HomeMy WebLinkAboutNCC211954_NOT Closeout Documents_20240703 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699
County: Cleveland Project: 233 Randolph 74 Solar I,LLC River basin: Broad
Person financially responsible:hep Petra Construction,LLC-Wayne Marshall, Project#: CLEVE-2021-025
Manager
Address: 11330 Vanstory Drive,Suite 101,Huntersville,NC 28078
1. Project Location: Southern Drive,Shelby
Pictures: No
2. Weather and soil conditions: Sunny,Workable soil Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Frank Marshall Title: Associate Project Manager
Inspection report: Sent Report Date given/sent: January 08,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
All projects that have been approved prior to April 01,2019,under the old permit system,are
not required to take any additional actions.The stormwater permit is terminated at the same
time as the termination of this erosion control permit
Reported by: Ian Callaway Others present:
Date of inspection: December 19,2023 Time arriving on site: 10:00 AM Time leaving site: 10:15 AM
cc: