Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCC190739_NOT Closeout Documents_20240703 <C� Greenville
`I NORTH CAROLINA
ENGINEERING
Engineering Department-Sedimentation/Erosion Control Program
June 20, 2024
Letter of Final Inspection
Blackwood, Parrott&Roberson, LLC
1003 Red Banks Road
Greenville,NC 27858
Re: Project Name: Blackwood Ridge Phase 3
Project Number: ESCP-2019-0020
County: Pitt
Disturbed Acreage: 4.0
Responsible Party: Blackwood, Parrott&Roberson, LLC
Dear Mr. Parrott,
At your request, this office has completed its final site inspection of the referenced project. We
find the site stable and in compliance with the approved Sedimentation and Erosion Control
Plan.
Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been
closed for this project and you will need to terminate your NCGO1 permit.
Please do not hesitate to call if you have any questions.
Respectfully,
Yu;t G Ldwj
Victor C. Long
Engineering Assistant III
Engineering Department
City of Greenville
vlong@greenvillenc.gov
www.greenvillenc.gov
252-329-4888
252-329-4467 1500 Beatty Street, Greenville, NC 27835-7207 greenvillenc.gov