.277 0.112 0.151 0.263 25.10 0.000 228.36 0.271 0.112 0.146 0.258 25.13 0.000 228.35 0.266 0.112 0.141 0.253 25.17 0.000 228.35 0.261 0.112 0.136 0.248 25.20 0.000 228.35 0.256 0.112 0.132 0.244 25.23 0.000 228.35 0.251 0.112 0.127 0.239 25.27 0.000 228.35 0.246 0.112 0.122 0.235 25.30 0.000 228.34 0.242 0.112 0.118 0.230 25.33 0.000 228.34 0.237 0.112 0.113 0.226 25.37 0.000 228.34 0.233 0.112 0.109 0.221 25.40 0.000 228.34 0.228 0.112 0.105 0.217 25.43 0.000 228.34 0.224 0.112 0.101 0.213 25.47 0.000 228.34 0.220 0.112 0.097 0.209 Continues on next page... 16 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 25.50 0.000 228.34 0.215 0.112 0.093 0.205 25.53 0.000 228.33 0.211 0.112 0.089 0.201 25.57 0.000 228.33 0.207 0.112 0.085 0.197 25.60 0.000 228.33 0.203 0.112 0.081 0.193 25.63 0.000 228.33 0.199 0.112 0.077 0.190 25.67 0.000 228.33 0.196 0.113 0.074 0.186 25.70 0.000 228.33 0.192 0.113 0.070 0.183 25.73 0.000 228.33 0.188 0.113 0.067 0.179 25.77 0.000 228.32 0.185 0.113 0.063 0.176 25.80 0.000 228.32 0.181 0.113 0.060 0.172 25.83 0.000 228.32 0.178 0.113 0.056 0.169 25.87 0.000 228.32 0.174 0.113 0.053 0.166 25.90 0.000 228.32 0.171 0.113 0.050 0.163 25.93 0.000 228.32 0.168 0.113 0.047 0.160 25.97 0.000 228.32 0.165 0.113 0.044 0.157 26.00 0.000 228.32 0.161 0.113 0.041 0.154 26.03 0.000 228.31 0.158 0.113 0.038 0.151 26.07 0.000 228.31 0.155 0.113 0.035 0.148 ...End 4/2/24, 10:24 AM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SPILLWAY ANALYSIS >>>Grass Spillway Name Grass Spillway Discharge 14.67 Peak Flow Period 1 Channel Slope 0.33 Channel Bottom Width 10 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 14.67 cfs 9.3 ft/s 0.16 ft 0.026 8.5 lbs/ft2 3.2 lbs/ft2 2.65 STABLE F P300 Unvegetated Underlying Straight 14.67 cfs 9.3 ft/s 0.16 ft 0.026 5.68 lbs/ft2 3.11 lbs/ft2 1.82 STABLE F Substrate Shoremax w/ Straight 14.67 cfs 8.69 ft/s 0.17 ft 0.029 14 lbs/ft2 3.41 Ibs/ft2 4.11 STABLE F P300 Reinforced Vegetation Underlying Straight 14.67 cfs 8.69 ft/s 0.17 ft 0.029 8.5 lbs/ft2 3.31 lbs/ft2 2.57 STABLE F Substrate https://ecmds.com/project/153509/spillway-analysis/262991/show 1/1 SPILLWAY FLOW LONG H B W SS CHANNEL LINING TOP OF EMBANKMENT SPILLWAY ELEVATION Q(100) SLOPE(%) ELEVATION GRASS STRAW WITH NET NAG 14.67 CFS 33.3% 0.5' 10.0' 13.0' 3:1 231.0 230.5 SPILLWAY SHOREMAX W/ P300 w EXTEND LINING TO EXTEND LINING TO TOP OF SPILLWAY TOP OF SPILLWAY TOP OF EMBANKMENT=231.0 ss H /CHANNEL LINING S SPILLWAY ELEVATION=230.5 MATTING SHALL BE AS NOTED OR APPROVED EQUAL B GRASS SPILLWAY DETAIL GRASS SOD ON SPILLWAY AND SIDE SLOPES 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 1.982 2 730 12,133 BMP Pre-Developed 2 SCS Runoff 10.51 2 718 21,806 BMP Post-Developed 3 Reservoir 0.107 2 1442 20,352 2 228.18 17,509 Post Through Pond 5 SCS Runoff 0.026 2 360 71 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 227.00 70.7 1.0-in Storm Thru Pond Wet Pond(Turnberry).gpw Return Period: 1 Year Tuesday, 04/2/2024 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 1.982 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 12,133 cuft Drainage area = 9.270 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 21.80 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 2.00 - 2.00 1.00 - 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 10.51 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 21,806 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 12.00 - 12.00 10.00 - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 4.00 2.00 2.00 0.00 - 1 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.107 cfs Storm frequency = 1 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 20,352 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 228.18 ft Reservoir name = BMP Pond Max. Storage = 17,509 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 12.00 - 12.00 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 17,509 cuft Pond Report 5 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation=227.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 227.00 13,600 0 0 0.50 227.50 14,740 7,085 7,085 1.00 228.00 15,450 7,548 14,633 1.30 228.30 15,880 4,700 19,332 2.00 229.00 16,890 11,470 30,802 3.00 230.00 18,310 17,600 48,402 4.00 231.00 19,610 18,960 67,362 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 2.00 0.00 0.00 Crest Len(ft) = 3.00 13.00 10.00 0.00 Span(in) = 18.00 2.00 0.00 0.00 Crest El.(ft) = 228.30 229.00 230.50 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 227.00 227.00 0.00 0.00 Weir Type = Rect Broad Ciplti --- Length(ft) = 37.00 0.50 0.00 0.00 Multi-Stage = Yes Yes Yes No Slope(%) = 0.80 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:CulverUOrifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 4.00 231.00 3.00 230.00 2.00 - 229.00 1.00 228.00 0.00 227.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 Total Q Discharge(cfs) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.026 cfs Storm frequency = 1 yrs Time to peak = 360 min Time interval = 2 min Hyd. volume = 71 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — 0.00 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 227.00 ft Reservoir name = BMP Pond Max. Storage = 71 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 60 120 180 240 300 360 420 Time (min) Hyd No. 6 Hyd No. 5 111111111 Total storage used = 71 cuft Pond Report 8 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation=227.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 227.00 13,600 0 0 0.50 227.50 14,740 7,085 7,085 1.00 228.00 15,450 7,548 14,633 1.30 228.30 15,880 4,700 19,332 2.00 229.00 16,890 11,470 30,802 3.00 230.00 18,310 17,600 48,402 4.00 231.00 19,610 18,960 67,362 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 2.00 0.00 0.00 Crest Len(ft) = 3.00 13.00 10.00 0.00 Span(in) = 18.00 2.00 0.00 0.00 Crest El.(ft) = 228.30 229.00 230.50 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 227.00 227.00 0.00 0.00 Weir Type = Rect Broad Ciplti --- Length(ft) = 37.00 0.50 0.00 0.00 Multi-Stage = Yes Yes Yes No Slope(%) = 0.80 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:CulverUOrifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 4.00 231.00 3.00 230.00 2.00 - 229.00 1.00 228.00 0.00 227.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 Total Q Discharge(cfs) 9 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 4.496 2 730 21,227 BMP Pre-Developed 2 SCS Runoff 16.63 2 718 33,552 BMP Post-Developed 3 Reservoir 0.488 2 930 31,703 2 228.41 21,130 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 227.00 0.000 1.0-in Storm Thru Pond Wet Pond(Turnberry).gpw Return Period: 2 Year Tuesday, 04/2/2024 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 4.496 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 21,227 cuft Drainage area = 9.270 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 21.80 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 16.63 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 33,552 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 18.00 - 18.00 15.00 15.00 12.00 12.00 9.00 • 9.00 6.00 6.00 3.00 3.00 0.00 — L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.488 cfs Storm frequency = 2 yrs Time to peak = 930 min Time interval = 2 min Hyd. volume = 31,703 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 228.41 ft Reservoir name = BMP Pond Max. Storage = 21,130 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 18.00 - 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 _ _ _ _ 0.00 — 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 I I Total storage used = 21,130 cuft 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 227.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I I Total storage used = 0 cuft 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 14.44 2 728 54,129 BMP Pre-Developed 2 SCS Runoff 35.92 2 718 72,021 BMP Post-Developed 3 Reservoir 5.460 2 728 70,114 2 229.00 30,750 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 227.00 0.000 1.0-in Storm Thru Pond Wet Pond(Turnberry).gpw Return Period: 10 Year Tuesday, 04/2/2024 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 14.44 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 54,129 cuft Drainage area = 9.270 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 21.80 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 15.00 15.00 12.00 — • 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 \— 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 35.92 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 72,021 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 , 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 2 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 5.460 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 70,114 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 229.00 ft Reservoir name = BMP Pond Max. Storage = 30,750 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 Time (min) — Hyd No. 3 Hyd No. 2 1111111 I Total storage used = 30,750 cuft 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 227.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I I Total storage used = 0 cuft 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 34.76 2 728 122,197 BMP Pre-Developed 2 SCS Runoff 71.38 2 716 144,756 BMP Post-Developed 3 Reservoir 14.67 2 726 142,807 2 230.75 62,582 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 BMP Post-Developed 6 Reservoir 0.000 2 n/a 0 5 227.00 0.000 1.0-in Storm Thru Pond Wet Pond(Turnberry).gpw Return Period: 100 Year Tuesday, 04/2/2024 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 34.76 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 122,197 cuft Drainage area = 9.270 ac Curve number = 60.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 21.80 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 • 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 71.38 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 144,756 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 14.67 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 142,807 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 230.75 ft Reservoir name = BMP Pond Max. Storage = 62,582 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 80.00 1 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 11 10.00 I _ 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 62,582 cuft 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 9.270 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,04/2/2024 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 227.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I I Total storage used = 0 cuft TIME OF CONCENTRATION Existing Conditions DA SCS Methodology OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT 1 SEGMENT 1 Manning's Equation: Tc=(0.007(nL)^0.8)/(P2^0.5)(s^0.4) 2-year/24-hr Tc=L/60 V V=1.49R°S'/n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's Te, Length Elev2 Elev3 Slope Condition Vavg Tu Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V T3 Troruv Tc(minimum) Tlag Basin (ft) (ft/ft) TP-40(in) n (min) ft ftttt TR-55 Fi.3-1 ft/sec min Flow Area ft^2 ft ft ft ft/ft s rrT n (min) (10 min) 0.6'Tc(hrs) 1 100 256.1 255.2 0.009 3.68 0.24 18.31 670 255.2 228 0.04060 Unpaved 3.20 3.49 21.80 21.80 0.22 1 WM20231:31 PM GM-PTRO\pmjeMPTIMECONC Tumberry.xls EROSION CONTROL CALCS (RIP-RAP CALCULATIONS) Project Information Project Name: Turnberry South-Phase 1 Project#: Designed by: CP Date: 7/13/2023 Revised by: CB Date: 12/12/2023 Checked by: Date: Rip-Rap Apron SCM-1 Pipe Diameter d= 18 Pipe Slope s= 0.8 % Manning's number n= 0.013 Flow Q= 5.46 cfs Velocity V= 5.54 ft/s Dissipator Dimensions* Zone= 1 Stone Filling Class= A Entry Width(2 X Do)= 3.0 ft Length(4 X Do)= 6.0 ft Width(La+Do)= 7.5 ft Min.Thickness= 12 inches Min.Stone Diameter= 3 inches 1 6.0 *All units are in feet **Dissipator pad designed for full flow of pipe 3.0 7.5 *All units are in feet **Dissipator pad designed for full flow of pipe RIP-RAP.xls 4/1/2024 Page 1 of 1 WATER QUALITY/QUANTITY BIORETENTION POND SCM 2 9I11/90 it/ j'1111`s<\ I I l S UI /(I I IIr11ly/ C( )' /%/!/1,_✓� ll(\ l )L✓ Ic\ i\w\`vl\I I�/�i/Ilj v, ,,,,./ . / I a �II 111 Ill �� rl �` l <�(� N U1111111j11 III (z�_ I I )1 ,' �/ar 41 ��11 III�I117II1J 1\�� / V AVA �11111 {( I >Il /) Jl \ I �� to z 1 ti L )/� 91 III I111\VAI£�1V\11�Al�t V��A \VA \ I� �)� c I n VA AVA�IIAl IIII ll�l��`y�^1° ��-��^V1AAi (( \A�(%/ (�� � �� i /_ ----� -1_-.„'' 1 •-%_d `y v 1 t r V\� VAAV��� ��v�VA V AV 1l ,. AA �� o lA�\VAV1QI��l\��� ��/�I ) I ) l l r�i� � ., f A \ ( I v 11 C �VAAIt i /( I �� I-r.,��� ' t l / J s ` \ V 1� �l V`\�V \ AAA � I 4 3' �J AV I (II II��V\(� ��\� .�-i% l� l V11 IIII / /.> v —� �. l A 1 I c ( �� e I ��� ,� 1 a ) , l y�11 vv\ y �� vv\� ' A 9�`,t /�/%1 1I I / �(i/� -)9 ��— I.9�' vzv / `ll 5 � , � 1Tr i- _� (CI ` � ���Av� 1�\ --"-', ���i � AA\ I I / A\ i � II(� � �� IIL- I I \ � ��A-�� 11 � Lro � 7 `� SV�>,.---��--,\ � �r-�` '' �< <y S ! // 1 I�l V AA ��-// -7 1 1 I 1AA�` `.\ 1 5 `� � ✓ 1� I"' VA�A�� 1\l \ ''N�� � Ai/ / j J0 �1 \� �t1��VA�111%%%��Ilt�/ (�I11 IIII 1\V1�121 � �;�a��VA�c/A�VI� /1� �� 1 < �c \ �� ����� VAS AV\v\V AA VA�V � hVA�V A (!/ �/ ( II_,�-„A//I = j,lI _// II '' !✓1 �sl ��y,�„ ,, �,r ,A\ ( 9A 11 z z z �9, � �. j v1 \ /�\�\1 1 I 1 I9 \ /VAAV)1�111111111�! lI j 111�1f11I)(I IIVI V III}I( 11 1 1. r 1Ill,llll ) V HP -,\�\11�111(l,l '—"\y-, „.-- -:—,2/�� ,�,•✓JI(r1�11 �)- ,. -������� \ ) ��e J rt�;x-ei, �", v �� ' 7 /1�� HIIi)yW, `0 ,1 �0 111111i11,, (^AVA; AI//� � �j�/i/�%7,t_ - �)// )( r,,"` 911.1 9',/ ',s," �fll C' IrO \ 1✓� A���.��� ���� �: cear iik ( f�1�r � i� �l ���� 1� - 11 -✓////�,��tiin a _ i--- �r� z% ��l 1A��AV� IA ��A� / ✓ 711E OFCONCEN7RA710N �; ho o ��: I�v /j/ 1VAA- � > 1 �� ll ///552-��� ����� �.�`�� / a// \ I VI 1 / VA 1 h v �V / ,,/'-- t :�z/1 -'.. lip < �1 / �rl / / v� � _ Ft01Y PATH d 5v� A' � v�� ���v�` ���•�� �' V �i` 1 / Y�� �� 11✓� r`'/1 �1111�,>>1v � / I /f1r ,,\_. w lir���A�� �� �// r z?d . �� A, L I o III AAVAA �1��✓ sa�> Ji< ,.(�A , \V�\VAA ( , � z�' I � �� I 1Ij,l' `� 11 �` t v e /< `�, (• > ,l \ v F, // i `� - -L e �11� ' > > 1 ✓ f fl !I C AV � � --� � f e , r ( / t i I � � e ( >e 1 � � I � CCI - i� N�11111VA \ \1 l��\/C1 ����VAti �AA\ A��yl� �� _ I \\ �/< )1Al Ile 11 II7�11 1 l of ( / U l / 1A\ Oslo �A �VJ- >1V�\vA�V ` \�°` V ,*z � {� v _ l N / A�- s�A 1 1-v �`'h l �A 1 �V �� / / )(CC� VA �� °- )l `.� �-- J III V - � ',.\ J r \ /r' — 1 ((//�I 11 1 l (1 v A V v I I l w l A\ �lAr IG� r V1A1�1/III Illl1�11\ A 1 1 Z°(� VV(lQ� ��� �1\V �_� ,, _,,,,„_,--\, '�111\Vl - 1� 1 Il �`AVA V 1A \Z ,?"��It, l l �� /,z ��� j / 1}�Ii�Ic 11W vVvvvvVA1 )vvv v> / )(a. „1V w�h AvAlA V Al c�1 v 1 1VV / 1 I I ( ) 1 \ 1A ,\1 , 1 �1 A )v ! °1�_ - VAIN 1111\))VAAt��l,lA��,� _ �yfpt t, �\, 1zEV A �_I vzr/ , I ���,/ v�0w� r 1 Q o� � � 1 � � 1II )/ F . I /l1)/ // /i //of 1\\�'', • ', -` \1v1(\III ow � 1 ) 1 POST-DEVELOPED J �,Jf, / =; r, . DRAINAGE AREA �,,/< 1 v ,, o a 11`I`Ill V ✓�JIIl11 II\IIII( _�' sTV1/v II CI\) \\ l \�111 II /ice / l// ( / Uf /��� I t i(i�i oo,e„eA ( \ A ( e a E 1 p ll I 1 /�r)�/� f _ � �` >a V A j �'° 1 1 1 ) A l / 1 3 d E \ 11A t _-' -/ / 1 --�/��/l///il/ / S V A51 ,- > 1(1 1 )I( , I\ sl 1 v t m m l 1A��� r C // ( ✓ / J 41 1 \ _ I l A 1 l c .• WAN (lVc !✓ 1 ✓ i -�,ry( /v I II AN l I 1 1I14)I f r.7 B %)/(4 //I d i 11/� 1 v \\\ \ V ./ri< rl✓ / / ` � ` �. \,c_11,\\\ /}/7- _y2/r-> 2.,_//,./s)////> AV AA �� j e �n I V , S Q z I iiir ) )\) )J))) 7/ / V IC: w 57t, \N / z 2 k, 4 WL,k \ G9 269 PC MB / 1I 1 1 1 1 l > 1-\\_,?_,, 1 iv.oas,slat'?'°''s,''''':'�wM. °Pti a ¢ [� o 0. (( \ (_\ I\ __ _ 4Nk.„,... a. "„ear bi _�:(1(,. --\ 1, 23.--2'. c ' 0 Lit \\ \ �t9 A G i I Gc uJ 1 I -- \ \\\\\ 2)-')11111k‘ ,,, '''-- of)/ ))/ 1 \.,,, \ ) _ r,,)6 yl.'Z''';'?;1„,07„,,,,,..1‘ ,g,.. \I N\ 5, __,_2 ) 1'lt.\\\ 111,10,1 I L „.,),>;1\ * ',)::: .,),,),‘,,,.,,,s ,),.0:), ,.4)101(4;A>):.104t,, , ,4 1:: ik 1,--..a...7.. / !.... ,g..,: g. . - CC �iLc ���'� e • miv_ v .t M �o Re• S ti , i � f'a�cSsia..4. \\ c'''\''‘\1's,‘,1.t.s.,:\ts.\\.\\S:: �� o�Mac".9 _ ►s/� -_' ��� r✓ -`�I �I "I 16 /, n55,,, :' t‘-\\_vp.,>,7: r \ 11 / � / I � l ��\ \. �/ , u of . � >s �r�. ,,-\\7 „)ji /( //i/;-:__,---:,. r . . 1 b., ,4„,.. oic,-,,,17~.:\x , „ ,„ \.\,, ,,,,_.es ,‘, „„,1 ,, , \\VN li \b -\\\)\-w))6)!II POST-DEVELOPED DRAINAGE AREA f s., rw/ .`--5 s25F T N \ ei , li . n,,,// � � �� 'DIE OF CONCEN7RA11011�. � - �� -t � ��, 1 SCM#2 7.55 AC (ON SITE) ` °`' FlOW PATM - 'Ir PLAN STATUS �� ' c, r `� °P»>Ss�c��' � w�\` 07/13/23 INITIAL SUBMISSION 4 ��� III... r\\\\\\irl\I4ilii�':7�, '�.I`/;ii= /�� ` ., As. case..` .,�...01 a� �0�os\ •�' cs`q,�l ` `"��N-, of os , �,'.` , POST DEVELOPED DRAINAGE AREA U Pri -, --- „ ......-.-,...1.1,,..... �� � I SCM#2 14.15 AC OVERALL) __ � ,5o � �� ` r�a,.. i, DATE OESGRIPTION ✓� '� )1 (INCLUDING FUTURE PHASE) 1 , ' ‘1.°- , 1( \� (� �� c III Igo �,v��; _ cB Ce cEP / v��'�� // v'°� __, � - 1r e v v se v N_� �" '�Saq DESIGN DRANM CHKD _ I, s' � ,n�z v L �,o / „%_1` a SCALE H: I e 1 4. �s3' GRAPHIC SCALE Joe No. 220164-01-007 �1111 � aasss Ity �i. �`.4 — a // I I I l 1 )) �/ �� `VA., ' �e- I�� �_ �_ ,.‘� c,� e��s '�� ��e� �eN o°Nj ," o Aso �� .';,',Z----, --;--a.::4 i 1. � � ° %� .'�,, Na`�,,��s�� � DATE JULY 13, 2023 ..‘ ) )//t1;<7 h ., I\ ,, ;--,„.,,s\ „ 1 )))7//»fd/ /- ,,/�� I�' ° es 1� �� �� J •;/h �n( N eeEz) ni _ 1 t lil �� r nKig,,,gillitip\-.11'1'.. ( e �y�,.�'/�../Alb, '`� ) / : 1inch— 30 1t, �_ _ �, � SHEET �U, Cad fie none:\G r 64-Stanegate\220164-0I-007(ENG)-Tumberry South-Raeford NC\Engineerng\Engineerng Plans\Construction Drawings\220164-01-067-O(P_CPAeg SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Turnbeny South Phase 1 2 ;Project Area(ac) 18.926 3 Coastal Wetland Area(ac) - 4 Surface Water Area(ac) 5 Is this project High or Low Density? _ High — 6 ;Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) L._ h of vegetated setbacks provided(feet) 30 he vegetated setback remain vegetated? Yes A is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/Aeambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 1 13 Wet Pond 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo,PE 28 Organization: Bowman North Carolina, Ltd. 29 Street address: 4006 Barrett Drive,Suite 104 30 City,State,Zip: Raleigh,NC 27609 31 Phone number(s): 919-553-6570 _ 32 Email: cpardo@bowman.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer • Signature of Designer SEAL 051571 • • ,,�• • FNci..0. . . 'o afar i����qt°I fEsA\O\\\ Date DRAINAGE AREAS 1 'Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM - Wet Pond BioRetention 5 Total drainage area(sq ft) 824106 sf 403800 616411 6 Onsite drainage area(sq ft) 824106 sf 403800 328663 7 Offsite drainage area(sq ft) 287748 8 Total BUA in project(sq ft) 328773 sf 208172 sf 266449 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) 216000 sf 120000 sf 96000 sf New BUA not on subdivided lots(subject to _10 permitting)(sf) 112773 sf 88172 sf 24601 sf 11 Offsite BUA(sq ft) 145848 sf 12 j Breakdown of new BUA not on subdivided lots: -Parking(sq ft) -Sidewalk(sq ft) 22692 sf 17159 sf 5533 sf = -Roof(sq ft) -Roadway(sq ft) 90081 sf 71013 sf 19068 sf _ -Future(sq ft) -Other,please specify in the comment box 1 below(sq ft) !New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) _ 18 Percent BUA 39.89% 51.6% 43.2% 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) 19332 cf 26625 cf 21 Calculation method for design volume t Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): ____ Drainage Area 2's offsite area is on Parcel 494550301299.The offsite BUA ,. will include 88,000 sf on 22 lots,and 57,848 sf of roadways and sidewalks. I BIORETENTION CELL 1 Drainage area number 2 2 Minimum required treatment volume(cu ft) 22552 cf ,GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? Are the inlets,outlets,and receiving stream protected from erosion 7 (10-year storm)? Yes Is there an overflow or bypass for inflow volume in excess of the 8 ,design volume? Yes 9 What is the method for dewateringthe SCM for maintenance? i Pump p(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 ,If the SCM is on a single family lot,does(will?)the plat comply with N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? i Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? ( Yes BIORETENTION CELL MDC FROM 02H.1052 18 SHWT elevation(fmsl) 205.00 19 Bottom of the bioretention cell(fmsl) 220.00 20 Pending depth of the design storm(inches) 7 in 21 Surface area of the bioretention cell(square feet) 43600 sf 22 Design volume of SCM(cu ft) _ 26625 cf 23 Is the bioretention cell used for peak attenuation? Yes 24 Depth of peak attenuation over planting surface(in) 29.16 in 25 Height of peak attenuation outlet above the planting surface(in) 29.16 in 26 Infiltration rate of the in situ soil(inch/hour) 2 in/hr 27 Diameter of the underdrain pipes(if applicable) 4 in 28 'Does the design include Internal Water Storage(IWS)? Yes 29 if so,elevation of the top of the IWS(fmsl) 218.5 30 Elevation of the planting surface(fmsl) 220.00 31 What type of vegetation will be planted? (grass,trees/shrubs, other)? Grass _ 32 M dia depth(inches) i; 30 in 33 'Percentage of medium to coarse washed sand by volume 75-85% 34 Percentage of fines(silt and clay)by volume 8-10% 35 Percentage of organic matter by volume 5-10% 36 Type of organic material ! Pine Bark Fines 37 Phosphorus Index(P-Index)of media(unitless) 30 38 Will compaction be avoided during construction? _ j Yes 39 Will cell be maintained to a one inch/hour standard? Yes 40 ;Depth of mulch,if applicable(inches) 41 Type of mulch,if applicable Is 42 How many clean out pipes are being installed? 47 43 Type of pretreatment that will be used: Rip-Rap ADDITIONAL INFORMATION Please use this space to provide any additional information about the 44 Ibioretention cell(s): Bioretention 1 10:36 AM 4/2/2024 Bowman North Carolina, Ltd. Turnberry South, Hoke County, NC Curve Number Calculation (CN) Pre-Developed Conditions(Bio-Retention Pond #2) Drainage Area(acres): 14.15 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A NoB/WaB Norfolk/Wagram Loamy Sand 9.83 69% B GoA Goldsboro Loamy Sand 2.03 14% C BaD Blaney Loamy Sand 2.29 16% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Wooded -Good Stand A 9.83 50 34.7 Wooded -Good Stand B 2.03 63 9.0 Wooded -Good Stand C 2.29 73 11.8 Cumulative Curve#= 55.6 Bowman North Carolina, Ltd. Turnberry South, Hoke County, NC Curve Number Calculation (CN) Post-Developed Conditions(Bio-Retention Pond #2) Drainage Area(acres): 14.15 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A NoB/WaB Norfolk/Wagram Loamy Sand 9.83 69% B GoA Goldsboro Loamy Sand 2.03 14% C BaD Blaney Loamy Sand 2.29 16% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good Condition A 4.91 55 19.1 Open Space-Good Condition B 0.93 68 4.5 Open Space-Good Condition C 2.20 77 12.0 Impervious Area 6.12 98 42.4 Cumulative Curve#= 77.9 Bio-Retention Design Site Information Sub Area Location: Drainage To Bio-Retention Area#2 Drainage Area(DA)= 14.15 Acres 616411 sf Impervious Area(IA)= 6.12 Acres 266449 sf Percent Impervious(I)= 43.23 % Required Water Quality Volume Design Storm= 1 inch Determine Rv Value= 0.05+.009(I)= 0.44 in/in Water Quality Volume= 0.518 ac-ft Water Quality Volume= 22,552 cf Water Quality Volume= 0.439 inches of runoff NOAA 1-year,24-hour event= 3.04 inches Discharge for Ponded Area Maximum Ponding Depth= 12 in Filter Bed Surface Area Used= 43,600 sf Top of Filter Media Elevation= 220.0 Media Infiltration Rate= 2.00 in/hr Media Infiltration Time= 6.0 hr Discharge for Bioretention Filter Media Filter Bed Depth= 3 ft Maximum Ponding Depth= 12 in Filter Bed Surface Area Used= 43600 sf Top of Filter Media Elevation= 220.0 Media Infiltration Rate= 2.00 in/hr Media Infiltration Time= 18.0 hr Size Underdrain System Water Quality Volume= 0.518 ac-ft Water Quality Volume= 26,625 cf Drawdown= 0.154 cfs Underdrain Pipe Size= 4 in Number of Pipe Rows= 10 10ft on center(typ) Avg.Length of Pipe Row= 111 If Number of Perforations= 8,800 50%of Perforations= 4,400 Capacity of one perforation= 0.0069 cfs Total Capacity= 30.40 Is Total Capacity>Drawdown? Yes Underdrain pipe capacity Slope= 0.5 % Underdrain Area= 0.0873 sf Underdrain Perimeter= 1.0470 If Capacity of pipe= 1.34 cfs Capacity of pipe(50%clogged)= 0.67 cfs Is Total Capacity>Drawdown? Yes i ) 8 \ �1\\ v� � - �� - \_,_4 , \ \ 1) 4 \ \\\...-- \ \ \ '''' i\ \'''' _ 0 ,__ ,....\ STORMWATER \\�\ �� , ` \ 0 I ' i l MANAGEMENT L\v, I�� \` \�� ,IC 9b \\ \ • \� `� i EASEMENT N'010" GRASS I \ \\ �fj�►I���// w \\ \ SPILLWAY \ \ ►1•��`4 \ \ \ \ , -- 3: L. \ *� i ��� 4"UNDERDRAIN(TYP) /- 16�;1 '-\ FES INV= ,\A 215.5 \ \ ` ` illo. Owloit \ \ ,\..., n 9 ‘‘‘‘ , \ .. ertAN'c\ A A, --- / `� I� \ \ \I. REFER TO SOD 1 \ :'t�� - ''�•�� \ REQUIREMENTS FOR, -, ) \ \ \ ‘ \\ li " cr) v _ o �� , 11.•���� �\ \ \\ POND AREA �\ \ \ Y ' \\\. ��� L \� �' ;ice \ \ \ \ \ ` RIP RAP DISSIPATER PAD \\'- \ ��� \ \ \ \ \ ,. , \ \\ \\\ \ -%\ , ' ' \ `LENGTH=,2.0' \ \ �� \ \ \ \ \ `\ \\ / \ 6 �` \ talk_k vn1 THICKNESS=22" \;\ \ � \ \\ \ � \\ �' \(,\/,I�" �� � \ RIP RAP CLASS=B\\ \ \\ , \ \ \ \ \ \ \ \�S \ ' \ \ \ \ 7D \ \' \ \ \ s >: _,e_:: \\ ‘ \\\\\ \\\\ O lc,S :— \ \\\ \\ \\ \ \\ \ \\ \ \ \\\� \\ \\ \LEA TYP /' / ' /� ` \ \ 24" HDPE®4.769\ \ \ \ \ \ \ `\ k‘i: OUTLET PIPE \ \ \ \ \ TORMWATER Q\ REFER TO DETAILS \ \ \ \ \ \ \ ` \ ` MANAGEMENT' J�C-\/,`,/ \ ON THIS SHEET, \ \ \ \ \\ \ \ ) �� EASEMENT ` c ok� i / \� \� \ \ \ \ \ \ \ \ \ \ \ \ \ \ " �� LTG / OUTLET CONTROL \\\\\.. \ \ \ \\ \ \ \\ \ \_� ' , STRUCTURE REFER T \ \ \ \ \ \ 1 \ \ \ i \��—�\ tti TO DETAILS ON \ \ \ \ \ \ , /� THIS SHEET \ ( \ \ \ \ \ \ V A \\ \ A '►�j _ ` / / / \ \ * \ \ \ \ \ s A --i______,\ ,\ /\ , ___,________ __ , , , "IP �� // TOP OF /\ :' > \\ \ p % 111 INLET PIPE WITH- ' / EMBANKMENT / \/ 114 ,,`, -� � r � \\ T' \ ■ I RIP-RAP-APRON ELEV=223.0 /\ \ �I / ___--;,-----, \______ ' // <\ Oput //� �ti ,\ \ 11 /_-_ � � �1� // /7 /7 . J/\ / / �\ \ \ '�� \ \ / Iv `‘ /.' \ \ \ ��> ,���-i RIP RAP DISSIPATER PAD / STORMWATER / \ \ �� i ' LENGTH=9.0' / MANAGEMENTEASEMENT / \\\ ` �i� >;\ i` THICKNESS=24" \ / / /// \ �` �\ ' /C /T - 1 RIP RAP CLASS=1 1 \\ I \ ---- / I. >-"" ___----3 I i/ /// __'J / �''/ l \ \�\ \, 1, \ \ 1 rI i GRAPHIC SCALE '/// / / / ( ' / // 30 J 15V3D 0 60 120 - 141 PLAN VIEW ( IN FEET ) 1 inch= 30 ft. J cSTORMWATER MANAGEMENT DESIGN BIORETENTION POND: RIVER BASIN: CAPE FEAR RECEIVING STREAM: BEAVER CREEK STREAM INDEX: 18-31-19-5 STREAM CLASS: C HUC: 0303000406 PROJECT COORDINATES: 35.009339°N, -79.160924°W POND DESIGN SUMMARY DRAINAGE AREA TO POND: 14.15 ACRES SITE IMPERVIOUS AREA TO POND: 6.12 ACRES OFF-SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 6.12 ACRES PRE-DEVELOPED POST-DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 14.15 AC 14.15 AC CURVE NUMBER: 55.6 77.9 TIME OF CONCENTRATION: 29.6 MIN 5 MIN 1.0" STORM EVENT: 0.236 CFS 0.000 CFS 1-YEAR STORM EVENT: 0.992 CFS 27.72 CFS 0.000 CFS 2-YEAR STORM EVENT: 3.085 CFS 39.02 CFS 1.495 CFS 10-YEAR STORM EVENT: 13.45 CFS 73.03 CFS 12.44 CFS 100-YEAR STORM EVENT: 37.55 CFS 130.69 CFS 37.03 CFS STAGE/STORAGE TABLE STAGE (FT) ELEVATION (FT) CONTOUR AREA INCREMENTAL TOTAL STORAGE (SF) STORAGE (CF) (CF) 0.0 220.0 43,600 0 0 0.6 220.6 45,150 26,625 26,625 (WQV) 1.0 221.0 46,190 18,268 44,893 2.0 222.0 48,840 47,515 92,408 3.0 223.0 51,540 50,190 142,598 EMBANKMENT BERMUDA SOD SLAB TOP WITH TOP OF EMBANKMENT=223.0 MANHOLE OUTLET OUTLET CONTROL RING FOR ACCESS STRUCTURE 100 YEAR STORM ELEVAT 0N=222.43 rarrrwrrrr rraFOR ACCESS aaaaaaaaaaraa araaaiaaala EMERGENCY SPILLWAY ELEVATION= 222.2 " w �q `t 6v EMERGENCY WEIR ELEVATION= 221.5 PRECAST OUTLET — j���j�p�p�� 10 YEAR STORM ELEVATION= 221.42 STRUCTURE �� �4j��j��♦j�` 2 YEAR STORM ELEVATION= 220.80 ��, WITH STEPS EMERGENCY P ���Q�O INTERMEDIATE WEIR ELEVATON(WQv)=220.6 fi�� v WEIR �!✓I�jN/�� ago BIO-RETENTION '�I,vim ✓I SOIL MIXTURE °°°° °gggeAg °g 1 YEAR STORM ELEVATION= 220.57 ♦�♦� UNDERDRAIN INV=217.5 ��• �i INTERMEDIATE �i♦i 1"STORM ELEVATION = 220.04 1"DESIGN STORM "VA,AGy y,,G WEIR ♦%� 24"HDPE WO VOLUME(FIRST FLUSH)`✓I I!I�I'•, + '°°°°°"°"°" OUTLET PIPE FILTER BED ELEVATION = 220.0 12"PONDING DEPTH �'�'**♦`,V\f 1 � GRAVEL LAYER 0111♦� a- *, SLAB THICKNESS PER REFER TO GRADING • O V** °°,°,epovoio gEgEggegegeDigi • AV MANUFACTURER UNDER-DRAW PLAN FOR OUTLET PIPE �V 2.5FT MINIMUM PIPE OUTLET PIPE BIORETENTION SOIL DEPTH ' (GRASS BASIN) SLAB TOP WITH NV=217.5 �� ° ♦♦ 90'ELBOWS ✓ -.:44.,.."-:0=g.:0:4 0:0a•:g MANHOLE RING IWS ELEVATION=218.5 F r7 0=0�0:0 =0:0 °°'`°°''''"°'°'°° r O FILL BOTTOM OF OUTLET '` ,� �""°''`°''''000:00 P OF STRUCTURE W9TH PIPE ♦ r , lR 2.5 FT CONCRETE FOR ��' 00 ::: : -223D 4, h0F� E� \5ANTI-FLOTATION We % D FT �PGN S\0 \R,2ti-224l , �MERGENCBOTTOM OF GRAVEL/UNDERDRAIN = 5 ' `� / IWS OUTLET CONTROL 12FT SEPARATION �< • • jR\ SEASONAL HIGH WA218.0 ER OTABLE=205.0 '♦'-•%*.e%�i�t. ^♦�.� 22D6 I -II IP" I (144 INCHES) REFER p AN FOR INVERT6 I D UNDeRDRA/N 'ELEVATIONS (#5M WASHED DRAIN GRAVEL BED STONE) NI ? S7j F 0 SECTION BIO-RETENTION CONTROL STRUCTURE SCALE: N.T.S. OUTLET CONTROL STRUCTURE 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday, 12/12/2023 Hyd. No. 3 Peak Flow Period Post Through Pond 738-720 = 18 min. - 1 hour Hydrograph type = Reservoir Peak discharge = 37.03 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 154,311 cuft Inflow hyd. No. = 2 - Post Developed tovoir name = Bio-Retention Max. Elevation = 222.43 ft Max. Storage = 114,020 cuft Storage Indication method used. Exfiltration extracted from Outflow. Hydrograph Discharge Table (Printed values>=1.00%ofQp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 702 33.50 220.75 18.52 0.963 2.108 0.963 704 40.37 220.84 18.52 1.920 2.119 1.920 706 47.85 220.94 18.52 3.308 2.131 3.308 708 58.09 221.06 18.52 5.220 2.146 5.219 710 73.24 221.20 18.52 7.820 2.163 7.820 712 92.40 221.38 18.52 11.55 2.185 11.55 714 114.30 221.60 18.59 16.70 0.936 2.212 17.63 716 130.69 << 221.85 25.13 19.11 6.011 2.243 25.12 718 127.17 222.10 27.73 17.32 10.41 2.274 27.73 720 100.24 222.30 28.88 16.68 12.19 2.013 2.298 30.89 722 63.19 222.41 29.43 16.44 12.99 6.248 2.312 35.67 724 34.85 222.43 << 29.55 16.39 13.15 7.482 2.315 37.03 726 21.66 222.41 29.43 16.44 12.99 6.242 2.312 35.67 728 17.83 222.36 29.23 16.53 12.70 4.584 2.307 33.81 730 17.08 222.32 29.02 16.62 12.39 2.952 2.301 31.96 732 16.38 222.28 28.81 16.72 12.08 1.722 2.296 30.52 734 15.67 222.24 28.59 16.83 11.76 0.902 2.291 29.49 736 14.96 222.20 28.38 16.94 11.44 0.098 2.287 28.48 738 14.24 222.17 28.15 17.08 11.07 2.282 28.15 740 13.52 222.13 27.90 17.22 10.68 2.277 27.90 Continues on next page... 11 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 742 12.79 222.09 27.63 17.38 10.25 2.272 27.63 744 12.07 222.05 27.32 17.58 9.746 2.267 27.32 746 11.34 222.00 27.00 17.78 9.225 2.261 27.00 748 10.61 221.96 26.53 18.17 8.361 2.256 26.53 750 9.874 221.91 26.04 18.57 7.460 2.250 26.03 752 9.197 221.86 25.34 18.99 6.347 2.245 25.34 754 8.689 221.82 24.59 19.41 5.177 2.239 24.59 756 8.372 221.77 23.62 19.48 4.138 2.233 23.62 758 8.169 221.73 22.54 19.32 3.217 2.228 22.54 760 8.005 221.69 21.45 18.96 2.395 2.223 21.35 762 7.840 221.65 20.23 18.00 1.775 2.218 19.77 764 7.675 221.62 19.12 17.12 1.210 2.214 18.33 766 7.509 221.59 18.52 16.34 0.790 2.210 17.13 768 7.343 221.56 18.52 15.64 0.528 2.207 16.17 770 7.177 221.53 18.52 14.98 0.285 2.204 15.27 772 7.010 221.51 18.52 14.37 0.057 2.201 14.43 774 6.843 221.48 18.52 13.82 2.198 13.82 776 6.675 221.46 18.52 13.29 2.195 13.29 778 6.508 221.44 18.52 12.79 2.192 12.79 780 6.339 221.42 18.52 12.31 2.190 12.31 782 6.179 221.40 18.52 11.85 2.187 11.85 784 6.043 221.38 18.52 11.42 2.185 11.42 786 5.932 221.36 18.52 11.02 2.182 11.02 788 5.837 221.34 18.52 10.63 2.180 10.63 790 5.748 221.32 18.52 10.26 2.178 10.26 792 5.657 221.31 18.52 9.900 2.176 9.900 794 5.567 221.29 18.52 9.569 2.174 9.569 796 5.477 221.28 18.52 9.261 2.172 9.261 Continues on next page... 12 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 798 5.386 221.26 18.52 8.963 2.170 8.963 800 5.296 221.25 18.52 8.676 2.169 8.676 802 5.205 221.23 18.52 8.399 2.167 8.399 804 5.115 221.22 18.52 8.131 2.165 8.131 806 5.024 221.21 18.52 7.872 2.164 7.872 808 4.933 221.19 18.52 7.630 2.162 7.630 810 4.842 221.18 18.52 7.406 2.161 7.406 812 4.753 221.17 18.52 7.188 2.159 7.188 814 4.673 221.16 18.52 6.977 2.158 6.977 816 4.601 221.15 18.52 6.771 2.157 6.771 818 4.534 221.14 18.52 6.572 2.155 6.572 820 4.469 221.13 18.52 6.379 2.154 6.379 822 4.404 221.12 18.52 6.192 2.153 6.192 824 4.339 221.11 18.52 6.010 2.152 6.010 826 4.274 221.10 18.52 5.839 2.150 5.839 828 4.209 221.09 18.52 5.684 2.149 5.684 830 4.144 221.08 18.52 5.533 2.148 5.533 832 4.078 221.07 18.52 5.385 2.147 5.385 834 4.013 221.06 18.52 5.240 2.146 5.240 836 3.948 221.05 18.52 5.099 2.145 5.099 838 3.882 221.04 18.52 4.961 2.144 4.961 840 3.816 221.04 18.52 4.827 2.143 4.827 842 3.755 221.03 18.52 4.695 2.142 4.695 844 3.707 221.02 18.52 4.566 2.141 4.566 846 3.673 221.01 18.52 4.441 2.140 4.441 848 3.647 221.01 18.52 4.320 2.139 4.320 850 3.625 221.00 18.52 4.204 2.138 4.204 852 3.602 220.99 18.52 4.095 2.138 4.095 Continues on next page... 13 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 854 3.580 220.99 18.52 3.990 2.137 3.990 856 3.558 220.98 18.52 3.889 2.136 3.889 858 3.535 220.97 18.52 3.790 2.135 3.790 860 3.513 220.97 18.52 3.695 2.134 3.695 862 3.490 220.96 18.52 3.602 2.134 3.602 864 3.467 220.95 18.52 3.517 2.133 3.517 866 3.445 220.95 18.52 3.435 2.132 3.435 868 3.422 220.94 18.52 3.355 2.132 3.355 870 3.400 220.94 18.52 3.278 2.131 3.277 872 3.377 220.93 18.52 3.202 2.130 3.202 874 3.354 220.93 18.52 3.128 2.130 3.128 876 3.331 220.92 18.52 3.057 2.129 3.056 878 3.309 220.92 18.52 2.988 2.129 2.988 880 3.286 220.91 18.52 2.924 2.128 2.924 882 3.263 220.91 18.52 2.861 2.127 2.861 884 3.240 220.90 18.52 2.800 2.127 2.800 886 3.218 220.90 18.52 2.740 2.126 2.740 888 3.195 220.90 18.52 2.681 2.126 2.681 890 3.172 220.89 18.52 2.624 2.125 2.624 892 3.149 220.89 18.52 2.568 2.125 2.568 894 3.127 220.88 18.52 2.513 2.124 2.513 896 3.103 220.88 18.52 2.460 2.124 2.460 898 3.081 220.88 18.52 2.411 2.123 2.411 900 3.058 220.87 18.52 2.363 2.123 2.363 902 3.035 220.87 18.52 2.315 2.123 2.315 904 3.012 220.86 18.52 2.269 2.122 2.269 906 2.989 220.86 18.52 2.223 2.122 2.223 908 2.966 220.86 18.52 2.178 2.121 2.178 Continues on next page... 14 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 910 2.943 220.85 18.52 2.134 2.121 2.134 912 2.920 220.85 18.52 2.090 2.120 2.090 914 2.897 220.85 18.52 2.047 2.120 2.047 916 2.874 220.84 18.52 2.005 2.120 2.005 918 2.851 220.84 18.52 1.964 2.119 1.964 920 2.828 220.84 18.52 1.926 2.119 1.926 922 2.805 220.83 18.52 1.888 2.118 1.888 924 2.782 220.83 18.52 1.852 2.118 1.852 926 2.759 220.83 18.52 1.815 2.118 1.815 928 2.736 220.82 18.52 1.779 2.117 1.779 930 2.713 220.82 18.52 1.744 2.117 1.744 932 2.690 220.82 18.52 1.709 2.117 1.709 934 2.667 220.82 18.52 1.674 2.116 1.674 936 2.644 220.81 18.52 1.640 2.116 1.640 938 2.621 220.81 18.52 1.606 2.116 1.606 940 2.597 220.81 18.52 1.572 2.115 1.572 942 2.574 220.80 18.52 1.539 2.115 1.539 944 2.551 220.80 18.52 1.506 2.115 1.506 946 2.528 220.80 18.52 1.474 2.114 1.474 948 2.505 220.80 18.52 1.445 2.114 1.445 950 2.482 220.79 18.52 1.416 2.114 1.416 952 2.458 220.79 18.52 1.387 2.113 1.387 954 2.435 220.79 18.52 1.358 2.113 1.358 956 2.412 220.78 18.52 1.329 2.113 1.329 958 2.389 220.78 18.52 1.300 2.112 1.300 960 2.365 220.78 18.52 1.272 2.112 1.272 962 2.344 220.78 18.52 1.244 2.112 1.244 964 2.327 220.77 18.52 1.216 2.111 1.216 Continues on next page... 15 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 966 2.314 220.77 18.52 1.188 2.111 1.188 968 2.305 220.77 18.52 1.161 2.111 1.161 970 2.297 220.77 18.52 1.134 2.110 1.134 972 2.289 220.76 18.52 1.108 2.110 1.108 974 2.281 220.76 18.52 1.083 2.110 1.083 976 2.273 220.76 18.52 1.058 2.109 1.058 978 2.265 220.76 18.52 1.037 2.109 1.037 980 2.256 220.75 18.52 1.015 2.109 1.015 982 2.248 220.75 18.52 0.994 2.109 0.994 984 2.240 220.75 18.52 0.973 2.108 0.973 986 2.232 220.75 18.52 0.953 2.108 0.953 988 2.224 220.75 18.52 0.933 2.108 0.933 990 2.216 220.74 18.52 0.913 2.108 0.913 992 2.207 220.74 18.52 0.893 2.107 0.893 994 2.199 220.74 18.52 0.874 2.107 0.874 996 2.191 220.74 18.52 0.855 2.107 0.855 998 2.183 220.74 18.52 0.836 2.107 0.836 1000 2.175 220.73 18.52 0.817 2.106 0.818 1002 2.167 220.73 18.52 0.799 2.106 0.799 1004 2.158 220.73 18.52 0.781 2.106 0.781 1006 2.150 220.73 18.52 0.763 2.106 0.764 1008 2.142 220.73 18.52 0.746 2.105 0.746 1010 2.134 220.72 18.52 0.729 2.105 0.729 1012 2.126 220.72 18.52 0.712 2.105 0.712 1014 2.117 220.72 18.52 0.695 2.105 0.695 1016 2.109 220.72 18.52 0.680 2.105 0.680 1018 2.101 220.72 18.52 0.666 2.104 0.666 1020 2.093 220.71 18.52 0.653 2.104 0.653 Continues on next page... 16 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1022 2.085 220.71 18.52 0.639 2.104 0.639 1024 2.076 220.71 18.52 0.625 2.104 0.625 1026 2.068 220.71 18.52 0.612 2.103 0.612 1028 2.060 220.71 18.52 0.598 2.103 0.598 1030 2.052 220.71 18.52 0.585 2.103 0.585 1032 2.043 220.70 18.52 0.572 2.103 0.572 1034 2.035 220.70 18.52 0.559 2.103 0.559 1036 2.027 220.70 18.52 0.546 2.102 0.546 1038 2.019 220.70 18.52 0.533 2.102 0.533 1040 2.010 220.70 18.52 0.521 2.102 0.521 1042 2.002 220.70 18.52 0.508 2.102 0.508 1044 1.994 220.70 18.52 0.495 2.102 0.495 1046 1.986 220.69 18.52 0.483 2.102 0.483 1048 1.977 220.69 18.52 0.470 2.101 0.471 1050 1.969 220.69 18.52 0.458 2.101 0.458 1052 1.961 220.69 18.52 0.446 2.101 0.446 1054 1.953 220.69 18.52 0.434 2.101 0.434 1056 1.944 220.69 18.52 0.422 2.101 0.422 1058 1.936 220.68 18.52 0.410 2.100 0.410 1060 1.928 220.68 18.52 0.398 2.100 0.398 1062 1.920 220.68 18.52 0.386 2.100 0.386 1064 1.911 220.68 18.52 0.375 2.100 0.375 ...End NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SPILLWAY ANALYSIS >>> Bioretention Pond Spillway Name Bioretention Pond Spillway Discharge 37.03 Peak Flow Period 1 Channel Slope 0.33 Channel Bottom Width 20 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 37.03 cfs 10.36 ft/s 0.18 ft 0.026 8.5 lbs/ft2 3.65 lbs/ft2 2.33 STABLE F P300 Unvegetated Underlying Straight 37.03 cfs 10.36 ft/s 0.18 ft 0.026 5.68 Ibs/ft2 3.59 lbs/ft2 1.58 STABLE F Substrate Shoremax w/ Straight 37.03 cfs 9.9 ft/s 0.18 ft 0.028 14 lbs/ft2 3.8 lbs/ft2 3.68 STABLE F P300 Reinforced Vegetation Underlying Straight 37.03 cfs 9.9 ft/s 0.18 ft 0.028 8.5 Ibs/ft2 3.74 Ibs/ft2 2.27 STABLE F Substrate SPILLWAY FLOW LONG H B W SS CHANNEL LINING TOP OF EMBANKMENT SPILLWAY ELEVATION Q(100) SLOPE(%) ELEVATION GRASS STRAW WITH NET NAG 35.63 CFS 33.3% 0.8' 20.0' 24.8' 3:1 222.2 223.0 SPILLWAY SHOREMAX W/ P300 w EXTEND LINING TO EXTEND LINING TO TOP OF SPILLWAY TOP OF SPILLWAY TOP OF EMBANKMENT=223.0 SS H /CHANNEL LINING S SPILLWAY ELEVATION=222.2 MATTING SHALL BE AS NOTED OR APPROVED EQUAL. 1- B GRASS SPILLWAY DETAIL GRASS SOD ON SPILLWAY AND SIDE SLOPES 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 0.992 2 744 11,335 Pre-Developed-Overall Site 2 SCS Runoff 27.72 2 718 55,448 Post Developed to Pond 3 Reservoir 0.000 2 n/a 0 2 220.57 25,106 Post Through Pond 5 SCS Runoff 0.236 2 246 2,756 1.0 Post-Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 220.04 1,764 1.0inPost Through Pond BioRet(Turnberry) - Copy.gpw Return Period: 1 Year Monday, 04/ 1 /2024 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 1 Pre-Developed-Overall Site Hydrograph type = SCS Runoff Peak discharge = 0.992 cfs Storm frequency = 1 yrs Time to peak = 744 min Time interval = 2 min Hyd. volume = 11,335 cuft Drainage area = 14.150 ac Curve number = 55.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.60 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Developed-Overall Site Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 1.00 - 1.00 0.90 0.90 0.80 0.80 0.70 0.70 im Im 0.60 I I 0.60 I— I� 0.50 I 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 27.72 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 55,448 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed to Pond Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 28.00 , 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - A - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 220.57 ft Reservoir name = Bio-Retention Max. Storage = 25,106 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 - 4.00 0.00 - � 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 25,106 cuft Pond Report 5 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Pond No. 1 - Bio-Retention Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation=220.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 220.00 43,600 0 0 0.60 220.60 45,150 26,625 26,625 1.00 221.00 46,190 18,268 44,893 2.00 222.00 48,840 47,515 92,408 3.00 223.00 51,540 50,190 142,598 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 24.00 0.00 Inactive Inactive Crest Len(ft) = 5.00 11.00 20.00 Inactive Span(in) = 24.00 0.00 0.00 0.00 Crest El.(ft) = 220.60 221.50 222.20 0.00 No.Barrels = 1 0 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 217.50 0.00 0.00 0.00 Weir Type = Rect Broad Ciplti --- Length(ft) = 42.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 4.76 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 2.000(by Contour) Multi-Stage = n/a No No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 3.00 223.00 2.00 222.00 1.00 - 221.00 0.00 220.00 0.00 8.00 16.00 24.00 32.00 40.00 48.00 56.00 64.00 72.00 80.00 88.00 Total Q Discharge(cfs) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 5 1.0 Post-Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 0.236 cfs Storm frequency = 1 yrs Time to peak = 246 min Time interval = 2 min Hyd. volume = 2,756 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to Pond Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 1 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - I , 0.00 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 6 1.0inPost Through Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to Pond/lax. Elevation = 220.04 ft Reservoir name = Bio-Retention Max. Storage = 1,764 cuft Storage Indication method used. Exfiltration extracted from Outflow. 1.0inPost Through Pond Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - - 0.00 0 60 120 180 240 300 360 420 Time (min) Hyd No. 6 Hyd No. 5 Total storage used = 1,764 cuft Pond Report 8 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Pond No. 1 - Bio-Retention Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation=220.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 220.00 43,600 0 0 0.60 220.60 45,150 26,625 26,625 1.00 221.00 46,190 18,268 44,893 2.00 222.00 48,840 47,515 92,408 3.00 223.00 51,540 50,190 142,598 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 24.00 0.00 Inactive Inactive Crest Len(ft) = 5.00 11.00 20.00 Inactive Span(in) = 24.00 0.00 0.00 0.00 Crest El.(ft) = 220.60 221.50 222.20 0.00 No.Barrels = 1 0 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 217.50 0.00 0.00 0.00 Weir Type = Rect Broad Ciplti --- Length(ft) = 42.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 4.76 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 2.000(by Contour) Multi-Stage = n/a No No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 3.00 223.00 2.00 222.00 1.00 - 221.00 0.00 220.00 0.00 8.00 16.00 24.00 32.00 40.00 48.00 56.00 64.00 72.00 80.00 88.00 Total Q Discharge(cfs) 9 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 3.085 2 736 22,131 Pre-Developed-Overall Site 2 SCS Runoff 39.02 2 718 78,415 Post Developed to Pond 3 Reservoir 1.495 2 748 7,803 2 220.80 35,781 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 220.00 0.000 1.0inPost Through Pond BioRet(Turnberry) - Copy.gpw Return Period: 2 Year Monday, 04/ 1 /2024 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 1 Pre-Developed-Overall Site Hydrograph type = SCS Runoff Peak discharge = 3.085 cfs Storm frequency = 2 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 22,131 cuft Drainage area = 14.150 ac Curve number = 55.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.60 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Developed-Overall Site Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 4.00 - 4.00 3.00 3.00 2.00 - 2.00 1.00 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 39.02 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 78,415 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed to Pond Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 40.00 , 40.00 30.00 30.00 1- 20.00 20.00 10.00 10.00 0.00 I s 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 2 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 1 .495 cfs Storm frequency = 2 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 7,803 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 220.80 ft Reservoir name = Bio-Retention Max. Storage = 35,781 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 40.00 - 40.00 30.00 30.00 20.00 20.00 10.00 10.00 IIIIIII IIIII IIIIII IIIII IIIII IIIII IIIIII LI LI 0.00 � � � _ 0.00 0 120 240 360 480 600 720 840 960 Time (min) — Hyd No. 3 Hyd No. 2 1111111 I Total storage used = 35,781 cuft 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 5 1.0 Post-Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to Pond Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 0.10 0.10 0.09 I 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 6 1.0inPost Through Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to Pond/lax. Elevation = 220.00 ft Reservoir name = Bio-Retention Max. Storage = 0 cuft Storage Indication method used. Exfiltration extracted from Outflow. 1.0inPost Through Pond Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I Total storage used = 0 cuft 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 13.45 2 732 64,127 Pre-Developed-Overall Site 2 SCS Runoff 73.03 2 716 148,295 Post Developed to Pond 3 Reservoir 12.44 2 726 56,495 2 221.42 64,993 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 220.00 0.000 1.0inPost Through Pond BioRet(Turnberry) - Copy.gpw Return Period: 10 Year Monday, 04/ 1 /2024 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 1 Pre-Developed-Overall Site Hydrograph type = SCS Runoff Peak discharge = 13.45 cfs Storm frequency = 10 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 64,127 cuft Drainage area = 14.150 ac Curve number = 55.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.60 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Developed-Overall Site Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 � 6.00 4.00 — 4.00 2.00 - 2.00 0.00 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 73.03 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 148,295 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed to Pond Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 N44.4.4." 0.00 — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 12.44 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 56,495 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 221.42 ft Reservoir name = Bio-Retention Max. Storage = 64,993 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 80.00 — 80.00 70.00 — 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - — 0.00 0 120 240 360 480 600 720 840 960 1080 Time (min) Hyd No. 3 Hyd No. 2 II I I I I I II Total storage used = 64,993 cuft 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 5 1.0 Post-Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to Pond Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 0.10 0.10 0.09 I 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 6 1.0inPost Through Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to Pon(Max. Elevation = 220.00 ft Reservoir name = Bio-Retention Max. Storage = 0 cuft Storage Indication method used. Exfiltration extracted from Outflow. 1.0inPost Through Pond Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I Total storage used = 0 cuft 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 37.55 2 732 156,388 Pre-Developed-Overall Site 2 SCS Runoff 130.69 2 716 271,520 Post Developed to Pond 3 Reservoir 37.03 2 724 154,311 2 222.43 114,020 Post Through Pond 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to Pond 6 Reservoir 0.000 2 n/a 0 5 220.00 0.000 1.0inPost Through Pond BioRet(Turnberry) - Copy.gpw Return Period: 100 Year Monday, 04/ 1 /2024 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 1 Pre-Developed-Overall Site Hydrograph type = SCS Runoff Peak discharge = 37.55 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 156,388 cuft Drainage area = 14.150 ac Curve number = 55.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 29.60 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Developed-Overall Site Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 40.00 40.00 I 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 2 Post Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 130.69 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 271,520 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed to Pond Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 37.03 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 154,311 cuft Inflow hyd. No. = 2 - Post Developed to Pond Max. Elevation = 222.43 ft Reservoir name = Bio-Retention Max. Storage = 114,020 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through Pond Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 114,020 cuft 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 5 1.0 Post-Developed to Pond Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 14.150 ac Curve number = 77.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to Pond Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 0.10 0.10 0.09 I 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,04/1 /2024 Hyd. No. 6 1.0inPost Through Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to Pon(Max. Elevation = 220.00 ft Reservoir name = Bio-Retention Max. Storage = 0 cuft Storage Indication method used. Exfiltration extracted from Outflow. 1.0inPost Through Pond Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I Total storage used = 0 cuft TIME OF CONCENTRATION Existing Conditions DA SCS Methodology OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENT 1 SEGMENT 1 Manning's Equation: Tc=(0.007(nL)^0.8)/(P2^0.5)(s^0.4) 2-year/24-hr Tc=L/60 V V=1.49R'r'S'/n Basin Comments Length Elev1 Elev2 Slope Rainfall Depth Manning's Te, Length Elev2 Elev3 Slope Condition Vavg Tu Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V T3 Troruc Tc(minimum) Tlag Basin (ft) (ft/ft) TP-40(in) n (min) ft ftttt TR-55 Fi.3-1 ft/sec min Flow Area ft^2 ft ft ft ft/ft s ran (min) (10 min) 0.6'Tc(hrs) 1 100 240.5 240.1 0.004 3.68 0.24 25.33 785 240.1 211 0.03707 Unpaved 3.10 4.22 29.55 29.55 0.30 1 WM20231:65 PM GM-PTRO\pmjeMPTIMECONC Tumberry.xls EROSION CONTROL CALCS (RIP-RAP CALCULATIONS) Project Information Project Name: Turnberry South-Phase 1 Project#: Designed by: CP Date: 7/13/2023 Revised by: CB Date: 12/12/2023 Checked by: Date: Rip-Rap Apron SCM-2 Pipe Diameter d= 24 Pipe Slope s= 4.76 % Manning's number n= 0.013 Flow Q= 12.44 cfs Velocity V= 13.08 ft/s Dissipator Dimensions* Zone= 2 Stone Filling Class= B Entry Width(3 X Do)= 6.0 ft Length(6 X Do)= 12.0 ft Width(La+Do)= 14.0 ft Min.Thickness= 22 inches Min.Stone Diameter= 6 inches 1 12.0 6.0 14.0 *All units are in feet **Dissipator pad designed for full flow of pipe RIP-RAP.xls 4/1/2024 Page 1 of 1