HomeMy WebLinkAboutNCC242070_ESC Approval Submitted_20240710 , Iredell County Planning & Development Erosion Control Section 1 R E D E L L 349 North Center Street f< P.O. Box 788 Statesville, NC 28687 Date: May 9th 2024 LETTER OF APPROVAL WITH MODIFICATIONS Mitch Johnson JMS Southeast, Inc. 105 Temperature Ln. Statesville, NC 28677 RE: Project Name: JMS Southeast Acres Approved with Modifications: 1.283 Project ID: IREDE-2024-093 Project Location: PIN 4704519120.000 Submitted By: Jordan Grant & Associates, PLLC Date Received: April 22nd 2024 Plan Type: New Dear Mr. Johnson: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. 113A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the Letter of Approval with Modifications 1MS Southeast May 91h 2024 Page 2 of 3 commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the applicable annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form and fee details may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. As required in the approved plan construction sequencing, please schedule a preconstruction conference with our staff prior to land disturbing activity. Your cooperation is appreciated. Sincerely, q-,71.19‘6, 117—_________ _ Jonathan Williams, CESSWI Erosion Control Coordinator Enclosures: Modifications Fact Sheet on the New NCG01 Permit Permit Letter of Approval with Modifications JMS Southeast May 9th 2024 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: JMS Southeast Project ID: IREDE-2024-093 County: Iredell Reviewed by: Jonathan Williams Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. 1. Provide correct basin disturbed area in the erosion control details to match the value provided on the Financial Responsibility Ownership form. -RC 2. Delineate the emergency spillway location on the plan. -RC 3. Provide dust control detail. -RC 4. Extend silt fencing on each side of the property boundary. -SC