HomeMy WebLinkAboutNCC202357_NOT Closeout Documents_20240701 SEDIMENTATION AND CONSTRUCTION STORMWATER INSPECTION REPORT
TOWN OF WAXHAW DEVELOPMENT SERVICES DEPARTMENT
ENGINEERING DIVISION
1150 N. BROOME STREET WAXHAW, NC 28173 704-843-2195
County: Union
Municipality: Town of Waxhaw
Project: Millbridge Phase 7 E
River Basin: Catawba
Person Financially Responsible:
William DeForest
Lennar Carolinas, LLC
6701 Carmel Road
Suite 425
Charlotte, NC 28273
Project Number: SEC-017408-2019
Project Location: Millbridge Parkway and various streets
Waxhaw, NC 28173
Tax Parcel: Various
Photos: No Digital: No
Weather and Soil Conditions: 75 degrees and dry.
Is the site under notice of violation: No
Is the site in compliance with SPCA and rules: Yes
SPCA Violations
None
Is the site incompliance with NPDES Permit NCG 010000:Yes
Has sedimentation damage occurred since last inspection: No
Lake/natural watercourse on the tract: N/A Lake/natural watercourse off the site: N/A Other Property: N/A
Description: N/A
Degree of damage: N/A
Stormwater Discharge Outfall with high turbidity or sedimentation loss: N/A
Inspection sent to: William DeForest of Lennar
Date Given/Sent: 6-14-24
Corrective Actions Needed:
None
Comments: Phase is complete. The site is completely stabilized. No further erosion control inspections will be
performed. The NCG01 coverage eNOT can be applied for to terminate coverage.
Report By: Chris Rice
Others Present: None
Date of Inspection: 6-14-24