Loading...
HomeMy WebLinkAboutNCC241985_Site Plan or Location Map_20240701 A jimpomiff-vit .dhAviriqpirdremapidroum\, f DU KE „el.. Aiivambvsir J ..i. .rt.ig PROJECT,A'0 ,- ,,,,40 LOCATION 4, ...__ _ E N E RGY® )41.-Ter 10 NORTH & SOUTH CAROLINA STATE MAP RAEFORD LAYDOWN YARD EROSION CONTROL AND ACCESS PLAN PROJECT NOTES RA E F O R D, N C THE PURPOSE OF THE PROJECT(PROJECT)IS TO CONSTRUCT A LAYDOWN YARD FOR DUKE ENERGY TRANSMISSION LINE PROJECTS IN THE VICINITY.THE PROJECT LOCATION IS AT THE SOUTHEAST CORNER OF THE INTERSECTION OF ST.PAULS DR.AND OAKDALE GIN RD.IN HOKE COUNTY,NORTH CAROLINA.THE SITE WILL BE ACCESSED VIA AN EXISTING DRIVEWAY ON OAKDALE GIN RD.A TEMPORARY CONSTRUCTION ENTRANCE WILL TIE INTO THE PAVED APRON OF THE EXISTING DRIVEWAY FOR THE DURATION OF CONSTRUCTION. ' I C THE TOTAL LIMITS OF DISTURBANCE(LOD)FOR THE PROJECT ARE LISTED AS 3.6 ACRES; LATITUDE: 34.966833 HOWEVER,THE SITE HAS PREVIOUSLY BEEN CLEARED AND THERE ARE SEVERAL AREAS WHERE EXISTING CONCRETE FOUNDATIONS WILL BE UTILIZED FOR THE STORAGE OF MATERIALS.IN �'+ I ADDITION,THE CONTRACTOR WILL UTILIZE MATTING TO MINIMIZE LAND DISTURBANCE. LONGITUDE. -79.207487 PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION.AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE •i ,.1 SHEET LIST. APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES, WHENEVER POSSIBLE.EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING • a t / TITLE SHEET SHEET PTL USE ONLY BY NCDEQ. o �j; f- / EROSION&SEDIMENT CONTROL NOTES SHEET PEN1 THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN JANUARY,2025 AND BE •/1 } EROSION&SEDIMENT CONTROL NOTES SHEET PEN2 COMPLETED IN DECEMBER,2025. EROSION&SEDIMENT CONTROL NOTES SHEET PEN3 EROSION&SEDIMENT CONTROL PLAN SHEET P1 GENERAL NOTES Zi, Cl EROSION&SEDIMENT CONTROL DETAILS SHEET PED1 EROSION&SEDIMENT CONTROL DETAILS SHEET PED2 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND ARE ,o EROSION&SEDIMENT CONTROL DETAILS SHEET PED3 CO FOR REFERENCE ONLY.THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. 96 v 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES. sO Ca' p� AERIAL PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. 0 dP Oe '1 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL, EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION.THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO E PALMER ST. MIGRATORY BIRD HOTLINE REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. _ P1 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR .. STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY SHALL NOT DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, ENERGY. SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO 5. THERE ARE NO NAMED SURFACE WATERS WITHIN THE PROJECT LIMITS.THE MOST IMMEDIATE BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND SURFACE WATERS ARE PEDLER BRANCH(18-31-16;C)OF THE CAPE FEAR RIVER BASIN.THE PROJECT IS � CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. NOT SUBJECT TO STATE-REGULATED BUFFER REQUIREMENTS. CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 6. SEE SHEET PEN1 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. 7. WHERE STREAMS EXTEND BEYOND THE RIGHT-OF-WAY.APPROPRIATE BRIDGING AND MATTING OF THESE FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF SPILL REPORTING HOTLINE THE RIGHT-OF-WAY. IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY a p REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER PERMITTING PRIOR TO USE. 'ti Y REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU (5 SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. w 5 DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF 10. WETLAND MATTING SHALL BE COMPOSITE MATS. NO LATTICE OR TWO-PLY MATTING SHALL BE USED o¢ 0 THE DUKE ENERGY SPILL REPORTING HOTLINES AT: IN JURISDICTIONAL WETLANDS AND/OR STREAMS. CAROLINAS&MIDWEST:800.527.3853 11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 100 FEET OF WETLANDS OR o FLORIDA:866.769.1266 SURFACE WATER WITHOUT CONTAINMENT. 12. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. 13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE VICINITY MAP CONTACTS DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. PERMITTING SPECIALIST HDR Engineering Inc. RESPONSIBLE FOR MAINTENANCE: 14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND SCALE: NTS Duke Energy Progress of the Carolinas NAME COVER SHALL BE USED FOR STABILIZATION. Laura Kirby David R.Wagner II,PE PH: 410 S.Wilmington Street 555 Fayetteville St.,Suite 900 FAX: CI Raleigh,NC 27601 Raleigh,NC 27601 EMAIL@EMAIL.COM W P:(276)613-3776 PH:(919)232-6600 Q CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL" (811) khadijah.hasan@duke-energy.com david.wagner@hdrinc.com OR (1-800-632-4949) AT LEAST 48 HOURS PRIOR TO Z BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL 0 UTILITIES THAT PROVIDED THEIR OWN LOCATOR SERVICES Cl INDEPENDENT OR "NORTH CAROLINA ONE CALL". REPORT ANY Q DISCREPANCIES TO THE ENGINEER IMMEDIATELY. ti DUKE vTLE RAEFORD LAYDOWN YARD HDRI 5 eSevilleeringteInc. 900 Ralegh Carolinas 7601 ENERGY® EROSION CONTROL AND ACCESS Q �+ ` N.C.B.E.L.S. License Number:F-0116 PROGRESS PLAN w 550 S. TRYON ST.,SUITE 4500 CHARLOTTE N.C.28202 LINE INDEX: DRAWING SHEET REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED TELEPHONE NO.(919)546-2090 OL335 E18011702 PTL