Loading...
HomeMy WebLinkAbout20071760 Ver 1_More Info Received_20071217Crowley, Crisp & Associates, Inc. Professional Engineers 1906 South Main Street, Suite 122 Wake Forest, NC 27587 919-562-8860 • Fax: 919-562-8872 TO: NCDWQ - 401/Wetlands Unit 2321 Crabtree Blvd Raleigh, NC 27604 ~~~~~ ors ~~Qa~~o~~a~ DATE 12!17/07 JOB NO. 07019 ATTENTION Annette Lucas RE: Wake Cha el Church ~1- I1lDO WE ARE SENDING YOU ®Attached ^ Under Separate Cover via the following items ^ Shop Drawings ^ Prints ®Plans ^ Samples ^ Specifications ^ Copy of Letter ^ Change Order ®Worksheet and letter COPIES DATE NO. DESCRIPTION YES 12/17/07 3 Sheets C2 and C3 from the construction drawin s 12/17/07 1 Revised Level S reader Worksheet 12/17/07 1 Letter THESE ARE TRANSMITTED as checked below: ® For approval ^ For your use ® As requested ^ For review and comment ^ FOR BIDS DUE REMARKS: ^ Approval as submitted ^ Resubmit corrected prints ^ Approved as noted ^ Submit copies for distribution ^ Returned for corrections ^ Return corrected prints 20 ^PRINTS RETURNED AFTER LOAN TO US COPY TO: Jon Frazier, EI 919.562.8860 x 29 j on. fraz ier(cil gmail. com [f enclosures aze not as noted, kindly notify us at once SIGNED: ~ ~~~~i=~~t>~ ~ ~`;~; y~l0 ~~ t~ ~:_ C ~ 1001 f)Er:R - t1,'A1 FR 4UALrfY `NETtNdGS ~r:'D S7pnG,pu.:TFR aRRNCH :1, Crowley, Crisp & Associates, Inc. Professional Engineers C ^~ a.t1 /w 1906 SoudlMainStreet, Suite 122 Wake Forest, NC 27587 919-562-8860 p1 - 11 bo December 17, 2007 Annette Lucas 401/Wetlands Unit NCDWQ 2321 Crabtree Blvd Raleigh, NC 27604 .~QR~, C~, Re: Project: Wake Chapel Church Subject: Revised pond and level spreader plans Dear Ms. Lucas, Thank you for meeting with me to discuss the above project. I've attached revised sheets C2 and C3 from the construction drawings. The following comments from our meeting have been addressed: The level spreader length was recalculated based on planting grass below the level spreader to the edge of the stream buffer while leaving the stream buffer intact. That included 8 feet of grass and 52 feet of wooded vegetation for a total of 60 feet from the level spreader to the stream. The required level spreader length is 125 ft, which is 58 ft/cfs at 2.15 cfs. The emergency spillway was redesigned to flow around the bypass structure and enter the stream at an angle. The bypass channel was shown as entering the emergency spillway directly below the bypass structure. The revised Level Spreader Worksheet is also attached. There appears to be an error in the comment column of the worksheet beside the `Length of level lip' row. The 125 ft provided for the lip is correct based on 58ft/cfs for 2.15 cfs of flow. Please let me know if you have any questions or additional comments. Sincerely, Jon Frazier, EI Crowley, Crisp & Associates, Inc ®®~~AA\\ O~O~ W AT e9~G ~ w~/'r > y NCDENR o `l ' ~ ~ loo ~ ~` STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part lll) must be printed, filled out and submitted along with all of the required information. 1 PROJEC'[ Nf'tJItMATKIN ; Project name Wake Chapel Church Pond and Level Spreader Contact name Jon Frazier Phone number 919-562-8860 x29 Date December 14, 2007 Drainage area number NIA . DESIGN INFORMATION For Level Spreaders Receiving Flow From a BMP Type of BMP Dry Pond Drawdown flow from the BMP 2.15 cfs For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area 332,363 ftz Do not complete this section of the worksheet. Impervious surface area 332,363 ftz Do not complete this section of the worksheet. Percent impervious 1.00 Do not complete this section of the worksheet. Rational C coefficient Do not complete this section of the worksheet. Peak flow from the 1 in/hr storm cfs Do not complete this section of the worksheet. Time of concentration min Rainfall intensity, 10-yr storm inlhr Do not complete this section of the worksheet. Peak flow from the 10-yr storm cfs Do not complete this section of the worksheet. Where Does the Level Spreader Discharge 1 To a bioretention cell? (Y or N) To a wetland? (Y or N) To a filter strip or riparian buffer? Y (Y or N) Please complete filter strip characterization below. Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass 8 ft Width of dense ground cover 0 ft Width of wooded vegetation 52 ft Total width 60 ft Slope (from level lip to to top of bank) 3.33 Are any draws present? N (Y or N) OK Level Spreader Design Forebay surface area 665 sq ft OK Feet of level lip needed per cfs 58 ft/cfs Answer "Y" to one of the following: Length based on the 1 inlhr storm? (Y or N) Length based on the 10-yr, 24-hr storm? (Y or N) Length based on the BMP discharge rate? Y (Y or N) Design flow 2.15 cfs Is a bypass device provided? Y (Y or N) OK Length of the level lip 125 ft #VALUE! Are level spreaders in series? N (Y or N) Form SW401-Level Spreader, Finer Strip, Restored Riparian Buffer-Rev.3 Parts I. and II. Design Summary, page 1 of 2 Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? N (Y or N) Does the channel enter the stream at an angle? Y Dimensions of the channel (see diagram below): M 3 ft B 4 ft W 10 ft y 1 ft Peak velocity in the channel during the 10-yr, 24-hr storm 12.85 cfs Channel lining material Grass ~ i------------- M Y ;•~ B 1 M Fonn SW401-Level Spreader, Finer Strip, Restored Riparian Buffer-Rev.3 Parts I. and II. Design Summary, page 2 of 2