Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSW6231105_O&M Agreement/Plan_20240701 (2) Permit Number:
(to be provided by DWQ)
Drainage Area Number:
Stormwater Wetland Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a
known set location. Any deficient BMP elements noted in the inspection will be corrected,repaired or
replaced immediately. These deficiencies can affect the integrity of structures, safety of the public,and
the removal efficiency of the BMP.
Important maintenance procedures:
- Immediately following construction of the stormwater wetland,bi-weekly inspections will be
conducted and wetland plants will be watered bi-weekly until vegetation becomes established
(commonly six weeks).
- No portion of the stormwater wetland will be fertilized after the first initial fertilization that is
required to establish the wetland plants.
- Stable groundcover will be maintained in the drainage area to reduce the sediment load to the
wetland.
- Once a year,a dam safety expert should inspect the embankment.
After the stormwater wetland is established,I will inspect it monthly and within 24 hours after every
storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and
maintenance will be kept in a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired
immediately.
BMP element: Potential problem: How I will remediate the problem:
Entire BMP Trash/debris is present. Remove the trash/debris.
Perimeter of wetland Areas of bare soil and/or erosive Regrade the soil if necessary to remove the
gullies have formed. gully,and then plant a ground cover and
water until it is established. Provide lime
and a one-time fertilizer application.
Vegetation is too short or too long. Maintain vegetation at an appropriate
height.
Inlet device: pipe or The pipe is clogged(if applicable). Unclog the pipe. Dispose of the sediment
swale offsite.
The pipe is cracked or otherwise Replace the pipe.
damaged (if applicable).
Erosion is occurring in the swale (if Regrade the swale if necessary to smooth
applicable). it over and provide erosion control
devices such as reinforced turf matting or
riprap to avoid future problems with
erosion.
Form SW401-Wetland O&M-Rev.4 Page l of 3
Permit Number:
(to be provided by DWQ)
BMP element: Potential problem: How I will remediate the problem:
Forebay Sediment has accumulated in the Search for the source of the sediment and
forebay to a depth that inhibits the remedy the problem if possible. Remove
forebay from functioning well. the sediment and dispose of it in a location
where it will not cause impacts to streams
or the BMP.
Erosion has occurred. Provide additional erosion protection such
as reinforced turf matting or riprap if
needed to prevent future erosion
problems.
Weeds are present. Remove the weeds,preferably by hand. If
a pesticide is used,wipe it on the plants
rather than spraying.
Deep pool,shallow water Algal growth covers over 50% of the Consult a professional to remove and
and shallow land areas deep pool and shallow water areas. control the algal growth.
Cattails,phragmites or other invasive Remove invasives by physical removal or
plants cover 50% of the deep pool and by wiping them with pesticide(do not
shallow water areas. spray) -consult a professional.
Shallow land remains flooded more Unclog the outlet device immediately.
than 5 days after a storm event.
Plants are dead,diseased or dying. Determine the source of the problem:
soils,hydrology,disease,etc. Remedy the
problem and replace plants. Provide a
one-time fertilizer application to establish
the ground cover if necessary.
Best professional practices show that Prune according to best professional
pruning is needed to maintain optimal practices.
plant health.
Sediment has accumulated and Search for the source of the sediment and
reduced the depth to 75% of the remedy the problem if possible. Remove
original design depth of the deep the sediment and dispose of it in a location
pools. where it will not cause impacts to streams
or the BMP.
Embankment A tree has started to grow on the Consult a dam safety specialist to remove
embankment. the tree.
An annual inspection by appropriate Make all needed repairs.
professional shows that the
embankment needs repair.
Evidence of muskrat or beaver activity Consult a professional to remove muskrats
is present. or beavers.
Micropool Sediment has accumulated and Search for the source of the sediment and
reduced the depth to 75% of the remedy the problem if possible. Remove
original design depth. the sediment and dispose of it in a location
where it will not cause impacts to streams
or the BMP.
Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the
sediment off-site.
The outlet device is damaged Repair or replace the outlet device.
Receiving water Erosion or other signs of damage have Contact the NC Division of Water Quality
occurred at the outlet. 401 Oversight Unit at 919-733-1786.
Form SW401-Wetland O&M-Rev.4 Page 2 of 3
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the performance of the
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior
to any changes to the system or responsible party.
Project name:Hilton Heights 72 Unit Relocation
BMP drainage area number:BMP#1
Print name:Adrian Lowery
Title: Executive Director
Address:407 N Sycamore Street, Lumberton, NC 28358
Phone: 910-671-8200
Signature: th)(44.6,4-i 1 %t1e, 7-
Date: Q/o2cp/023
Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been
sold and a resident of the subdivision has been named the president.
I, CZ00%42- —SCE % y,--1-- , a Notary Public for the State of
Oar VV.\CQrph h n 0. , County of'D5or) , do hereby certify that
)\cNi Gm V O ).Qx vk personally appeared before me this Wtsday of
c: .RQ YYI\Dilir' , 2021), and acknowledge the due execution of the forgoing stormwater wetland
maintenance requirements. Witness my hand and official seal,
.���,!4% BARB/Fv��.
• O ��
0 NOr s
C r
'.c z=
L 0 0.
N �• ti
4/Q
3 , N �iel,, &v/
SEAL
My commission expires //2a1 a � /11 Form SW401-Wetland O&M-Rev.4 Page 3 of 3