Loading...
HomeMy WebLinkAboutNCC240966_MODIFICATION Supporting Documents_20240701 rsrAl jee ROY COOPER (1#) Governor ELIZABETH S.BISER Secretary WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA Interim Director Env ronmentaUQuality June 10,2024 LETTER OF APPROVAL Fayetteville Public Works Commission Misty Manning,Engineering Manager Post Office Box 1089 Fayetteville,NC 28302 RE: Project Name: P.O.Hoffer Water Treatment Facility Glenville Lake Acres Approved: 3.5 Project ID: CUMBE-2021-083 County: Cumberland, City: Fayetteville Address: Filter Plant Dr./Hoffer Drive River Basin: :Cape Fear Stream Classification: Other Submitted by: Bret Edwards Date Received by LQS: May 31,2024 Plan Type: Utility Dear Mrs, Maiming: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and herebyissue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site.This plan shall expire three(3) years following the date of approval,if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent(NOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above-named project. The NOI form may be accessed at deq.nc.gov/NCG01.Please direct questions about the NOI form to Brooklyn Broussard at Brooklyn.broussard c@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form,a COC will be emailed to you within three business days.Initially,DEMLR will not charge a fee for coverage under the NCGO1 permit.However, on or after June 1,2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. D_E R North Carolina Department of Environmental Quality I Division.of.Energy,Mineral and Land Resources �/ Fayetteville Regional:0ffice ! 225 Green Street,Suite 7141 Fayetteville.North Carailna 2830i NORn.CARC11JM4 Y 4epammator t ntaia,.�iry 910.4333300 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO 1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project,the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for land disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS 113A-54.1(b)). In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, L Bc - Chris Baker Assistant Regional Engineer DEMLR- Fayetteville Regional Office Enclosures: Certificate of Approval cc: Bret Edwards, P. E., Hazen and Sawyer,P. C. -email copy Joseph Staton, City of Fayetteville Permit Office—email copy Fayetteville Regional Office t ,. ,,t North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Fayetteville Regional Office 1225 Green Street Suite 714 I Fayetteville,North Carolina 28301 Nark-C.'APa.INA Oq+umae+lal QkNtemetM Wumiry 910.433.3300