HomeMy WebLinkAboutNCC211966_NOT Closeout Documents_20240626 FINAL INSPECTION REPORT-Erosion Control
Town of Huntersville- Land Development
105 Gilead Rd, Ste 300, Huntersville NC 28078
(704)-875-7007
Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)should be requested by the
permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of
Termination Process.
NCGO1 COC# ‘NCC211966
Project Name Alexandriana Industrial
Financially Responsible Owner(FRO) 11711 Alexanderana Land, LLC
FRO Address 605 Lexington Ave,Suite 100,Charlotte, NC 28203
Project Location 11142 Statesville Road, Huntersville, NC 28078 (Polaris 3G says: 12035 Hunstad BV 2)
River Basin/Watershed Long
EC Final Inspection Date 6/12/2024 Start Time 13:45 End Time 14:00
Inspector Name Anne Loftin
Others Present None
Weather Conditions Sunny Soil Conditions Workable
Onsite Contact Made No Name
Title/Company
Report Sent Yes See dispatch list at bottom of report
Erosion/Sediment measures removed? Yes
Site Permanently Stabilized? Yes
Comment
BMP's Installed Per Approved Plan? Yes
As-Built BMP Project# asbuilt#ASB-500093 6/6/2024
FINAL INSPECTION COMMENTS
Project is completed,stable and the erosion measures removed. Sand filter passed the field inspection and allowed to secure the
required two-year maintenance bond. Please ensure that the BMP is monitored and maintained per the PC019 and the additional notes
on the as-built survey. Owner has opted for bare sand on sand filter#1 and 2,this will require additional maintenance of periodic raking
to ensure porosity. Please call for maintenance from your SCM contractor if you observe standing water in the basin >3-5 days post rain.
Current SCM maintenance by North American Lawn and Landscape.Owner annual compliance inspections will be due each year+/-45
days of the as-built approval letter.
DISPATCH LIST
Jon Phillips' <jon@selwynpropertygroup.com>; 'Mike Daniel' <mdaniel@nalandscape.com>;Kerry Wright
<kwright@nalandscape.com>; Hernandez, Nestor<hernandez.n@tandh.com>
1 of 1
Report Date: 6/20/2024