Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC241923_Site Plan or Location Map_20240625
. \- :0:17.* ,,,'"\ ice \\•\\ SEBR OWtSUITEEERLDEVELOPER. r `_4... REVISIONS BORROW ANDA/OR WASTE SHALLAREASIF THE SAME PERSON CONDUCTS THE LAND-DISTURBING E PA To THE AND-DISTURBNG CTTIVITY AND ANY RELATED BORROW TIR WASTE ACT1V,,IVITY UNLESS THETHE ` % GREENSBORO,NC 2]408 \,•\\ \ '`'\ 804 GREEN VALLEY ROAD RELATED BORROW OR BORROW OR WASTE ACTIVITY IS REGULATED UNDER THE MINING ACT OF I9]1 OR IS A LANDFILL REGUATED BY THE 1. } - 1.'� - DIVISIONOFWASTEMANAGEMENT.IF THE LAND-DISTURBING ACTIVITY AND ANY REATED BORROW OR WASTE ACTIVITY \ \ ..ty / , .rktv_ irr , ARE NOT CONDUCTED BY THE SAME PERSON,THEY SHALL BE CONSIDERED SEPARATE AND-DISTURBING ACTIVITIES AND \ \ \` .�� t \ \ PHONE:T:STEVE SHAVITZ N MUST BE PERMITTED EITHER THROUGH THE SEDIMENTATION POLLUTION CONTROL ACT AS A ONE-USE BORROW SITE OR \\\ �y\ \\\ \.... . s/Qt' >s�/ •,/, �\Ca \ \\ PHONE:(336)612-3314 / \ THROUGH THE MINING ACT ' q\ // ///- / „\\ EMAIL:Steve(gCeeprrver.com • MAINTENANCE SCHEDULE: \\1 %\„/ v •1 / \• \ \\ ENGINEER: ))ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING \\ +�. © /j \ \ \ \ \ CPT ENGINEERING B SURVEYING,INC. flip \ EVERY STORM EVENT,BUT IN NO CASE LESS THAN ONCE EVERY WEEK.ANY REPAIRS OR CLEANING NECESSARY TO • (\�\\ 4600 TYNING STREET MAINTAIN EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE COMPLETED IMMEDIATELY. O \\ \ b \ \\ HIGH POINT,NC 2)265 %.1%50 //�/ QO pY/' • CONTACT.STEVENT WEBB P.E. 2.)ALL SEEDED AREAS SHALL BE REFERTILIZED,RESEEDED AS NECESSARY,AND MULCHED ACCORDING TO THE SEEDING / / � jEP-may \\ PHONE:(336)012-BBOO EXT.310 \ - - SCHEDULE. ets S�Is�� /D ✓ ��, \ ° 5 5 � \ EMAIL nevew®cplen9 neenn&gym \ All �� 3.)WATERAS NEEDEDANDMOWT0314'T01'HEIGHT.TOPDRESSWITH 40 LBIACRENITROGEN INAPR.,50 LB.INMAV,50 \� N1 djY O • Lp y"' / • /\' P ,n �\ \ \. \ T Tr- 7 LB IN JUNE,30 LB IN JULY,AND 2550 LB IN AUG. � / /? p A _/ ( - PO M'W \ \ %� .� Y� O �i aP A.v� v b v \v v v VICINITY MAP am ' °' ' 'o•/dAe •`.,� /\JA{I V A1/ \IC / T AAV A V \\ \AA\ CONSTRUCTION SEQUENCE: / / ' ' Z ° a --- ✓j/ " i� "\ � P6139 5'\\\ \ \\\ L/ -- 1.CONTRACTOR SHALL ENSURE THAT ALL APPLICABLE PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO O� } / •9V�`Cp �' "v2 _ __04°� / \\ �� \\ \ \ A \\ \\\\ PROCEEDING WITH WORK ASSOCIATED WITH THESE DOCUMENTS. �\ > /�\\ L \ 4\-� 2.FILE NOTICE OF INTENT AND OBTAIN CERTIFICATE OF COVERAGE FOR THE NPDES NCGO1 PERMIT FROM THE NC mz 2 V //�* /JQ p/� b�PL- --� i \•� , � \ PG \\i / \\\ DEPARTMENT OF ENVIRONMENTAL QUALITY. \ j ✓/ \1 ° e4O4S I %A / O e\' -1_ y_aS NJ, \\\ 3.SCHEDULE A PRE-CONSTRUCTION CONFERENCE WITH OWNER,ALL CONTRACTORS FOR AND DISTURBANCE AND/OR \ yDN/.y� \ j°� "� _� ( \/ �\ S / © \\ iQ \\ EROSION COMROL,ANDEROSION CONTROL AUTHORITY PERSONNEL TO DISCUSS THE EROSION CONTROL PAN. \\ / - �[ /1 Y�Y,,O O.FAGTHE NEW CONSTRUCTION LIMITS AS INDICATED ON THE PAN,DO NOT EXCEED PROPERTY BOUNDARIES WITHOUT • '� `->� Q �k a - /-` I \ \\ �') / / / 1\ 4 A \ '-Q��4 \\ WRITTEN APPROVAL OF ADJACENT PROPERTY OWNERS.FLAG THE CLEARING LIMITS AND VERIFY WITH THE OWNER PRIOR TO \\\ �,y j;:. // /r \\ \\ \ O. y• % - yr' I -\ . f ( `/ \ CLEARING. f \/ /a S.THE r-rs CONSISTS OF AN EXISTING PAVED PARKING LOT WITH MENL,00 sp,, ING DRIVEWAYS.THE EXISTING DRVEWAYS .1��1 r I I / ••� \� \ \ •\ \ WILL EITHER BE CLOSED OR RECONSTRUCTED AT THE AREAS ALSO SHOWN AS THE TEMPORARY CONSTRUCTION ENTRANCES �L� I- &yn�}� \ / 1\ ( \ yI� /// / 1 \ . / \ \\ \ \ [COG STD.436].THE EXISTING PAVED DRIVEWAYS SHALL REMAIN IN PACE UNTIL GRADING DICTATES THAT THE DRIVEWAY BE �/ 4 /� �Q•Ogp �r �• e \ \ �$O\ °'1� _ \ /\ �� \y0� \ \ \ yam \ REMOVED AND/OR REGRADED AND RECONSTRUCTED WITH A TEMPORARY CONSTRUCTION ENTRANCE[COG STD.6%]UNTIL z IA IV •.� \I \\\ -ITp�'�i jVy/� \ /�/ PO .� / ��/ \\ C1C , \\ \ THE PERMANET DRIVEWAY IS PAVED. \� IA(� \� - \ \ \ r \\ \\ / \\tt I N /\�1\\� 'r` Yp Yin r \ �� ` • ,/ \ \ \ \ $ /// \ $" �\� �' \y Ff' qy j \\ ` `\ \ SELF INSPECTION(INTIAL DATE: 1 Fm ry h W t„, \ \ \�\�\ \ \ ) / /j/ \ \�/ y/ ��B // f -- ��F, � /� \,\ \ \ 6.INSTALL TEMPORARY SILT FENCE[COG STD 430]AND TEMPORARY TREE PROTECTION FENCE[COG STD.448].INSTALL F1 ` 'If' • \ \ \` /i \ \ \ \ ( ' i \\ ' ! \\ \ TEMPORARY STONE OUTLETS IN LOW AREAS OF SILT FENCE. V x \ lr y x \ \ \ \ T• 0 "`° SELF INSPECTION INTIAL: DATE: 1 II- \ \1w,�= 1/ \ �/ \ \ P1"\ \ \ \ \�/ % / \ \ \ \IIh\ /�. p/ / �® �y\ �fl�'e19 • a� 1 \ \ ].INSTALL TEMPORARY SEDIMENT CONTROL LOGS[COG STD.450]AT THE EXISTING STORM INLETS ON-SITE.TEMPORARY '�j N �`l~® `y'\ / c, \ I \ \ \ \�%.„/ / �'" ,,,,T' \, 1 A \ \ SEDIMENT CONTROL LOGS TO REMAIN IN PLACE UNTIL THE EXISTING STORM INLETS ARE TO BE REMOVED. Q l) s\ �-F \ \ \ \ \ LE��ii' \ \ \ \ T 1) y I t '( P11�P"y "So - l \ \ ZZ \ \--" /�; \/I O 1"1\,/\.... \ \ \ \ \ \ / -yr� \ \ •I "lot\� 0®d l/\ \ \ SELF INSPECTION(INTIAL: DATE: 1 J\ ) M• � \ \� \ \ \� G \ \ \ ( \ / l R ,„ y\/\\\--- 5 B.CLEAR ANDREMOVETHETREESASINDICATED ON THE DEMOLITION PAN. fi i1 P\ /fo- A A r \yU` \ a/� V v '/, e / ��� �LjI� \ i O�� pep \\ \ \�/���� //\�%�-1� \\ % \ \ F/ I C \ OeP�/-jy�/\� '/ / /' `\\1 \ SELF INSPECTION(INTIAL: DATE: 1 Z�I N \\% ss\ I3b IP�,•Lh YY1ed`_.4Y. ry \\\ f/,i -.- \\\ V/ ` \ \ �� �' l \'�S�.y.l y'.. { �\ / / \\\\\ \ \ \ 9.REFER TO THEEXISTING CONDITIONS/DEMOLITION PLAN FOR REMOVAL/RELOCATION OF E%ISTINGUTILITIES.REMOVAL OF Ll9 ZlO 4�v�( V•""ee,;t \ ,G \\ \ ( \ \ \ \ \/� / 1 EXISTING CONCRETE,REMOVAL OF EXISTING CURB,REMOVAL OF EXISTING ASPHALT,REMOVALOF EXISTING STORM \\\ W"W ; .^ �. , yam,\ \ \ \ \ .. '.....*:\-:-.....1 \\ /J �n i/ \\ 4\ \ DRAINAGE.ETC.REMOVE/HAULOFF ALLDEMOLITIONDEBRIS ASNEWPROPOSEDIMPROVEMENTS AREBEINGINSTALLED. W 5' �" P' E // !i'g \ iii\ \ \ ///"""""" `y / I \\ 10.INSTALL THE STORM DRAINAGE FROM THE EXISTING CURB INLET(EX.CIMS)AT LENDEW STREET THRU THE SITE TO \ eA\I �// \ i\ gf, \\,\ CONNECT TO THE EXISTING CURB INLETS EX.CI XI AND CI 52I AT MERRITT MEDICAL PLAZA(1511 WESTOVER TERRACE). \ .�\c 3�PO 5.1 6e -/ -�� 6N`- / `- '\\ \ \ \ \ \ V% jIA3 \ �\ \ yj /f �/ \1\�\\ INSTALL TEMPORARY INLET PROTECTION[COG STD.4311 AS THE STORM INLETS ARE INSTALLED.INSTALL PARTIALLY =IU 3�' tNx / > INSTALLED STORM SEWER COG STD.443 AS NEEDED THESTORM DRAINAGE IS BEING INSTALLED. Z \ \ w" e aurae j i .e._ \\\ \ \ \ V� \ \ • /f _I \l [ I y. ,- ""JW< / ie�! 2.OS AL. \\\ \ �s V 111 \ \, \ �\l U�' � / �\ \ ,\ \ l [\ \\ SELF INSPECTION(INTIAL DATE 1 z ° \ �°\\\ 'OF�'I'N. �Qp,•, / \ / /`. \- PL / \\\y/ . \ I \ [\5-\\ \/ 11.ONCE THESTORM DRAINAGE EXTENSION THRUTHESITEHC BEEN INSTALLEDUPTO CB M33 REMOVETHEEXISTING \ °�d0 ', 1)\\\ \ "" `L 9 : Obb / / / / \ \\\� ASPHALT,CURB,AND UTILITIES IN THE AREA OF TEMPORARY SKIMMER SEDIMENT BASIN k1.INSTALL TEMP.SKIMMER I/���� \ ,j®" pRNNAf£NT tl94A6i - \ •Y N1 "6A me.\ \ ' \��Q��\ /\\j�\/`� / 5J\1 \\ /� SEDIMENT BASIN 01 WITH BAFFLES AND 2.5"SKIMMER.EMERGENCY SPILLWAY SHALL BE LINED WITH AN IMPERMEABLE \,aS\\' d'91Ex11LE LI1H2 \I ��" I 6' a l' - X' '=� \/ _/ \ \ 1t\\\\\� MEMBRANE(10 MILPOLY),TRENCH AND KEY-IN LINER/MIN.1'DEPTH).EMERGENCYSPILLWAYEL.016.0(24'WEIRI.EXTEND y,�r i • \/ J I �O, r k\y �" \ J / 42�'!' �\ 6 �% \ \ l // 1 \\4N \ GEOTEXTILELINER(MIRAFI FN406)FROM THE EMERGENCY SPILLWAY/SKIMMEROUTLET TOCBM33 AS OUTLET PROTECTION. v *.\-, �_\ I �`��\ J LJ AL':_\\\ sk,, /,� //^ I `s, INSTALL AND MAINTAIN TEMPORARY EARTH BERMS[COG STD.440]TO TEMPORARY SKIMMER SEDIMENT BASIN.,DURING \\ /PeOPETet Md OBTIU�p -� �,,// \\\ ., .�; ` .� •\ I I J 11\\1\ CONSTRUCTION. [ \♦ jA\\ s�'ve�iaei.-de f \ �� TAP.Bran n1{rtmrec \\\ '�- �4 \ II\ I 1\aF A; �'..:, \ lll'/ / vc;sm Asa 11\\\\ _ P1 /\ / \ \ \ / \ g,. ._t• / \ \ \ -- I/ 11\ I\\\ , SELF INSPECTION(INTIAL DATE 1 WMEN \\\ _ �.. ' / •• �,/ j _ \ \\\\\ y�14',,,,I \ \�^\� )I 12.ONCE THE STORM DRAINAGE EXTENSION THRU THE SITE HAS BEEN INSTALLED UP TO DI M4,INSTALL TEMP.SKIMMER 1\4ttIN41/ \ \ . 9f- - ,-! / %� /,,, I `!! \\\\ / PAC oeb,'o4 \ .3 / \ I in SEDIMENT BASIN k2 WITH BAFFLES AND 2.5"SKIMMER EMERGENCY SPILLWAY SHALL BE LINED WITH AN IMPERMEABLE HCAIfOt/4�°' gip S • - I' 1/� • i' SSS .� '\\ a // O `_' �� ,/ // \ \\\\\\\\ �pa pe \ MEMBRANE(10 MIL POLY),TRENCH AND KEYIN LINER(MINI DEPTH)EMERGENCY SPILLWAY EL 8130(15 WEIR).INSTALL A °°'•°•• ,(y, OEqA \� - /� j /� gin K I \, I I.I.II AND MAINTAIN TEMPORARY EARTH BERMS[COG STD.440]TO TEMPORARY SKIMMER SEDIMENT BASIN M2 DURING r'� E /O • FOCA FP WI \ 1 � \ J CONSTRUCTION. 11E ltlT.rEGgE .suTl�eEv �/, '- .�;� aa' ►- '�. r/i � A wVAV �/ ,, �� �n/vv / vI 3 SEAL, c 1'B11RIl'L1 fl.O65TO 4801 \\ �� :1 � • (( /j% �� 1. 1 SELF INSPECTION(INTIAL: DATE: 1 1-2.1407 �• i. /III I/j/ v \ \ -{ 13.ONCE THE STORM DRAINAGE EXTENSION THRU THE SITE HAS BEEN INSTALLED UP TO CB MI),REMOVE THE EXISTING / PARCEL.11429i 1 PLAN TRACKING NUMBER 2023-4358 \� - ,,J, ` \\\ \ \/ \ 1\ `�___�- \ ASPHALT,CURB,53 WIAND TH BAFFITIESLES IN THEAND 20"KI TEMPORARY EMERGENCY SPILLWAY SHALNT L M3.INSTALL AN IMPERMEABLE �. \ iO"' ®`= O'2 '4c')\\\ ��� t/ / i SEDIMENT BASINM3WITH BAFFLES AND2.0"SKIMMER.EMERGENCY SPILLWAYSHALL BE LINED WITH ANIMPERMEABLE �9 �, \ • 1_ 1Y" d. I TEM 5TW11NBT ` \\ \ J"_p>- /"` \ \. ,11, - .0_, �Ge / // �\ ;� �21 I1 �y C_/ ��\\ \\\\\ \\� \ /�,� �mbQP�S,�y� \ ���\ yV� ��I MEMBRANE(10 MILPOLV),TRENCH AND KEY-IN LINER(MIN.1'DEPTH).EMERGENCY SPILLWAY EL.018.0(15'WEIR).EXTEND °j°H Ir61� `\,\,,`` EROSION CONTROL SYMBOLS LEGEND ZONING OPAL I / ( C\ T �5�/p0' I" v GEOTEX ILE LINER(MIRAFIFNMA])FROM THE EMERGENCY SPILLWAY/SKIMMER OUTLET TO DIMAS OUTLET PROTECTION f \ I�[ i l / \\\�\✓ 1---- \ - \ \\\ . JJ V0•/Y ^ / �-/J L\J� INSTALL AND MAINTAIN TEMPORARY EARTH BERMS[COG STD.440]TO TEMPORARY SKIMMER SEDIMENT BASIN M3 DURING l/ I\\ - g0(�1RFN` \ / / / ` �\�\\\\\\\\ / \vV// )� \�\`AL7i� '- jc/. J_i J L -- 1 S CONSTRUCTION. bl4/20�4 m EXISTING STORM DRAINAGE TO BE REMOVED INSTALL IBP BLT PpRB �6q 5 0 • L / \\\\\\\\ Ti \ _(f I MiZCM PROPOSED STORM DRAINAGE 6 ,r•, / / / \ ) \\\\ % \\ i / ®J \\9 SELF INSPECTION(INTIAL: DATE: 1 TEMP.SEDIMENT CONTROL LOG[COG STD.450] OR Y5 1C91317D]��IX • \ I55]I )\\\\\=-\=\ / //� 14.CONTINUE REMOVING AND HAULING OFF ALL DEMOLITION DEBRIS AS SHOWN ON THE DEMOLOT ION PLAN AS THE SITE IS TEMP.CONCRETE BARRACADE I �OO N \ fl (11 // / / ��I / \ \ / BS.CONTNUE NRATIONSDICTATE.INSTAL43] 1 Ui II/ I Tfa3XCH'&215LLL / / \ _ \ \ I/ EING GRADED. \ ` / - 1r \ [ 15.CONLEUEINN[ D. A STORAONSDICTTALALLED I � {g( N.I'DBI1P / \ WIRLETPROECTION[COGSD. 1]ASTHEST DRAINAGEISTALL TEMP.SILTFENCE WISro' IIYII eS. sRLVNY ELPl.-dSD \\\A'_.-\ \ `\` I 855930T3AS THE STORM 11----11 TEMP.TREE PROTECTION FENCE[COG STD.4481 O "SILDT FENCEAO] I /7\Ig.- • lg�p�yRlr�@ .617 AL. \\\\\\�\\\�\\\ \ III //\\` '\' ) pgpG] ` I \\II/r 16.INSTALL RETAINING WALLS AS SOON AS GRADING OPERATIONS DICTATE.REFER TO RETAINING WALL PLANS BY MODULUS, yJ TEMP.STORM INLET PROTECTION[COG STD.d311 PSl1,IG M I �I.A� `R11MNr iORM+ ul / \\~ 1 �i \ ,I\ � pFFIGr PLLC FOR DETAILS.BAFFLES pf i408 16 ME it I\ � 1 '\ ORAIB''b8/SffA'"Ac' \\\\\\\\\\@\ \\ ) I \N \` 1 \\ \ \ ,3 ( \I 1).CONTRACTOR SHALL ENSURE THAT EROSION CONTROL DEVICES ARE FUNCTIONING AND MAINTAINED DURING0M87WLNDBPRIL W iI I I \/ \ \\O \ 'NN 00F �' \ \ ' I CONSTRUCTION.CONTRACTOR MAV BE REQUIRED TO INSTALLADDITIONAL EROSION CONTROL MEASURES AS DEEMEDV A(((((((((((((((((((((a. TEMP.EARTH BERM[COG STD.4401 ,{1/\ / I ;ill i ( \\\\�\ \\\\\ ji'/ I e` ( -\..N \...\' \\\ -___ ``JJ / \ I NECESSARY BY THE EROSION CONTROL INSPECTOR121 GREEN VALLEY RD . TQ DRAINAGE AREA LIMITS T/J.T / `/'l� ° • \ / ✓���'\\ \\\\\\\\\\\\\\ ' ��" J / \\ \` \\\\\\ \\ \- T \\ 5 DISCHARGES ONCEDSTURBANCE HASBEGUN ONITOHE SREIANDING UNTILICOMPLET CONTROLS IONOFCONSSPECIFIED TRUCTION OR DEVELOPMENT n} tT /\`F `/�/ / / / ---- / \ \\\ \\\ / / `\y\ \ \\ \ �I--\ �I \ I AND THE ESTABLISHMENT OF A PERMANENT GROUND COVER. '^ EXISTING SANITARY SEWER TO BE REMOVED WUu I' h Y \� %/// _�`\\ I � �TI� \\ \�\\\\\ ip,\ \\ \`�\\\\\\ \_ _ ��-\� / �.� I 13 DURING CONSTRUCTION AND UNTIL COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND THE ESTABLISHMENT OF111 NI PROPOSED SANITARY SEWER W L Q)§ / / /// J/ [ \\ ____ \\ /\\\\ -- _ \ /`` \� I' PERMANENTGROUNDCOVER,THE PERMITTEE SHALLPROVIDETHEOPERATION AND MAINTENANCE NECESSARY TO OPERATE ,�/ LI ZONINS 2aY, / -/ / / \ 1 1\\\ / \ \ "`### I� I THE BTORMWATER CONTROL MEASURESANDALL EROSION AND SEDIMENTATION CONTROL MEASURES AT OPTIMUM �11 LINE LEGEND: ° W x l / yl 1 �.. _ ] /A s \\� \ •�'• � EFFICIENCY. 1B9.WORN INLET aLTFDlIOX \'f .6111 -.\ a// I / 4Lrg/ \-\ r__ ��\� --� r\ ` i \ \ cr�\ \ \ I 20.GROUNDCOVER WILL BE REQUIRED ON ALL DENUDED AREAS OTHER THAN PERIMETER BERMS,SWALES,DITCHES AND BOUNDARYIPROPERTY LINE \ /// \,� ESP \\ \ 11 \ NCO MR 431] / / / 'L\\ / p ) 6 �„ ' \ \ / \ 1 \\ \\ \ \ \ SLOPES STEEPER THAN 3H:IV WITHIN FOURTEEN(141 DAYS)OR COMPLETION OF ANY PHCEOF GRADING.RECORD DATE(5) / Q SETBACK \ - \ / [ VI"` �� \ \\\\ \ J( \ \ \ \ OF PROVIDING GROUNDCOVER. Qh 6 GAS LINE / / i•. • �� \ / l \I \p..\��-�i-�1\\\ /\\ ' I( \ \ ///,' ST �f \"1 y l \ \ \ \ \ \_ SELF INSPECTION INTIAL: DATE:E: 1 I III 1 0 IN WATERLINE 1311 ® /'I 'F R ' \ - ' LL���'P I I PX AIEf P11019'IYJX / _ � IF`-Ii\�\ 1\ 11 I' \I\ \ \ ( µ.1 J V -OM- OVERHEAD UTILITIESlir // / `. ,/ T \�1\\\,\\ "�6 /\ \J/�yD/ \ $.1/`Ii //� / -III\\ \ -do- _\ I \ \\\I' \\ \ \ 21.PROVIDE GROUND COVER ON ALL PERIMETER BERMS,SWALES,DITCHES AND SLOPES STEEPER THAN 3H:IV WITHIN SEVEN -• UNDERGROUND COMMUNICATIONS HSTOLL TEMP.SLT AYE / '�� / I \ p ♦ \ \ \ \ \\ \ 1 (])DAYS.ANY SLOPE INDICATED STEEPER THAN3H:IV SHALL BE COVERED WITH EXCELSIOR MATTING TO PREVENT EROSION Ey -Le- UNDERGROUND POWER K.sw..4184,4ro cam /I / J \ / \\ 11'F9" I / \\ ` µ? / \ / AFTER SEEDING !!IEEE VVVZ v / IG• / v ram, v� N v Q ,.rox6 Lamer s,�ns r /' ° `' A. / OI 1=I I(� �1\\ sy,,. �� Ill I I \ s�vAunx"6ne1R� -, /Rem..GNPp1uL x SANITARY SEWER LINE `�J q'q��--.�yy \ \ •154455,TER SELF INSPECTION(INTIAL DATE 1 Know what's below. r„.... ,,WAL /7 d- �• #4, / I \ n0 y \ I II \ \ 4 / 1E9NL PARCEL 949 22.ALL EROSION CONTROL DEVICES ARE TO REMAIN IN PLACE UNTIL THE SITE IS PROPER,STABILIZED WITH SUFFICIENT Z CURB AND GUTTER 1.11 what's ORAIH`GE5RSTMlID / 7V \ /// / 1J•` •- • \\ / �- -_ // / „""\ /It / ) I\ I1 I\' \ pTG .,. \ I / GROUNDCOVER.GROUND COVER MUST BE MAINTAINED TOADEGREE THAT PREVENTS SOIL EROSION AND SEDIMENTATION �i8��before you d19. /�','�: �il ►!� / // / I v v w.ax; Iv \ 1 l v 1 v AruLTMEs Q S \ _/ -_\1 -. 1{{+/ [ pyl \\ \ _ \\I \ \ \ \ WEES 23.CALL FOR AN INSPECTION PRIOR TO REMOVING ANY EROSION CONTROL DEVICES REMOVAL OF EROSION CONTROL < r•,(��� / /✓., ,F / HIV �- \ - Ili I I i L E 1 \ \ 3 DEVICES SHALL OCCUR ONLVUPON RECEIPT OF APPROVAL FROM THE EROSION CONTROL INSPECTOR.ANY MODIFICATIONS (2 v GENERAL NOTES: /// ON / '\• � � -' / I Ilsro \ 1I I 1 3 TO THE APPROVED PANS MUST BE PRE-APPROVED AND DOCUMENTED ON THE SELF-INSPECTION FORMS. D] /" � '��'0. �1� � _- I \ Q1y �� \ 26.ONCE AN INSPECTION FOR SUFFICIENT GROUND COVER AND THE SITE'S COVER IS APPROVED,THE SEDIMENT THAT HAS Zr Et Q Z m 1.ALL DISTANCES ARE HORIZONTAL GROUND DISTANCES UNLESS OTHERWISE NOTED 11 / tt-o• /'' .\,. k� -1\ /` - 1r ,,',7) � ^,{"'',: 1 111 L\ \ \ �L 4L . / - /\ SfP' •- /\ T�fM Ef( qRy I I \ \ BEEN COLLECTED FROM THE EROSION CONTROL DEVICES MAY BE REMOVED AND GRADE THE ARENS)WHERE THE Co w 2.SITEISSUBJECT TO ALL EASEMENTS,RANANDAGREEMENTS OF RECORD PRIOR TO THE DATE OF THE SURVEY ^�/5 / / I,' ,4 / r . 07/ _ .���//4.5,i Ac. / ii- \ \ �' ]ems \ Imo. -�\ -' '..'. \ \ \ \ MEASURES WERE INSTALLED TO FINAL ELEVATIONS AND STABILIZE.DRAINAGE STRUCTURES AND PIPE MAY BE REQUIRED TO O W lT 6. 47 /i.�� 2 's NOKERJMHt �\ _ /�,,•4p \ "L' ^-p �"yµ], III J 1 \ \ / BE VACUUMED TO REMOVE ANY ACCUMULATED SEDIMENT. ,, / f�4 %/' 0/2Y•,KE A , \ �M3RaAL �1 :. I -q,, ) \ \ \ / 25.REMOVE ANY ACCUMULATED SEDIMENT IN THE DRAINAGE STRUCTURES AND PIPE. 3.THIS MAP IS SUBJECT TO ANY FACTS THAT MAY BE DISCLOSED BVAFULL AND ACCURATE TITLE SEARCH // =q`;/G/�J�/�1/ - .1 m I ` . \\,.\ ORWNM.E AREA.#S`Y`\\K. -^'\ (I I � \ \ " "+ III /( \ \IXORIYE LO RBMMPAN9/STA&LI]ID i \ \ ���/ 26.THE PERMITTEE SHALL ENSURE THAT THE GENERAL CONTRACTOR/GRADING CONTRACTOR PREVENT SEDIMENTATION 4.ALLBUILDINGS,ANO SURFACE AND SUBSURFACE IMPROVEMENTS ON AND ADJACENT TO THE SITE ARE NOT -" -•%( [C�STD 43U / /^. ( �,\\ --• �I.LIIHt ? yyg4,,�,\�/7 \ \ I �4.c,• II\ \ \ I L `� ... \ ,� FROM LEAVING THE SITE BY THE CONSTRUCTION TRAFFIC.IN ADDITION,THE GENERAL CONTRACTOR/GRADING CONTRACTOR r tf `, AII�Tr \. T\\ \ \ 7140.0 ul \ \ \ I � e \ \ I \ \ I \,I't \ro,EWA� \ �_i\ SHALL HAVEONSITE THEMEANSTO REMOVEANVSEDIMENT TRACKEDONTO THESTREET.IFCONDITIONS REQUIRE, O NECESSARILY SHOWN HEREON • \ 5co/ 1�1-.\\\�^IF / - - /��' �\ ;p���MN'OBr1U\ �' - AI \ \ 01,1\ \ \ I / 1�0, \/� / EQUIPMENT MUST BE ON SITE TO WASH TIRES OF VEHICLES PRIOR TO ENTERING THE STREET.��w UAL POLE°` \� �f � � 1 \ 6PBVNr d4D \�"1 -YYI / \ \ / I l (� v 56F// ;, p,if S.SUBSURFACE AND ENVIRONMENTAL CONDITIONS WERENOT EXAMINED OR CONSIDEREDASAPARTOFTHIS • Q-Po� � ,� - � �--�, 2{• 3 ��� 4Y� \ \ \ \ \ �\ \ I II �" \ / 2).SCHEDULE FINAL INSPECTION TO GLOBE THE GRADING PERMIT. SURVEY.NO STATEMENT IS MADE CONCERNING THE EXISTENCE OF UNDERGROUND OR OVERHEAD CONTAINERS A a ,"\ _�� -- -)pr" \ \ \ \ \ \ \ I \\11 \ \ 20.FILENOTICEOF TERMINATION WIT/THENCDEPARTMENT OF ENVIRONMENTAL QUALITY TO CLOSE THENPDESNCG01 O .// r �_, ((/(f 1 j \1 \ \\ \ PERMIT. OR FACILITIES THAT MAY AFFECT THE USE ORDEVELOPMENTOFTHIS TRACT. \h` '' �� ��f((f(- ((((F„-,- /cW 5%i4oMW� \\ ,�V \ \ Tar.FARiHB�I \\ \ O.OS AL. I \\ /"/ ' � \/ W - .�.nttY(C((Ef E(__ (K((KF YF(((N,�v�r Uw sv.4a] A r 1.11 Ac.A A \ ffi 6.NO ATTEMPT HAS BEENMCE AS PART OF THE BOUNDARY SURVEY TO OBTAIN OR SHOW DATA CONCERNING •` / W \\ 3'� a � �!_-' ! _ _ ;yl'�((( IKE((Kf(K((y,Wyl "" (�K((KK(KFK. E((((((((((((�(((((((((((f(((((((((� ((\ ��,I r- 1 \ \\� \\\ \\ /, SOIL TYPES: L4.1 EXISTENCE,SIZE,DEPTH, OR LOCATION OF ANY UTILITY OR MUNICIPAL/PUBLIC SERVICE XN�C --z ` / W �T. _-_ _ -I�� ``v�^yyy'�''/((�``/((pryry1��',�''�[[ \ % CB(CECIL-URBAN AND COMPLEX,2T010 %SLOPES) iN FACILITY.FOR INFORMATION REGARDING THESE UTILITIES OR FACILITIES,PLEASE CONTACT THE APPROPRIATE �� - 3"Rv'- Y_ -" - - \ l t =- - u \ ` / / Ur(URBAN SOILS) aE G b_sA , P S „ AGENCIES. \• �/\ `�W� °sJ 7J�•T �._ A�(., �O ... �,� 3v v .QO /� IL e / 0 - 1,,N ].SURVEYOR HAS MADE NO INVESTIGATION OR INDEPENDENT SEARCH FOR EASEMENTS OF RECORD, � I _C TEFP'dLTF�YB "� I dLT-_ _ o -J?. 7' "Td T� ,..-,` " -I .- 6qppylI �Q \\ ` T ----ITT- n w [Coe sro.46D]AN) '0 /�� N� / o .r .�_ _s;©4 / / 1 m ENCUMBERANCES,RESTRICTIVE COVENANTS,OWNERSHIP TITLE EVIDENCE,OR ANY OTHER FACTS THAT AN /'1 - �`� �\ `��,f vEk2 TEMP.TIg FROIFL110�"olPw `a T / / / - y/ \ � - �,• /� RByyII �i 41f��NooEpoLE Ip.Ir Sm 4»]____ -�O -- ---- _ _ ACCURATE AND CURRENTTITLE SEARCH MAV DISCLOSE. -: h \ _ 5m�) )prL m_ p oWrl / /7 C✓ ��� --�- --� w�\ �\ ��`I \ IcD"BsTD.4�4e]_w -E+�-� / z / /_ - 1y // 8.THE WORD"CERTIFY"OR-CERTIFICATE'MEANS AN EXPRESSION OF PROFESSIONAL OPINION REGARDING THE // //$� \�\\ ���_� �_ -L-\-��D1P�� -� \ W\ \--��-��WBIS Sipe --R 'W \//4 / SIZE ADDS• lS FACTS OF THE SURVEY AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE EXPRESSED OR IMPLIED. --- ___ �_-_ _ \ W� RD (�1 UTILITY INFORMATION: // RU514 M _� GREEN VALLEY ROAD - e - - - _ -�'RZI=----- \ �_ -� -- ./ r= �.� PUBLIC RIGHT-OF-WAY VARIES - s / \ �/ 1 THE LOCATIONS OF UNDERGROUND UTILITIES SHOWN HEREON ARE BASED ON ABOVE GROUND STRUCTURES.LOCATIONS OF _- / / ` uNOERGROUNo UTILITIES/siRucTURES MAY VARY FROM LOCATIONS SHOWN HEREON ADDITIONAL BURIED UTILITIES/ `� \ MNORT}LO O G ,'N "a e"-' -- _ P�_[a_J,- ' ® _ -- GTRDGTDREGMAY6EENGDDN EKED NDEXCAVATIONSWERE DEDURING THE PROGRESS DF THIS6DR E TGLOCATEQ % - - I \\ - - - "" _ = o _ - SCALE: I•=6p' BURIED § EOsTONAND/OREXBTENCEOFUTLITYSERVICELNESTOTHEPROPERYSURVEYEDAREUNKNOWNANDARENOT �� � r 1 II �17� _ B"°" a II I1 f) II --7 0� \_ , \ �, DATE: 6/4/2024 OFTEN nOHING:AsuzYING.NO,OP MANEBNOGO R NTEETHAT HEDNDERGRODNDDTRnEBBHOWNOOMPRIBEUL GRAPHIC SCALE BUGHui WNAREARHEEXACTLOCATIONEORAN AS ICATEDED.OPTFDRHERDOEB CPT H.PHYSCIALLY CATDRRANT ONLY OSEUNDERGROGROON D PROJECT: I10721 'L UTILITIES W"��SIBL. PARENT FROM OBSERVED EVIDENCE OF ABOVE GROUNDAPPURTENACES UNDERGROUND D SELF-INSPECTION PROVISIONS FOR EROSION CONTROL: LATITUDE: 36.0929 LONGITUDE: -79.8179 '' SEE SHEET C-2.1 EXISTING CONDITIONS/DEMOLITION PLAN FOR RIVER BASIN: CAPE FEAR 6 = � J� DRAWN EIY: STY" L� FLOOD NOTE: THE PERMITTEE SHALL MAKE PROVISIONS FOR MONITORING AND SELF INSPECTION TOTAL SITE AREA: 11.971 AC. N REMOVAL OF EXISTING UTILITIES,STORM DRAINAGE,CURB, REQUIREMENTS OF THE NPDES N000100000 PERMIT.SELF-INSPECTION REQUIREMENTS ARE THE SUBJECT PROPERTY IS IN AREAS FLOOD INSURANCE BE OUTSIDE THE0.2 %ANNUAL CHANCE FLOODPLAIN PAVEMENT,ETC. REQUIRED UNTIL THE SITE IS STABLE AND THE GRADING PERMIT IS CLOSED. TOTAL DISTURBED AREA: 12.48 Ac. ( IN FEET J (ZONE AS EDATEJNONTHELATESTFLOODINSURANCERATEMAP,PANEL7855,MAPNUMBER3710785500J, SHEET G-7 F EFFECTIVE DATE JUNE 10,2007. 1 inch= 60 PC. �, ♦" 1 \+k. -' �`;w /-� / ti ) ?o lake`' / \\II \\\ \\�\ �)I \ op. REYISIONS • c� \ •\\ I \ 2° \`� �� ckcK ''J\J\ :.....:'2-.:1;r: ♦//., /STrNE DITCH —\ \ \\\ \ \\\ \\ [cos sro.asol 17..-. 914' 1: 7-0L. ..y44:11LiVill:A-47---111:1_74--/,A-,,, ♦� - / ' G. / / / \V \\ \\\ \\\\\\� / \ 7-- \V\�` VA DI 30' ■ ■ • 'i♦ Id�� l IV l l l l l l l/ \ V A A _ .. 81 I \ \-\ / a_• •n E(( I e- /f I// 1 IIII\ \\\ �` �� ' �;;\ TEMP.STORM IWPT PROTOION 1 \ \\\ \ 11\\\\ V q V ♦�yt / [coe STD.4311/ v A V v\ v A v ,` \ �"- ro /1/ \ 1 1 [ \\ \\\ \ = VICINITY MAP b �1 \ \..•�\. 111.. Cr, - � (\ \ / 1 �( \\ \\\\\\/ \\\ \ \ __ - -'' N.7.5 it Know what's below. , r �_ \\ \\` \\\\\\\\ L �� \\\\\ -, z` \ C811 before you dig. \ \\1 1'1 ♦ - ,� \ - p \ OWNER/DEVELOPER: p� Y 9 \ ' 1i. `* �' / ,a.t l //� / / ( \\\ \\\\\\\\ \ \ / \\ TEMP.BARkACArDE \ SEBR 801,LLC `^ 1 \ \ r [ - fN"' I / / \ \\\\\\\\\\ \ - _ f y/]// l 804 GREEN VALLEY ROAD \ W"_ , l� / I / /// \ / J /// GREENSBORO NC 27408 INSTALL TEMP.SILT FENCE I I ► ; c ' .6 TEMP.SKIMMER / \\ / \\\\\\N-- '\\\ _ \ /_- \J ISUITE 202 ' \ SEDIMENT BlbIN♦f, 1 \ \\ \\\\ I // \/ / CONTACT:STEVE SHAVITZ [CO6 sro.4ao1 AFTER EX GRAINASE ARFA=t7A2 Ac. / / / -- \ 1 \ \ \ \ \ __\\\ \ \ I )/ �\\ `/ /DRIVEWAY 15 _ 1., // / - _ \ __\ \\\\--- I \ /-�/f /v PHONE:(336)812-3314 I / / I \ \ -\ \\ \ / ''''NA\ Ni` (. EMAIL::reve@aeev.Ne.Qom Z s. �� 6FDTEKnIF LINER / / Z / / /�� MIRAFI Fwaoal \\ \\--_-- \ \ I V f\ ENGINEER: _ \ I \ /' ��/�� TRENCH EBALKFILL / / / ` \ - -- \\\\\\\�\\--- \\\\ �1-'\''I \ \\(\\ \ 4/ \\ III ' ���IFERII-¢TER(•1H DEPTH) // / / \� \ \\\\\\` -� \ \ \ `` \� \ \ IV I \ \ CPT ENGINEERINGSSURVEYING,INC. �ry��/\ / SPILLWAY fi.EV:BISA \\ I \ \ 4400 TYNING STREET ZTEMP.STONE/WIRE E ^�; ��I / / / \----\ \\\\\= \\\\ \ \ �``� IN / \� :i\, HIGH POINT NC 27263 �� �, / 15C✓EIR // \ \\ \ ' �� 1 \ \ \ CONTACT:STEVEN T WEBB P.EUl 1---. WET PROTECTION •� �. / / \ \ \ \ \ \ / \ 6sro.asp 6/o 1 1I \ •"7 // / / I \ \�\ �� \\\ i D 1 �/ \ \ \ \ \ ry �f 1 �rn• IIIiIu ,�25'SKMM£R A / / / + \ PHONE'.1336)0120000EM.310 IY1 li �(L1 \ / TEMW. LT FENCE `1I I V ORIFICE DIA \ - fI1 y� � v v �i WQ L r �1 1�. -\ /,,,-/,,,, a \� \ \ \\ f u j \ �o• •\ _ i Z Li � O� I f ¢ (6,�\ 7:\ :11: tea, .^� � �\\ \\\ \� . 1. .I \\ \ ^ / FX Kn.PROTECTON \ \ \ h\ \\ \F \ / \ \ - _ ZEEO / I v v I / / / vLt. � y V .eir ncnoE ��U1' p -r \ \ \\\ * / / I ' \\''1 1 ` ` 1 r Z Ca m� Pi o � sl \ / \ - � \ rc � /^� W�, l /!1vv t �� �o - I /v r �d v >1 EMm.srDRn1NETPROECna+ Al )� ik �_/ � 0i`—__ \A•1\\AAA AA\ \V �VR II \l\\ ( / -' v \ [COS STD.4311 \ / .>n ,�!.•-�7� // C_ \ �'• -\ /_� \� __---//--- \ \\ 1 \\\\�6\ (/�1 1\\ \I 1 I „uuu PI r 1 1I II II1q`\ A� \ \'I\ 1 1� \ 4i\ v"HCARO �/ !/ i n' I �c INLET PROTECTION 1 / F_ !o-i ° <@ �\ `•\ �� 1 II- II IA\ \ \ II III x �pE M /4 r 1A III 1 \ v 8 G55 �1'ems 14 �v ♦ �F IVVA a n TI 830 I I� SEAL / /11 \\ I \ I I 2Mp7 // / v vv $>D �Wr v v \`rtSs'� // 1' �I r I I I\\\I W\ \ 111 11 11 11 1 I I II // a , �/ e Os ' llll' \ ., \\ ♦ \ /,II I,` I I ` j 111 111\ I 0\ 149,41410 II III \ I I // r"'H..6.• .no INSTALL EMS.SILT FENCE `/ 1 1/ llFl \ I ,•-tT I v I I 11 1 I l \ n` /^ ♦ NI I I 6/4/2024 [GODS[co sm.a3OtB@1 Dcae I �/, / ' //p I 8 II o I L LOVED 1 / ,, I ,tlK i V AA vv A A '1: / N/ r 4 - 1 V I VILL 1� V III V I 1 1 V I A I THE PROPOSED STORM ✓ r �,. / I/ f 'v �v I / jj/ ��� b\ v v / / v 11 I V 1 A Ft \ II l 1 / // / 'y�y y. _v / NII IC III _ 11I \ II1 '-t - II I 11 II // N /, 1 / # / r I(�'I I I �� IIII IIII ' �� \III I I I \ LU ✓�d a/v ..,‘,/ , �7% / �� �• A\ F= iii �1YS" 11 11I I _ 111 / ✓/ro r . ��V ' b : AAAVAVA �/ I / 47 �• \ REMwoE Ex STORM' \ Q \ s ,2� 1 V'' y- Y J 1 I I // I / , ,,, /// A, /.. :..1\01.0,0. ....... 8.i. • /././._ ,, /7,„ ,¢help/ / // .�� i� �-`-- A w ._ 1 ♦ �� Q_ J / yr / y �\. / A •\ // i - iv, I - I 1 ♦ ♦ V A icnr CONSTRUCT! aaT2vre»I 1 V'� 1 �' ✓/ / /,. / se' v , I ' [cos sm.asv] 11 A A 1\I% O 4 / �' r ii _ a1e+rayslNkl ! � � ��� �\ I Ik' 111 1 / a ,P ',•///// A- / VV \ \\ h'� / VtA, Il DgAlw rd =rasa rw. �. �I v f � V A v a \ �., 6rrnE%nLE L1�{ '\\ / v f i r 1 _�� 1 III X u / �// �� / �� i v il� A I�M1RAFl Fwaoa) III /1 • ! u II I ?�e TErv.sTo�M 1wFr PROTECTION \ TREHca a a4GKFILL v I HI III A V 1 I I A 1 I 'I I Q A Y ) [C06 Sro.43I] 1 �� v f/ PERIMETER MIN.IDEP V / �� V v V I r A I I 1 1 r vE`y' ) I ,/vAA �� ,��� �,�` � Y:(..r,'ff(514Drc°6-TE;(6rn--- �� �, �� ♦ (w I I v v vI �/) v )v vlulvaI 1 \ A � I%% v R H � z / '"'i� 4Ertv.sy{F . TI �� / I -� �nI V �� Q E r ! I \ \ r \ \ \ � \\IIII z \ \ \ \eDOT `ii ` ,` < /Fff 8/O\ l _�y \ \ \ 11 \ \ \ Z-?--BOO-- - \/�' .\ IKf((FFFfffKFt�f; _ ` \ \ TBdP.EPRM 6Efd4 II \ \\ j I 11 \0\ \\ (�✓ Ulr r \ - `,. ff(KKf KKKIKKKKfeeut_ ♦ \ \ \ \ JJ 1� l \0 Z sI6NAL POLE -_ Kff ffKKflKf ' KKKKKKIKK f(f; 0] ♦ \ a [CO6 sro. \ \ ,� / I \ \ \ O Q w\w� ✓ 030) 41 . -��-_/''� \ \ KKKIKfKKKKKKKKKKK(Bme rr+ ««frKfrKfrKw frKfrKfrKfr«k r««««KfrKfr«----_ ----KK(KIr ai :�::, ♦ Kf (E Sf // o \ \O \ -_ )� ._.\-�,\\�.N'T r �, >, --_ \ ( _ \/1 KfKKf .;'(KraK(rKrrar(K(tK((Kr(KrrKrrarrK(rK(Krr(K(rK((ar(K(r�(fK(4)(41rtK(KfrKfrKfr(frK(4 rKfrKfrKfrKfr afrKfrKf r afr afrK( rKfrffrrffrrffrrffrrxrrffrrffrrffrrf6( KKKKKKKKKK ff(WW(61i6fKr -_ '� \ _ I- I- I. ��w�1 'Ix �. — —. << *_--- • 1� I\ '•!/y L -- r rem - - �T_ - \,i_, !,� - - =1 - .J�---" o �® 1 l \�\ /- Z \ J L , � • err _ V - lY i' - I ♦ ar 4✓ O !! I \ '" � T< < ^\'1� ,� IEM,.- � �"��--wr! �/-ro-'-c-�---- ---., -_ T �® _ _ - _ ___ sDo`F_- =''e- �- -� _� '_ _ f�,. __. . .-\� - � lJ� `•� Mci-`.� • �T11 \{�/� --'i - - - / �L_ Fo�F-�--FO-- rotes--2*O- �j�.T _yam ,� � al t �� om r ` —?��� to � --- �- _ ...Ai O 11 9J � � _w 1 6� v �-_� ram- � _- � �' lul_:_ �_ 1*_ i I y `'� . r' , - �v - -- _ T5:1 - �T 1�� - �� ILI �� w_ I' % 1 .,V" - \ - - �, -� Nil! ��_ . = 51LT FENCE _• ` z 1 �k -w A / -��r� - ---ce --- _ {III �' � � y 1 r �-`- k �� �'>T / /� [uu STD.a50[AND d- Sn uNKNowA / / 0 / / \ -JSy — 1� _.SILT / / / \� - TEMP.TREE PROTECTION `l T l l / N Q\/ / �J �� .7. ��!-I .1 �w----w \ [coo. EPRIOTEGnoN-———+.�\�—— ——�/—� \�—— —�/——\ ��-- \- mice[C065TD. ]- - / / / / /v �w - / (/ � -—r/ // _1 w- w----w-7 -w-- -. --w--- w — w i � �- \ FENCE[C0557D.\4aB] -w ---w-- \ w--- \ \-- \ \ \ \ -w\ -- -- • �a -VERIzoN 55 \ �\ .-„,,N iw -� \r'l---w _wL 1w---- ---_w-�__w- a ,5.:- I\ $" �� _NODE POLE _ - \ \ \\ \\ \\ \ 1 \ Z\-- - \ -W - -- - - --w --- --- \ ---- \\ BUS STOP \\ \\ 1 S \: Al �! ---- --- -- - ---- --_ -��--- �__\�__-�_\�-�, $-_' -- -__��- gyp\ \\ ---T-,� - 517E ADDRESS, (� ""� .. ���=� ,1' �_ - ---- - -_-_�/ \ •C • EI 801 SRIS34 VALLEY RD Q /�® y44, ��\ �� --_____--------- -- -- _- --_--- - ---_ --- ---_- -_-- s��-������������ -- ---- --- � \ 1-__-�_; 6RE1375BORD.NC A. f✓ a \@a.„ ``�--------------------- GREEN VALLEY ROAD------ --- ' --- SCALE: I'=so' _ PUBLIC RIGHT-OF-WAY VARIES 1 1 1 ��' MINOR THOROUGHFARE I ---=— ( DATE: 6/4/2024 1 GRAPHIC SCALE - - - - - y - _= L - PROJECT: If0721 LL 30 - _ \\ /p/ ��`- li A\III /i �_ PLAN TRACKING NUMBER 2023-4358 DRAWN BY: STW ( IN FEET) �\ III II, J 1 I 4 III I SEE SHEET C.7 FOR CONSTRUCTION SEQUENCE,NOTES,AND LEGEND SHEET G 1 A 1 inch= 30 ft. ° � � \ --------- \1. I �x '� i ENTERPRISE ROAD REVISIONS � �` 8 I I I ---_ �. 50'PUBLIC RIGHT-OF-WAY N 5 ��'i� N � ® I x j I I � v- p I I VCOLLECTOR STREET ' 1 1 11 �--- I Know what's below. _ _ �*-"� " � Cal Ibef01'e you dl•. II \ 11 'v.•♦ .. .. • .*.. irtan'.��w• r��" v - i - Mu -w—--'+ate--�---- 517E ' w ` w i _ =w / / Z 7- w w w -w- - w NI w w w e T Nr 7 \\ ww„TE' w� w w\—w ��w \ 6 1 x x � �� yf .ww. iim I i I x --84 /t TEMP.SILT FENCE \ \ 0 .SILT F�YE '8, - , �c I I\ �o \ \ \ \ `r .-51L E WrLET ' \ Icos sm.aso] \ \ \ \ \ — — `i \ _ - '1 [ sm.asD] — — I \.` III x II --I -�-- '�__-- _-_ , \— _ . - _ = YIGINITY MAP Tr / , / G J / \ oa \ N.TS III \ 1 / / / / / / -----1-_ I ."_,. .c / •--' 840._ 'L — —= 3= __ —— / / - VI I I /I / / I l } x / / �� aIIII I 1 , , ,1 I // I vv _ � �� / l \I 11, x 11 II I I ; �1 --- 4 I a II iI N I I I , -„, ,, 840— I II 1 EX.GRAVEL 1 I Q III /� TE :s®Ir�NT '- ( �V III z x III I 1 \ 11 o V\\ CON ROL Los_ g I I 9� I / N ��[coe 5m.aso] _ - -- -- III ) III l9 4 I j o � / 411 �� �J z Nry V © 1 III cs V A 1 / / In _ _ — �� \ I r LI ry r� x II IIII I k!L1itit 1u eASENr Q 55®I eoNrtoLTos vNEASE J/'Ij r JJ II LL __ _ - --_`==-I=____=_ -I — \\ ',;`\ _ l - - - _ -----_ ---_ rf •Pf \\ LI _ I \ 4 �� �.-�i.r Ste?-�- - J ' ,.,..,=� --- --- ��� \\ Il- --� �' a'� NO- \ f�MOVE E%.57ORa \ T\ \ \1 f'' �. III A— - vV Al A \ A A \ V A �� A�--yy ----� �N / 1 z /1 +IIVl " __I s Iiik=�yl o� &2O \\ \ \ \I I 111 V/1a357�//11; 1 / 1 z 1 _ I ` N \ \ 1 1 • & �b . }I �11I o y®I iccbs� I ill. II 4 �= � y=_ N ',� �/ °'� _�----�_ =-J _ \ '� ) = --1 I 1 1 I \,_,-�l \ / ) / 4 —T��T T 1 T Tay' di I d/ge"- I A I 1p /.�� �JI 1 < i It i !It �1I SFDIMFM BASIN«5 v 1 A v J 1III puuuwn `' �- DRAINAGE AREA.-u.94 AG. I 11 1 I ( // Ar;; \ I 1' ` I I I /1 // H2..4.1.01 i EEO TEXTILE Ursa \ / f i(c 1 (M1RAF1 FW404) IIII II I I II j I \ / ' 1 / '/ ' Y ® f g 4" IO),..1 AIL NIN I II RENC 6 HG rP1LL I /� / f _ � c r sk k ff/ PERIFETER(MIN.I' _\ \ I I \ / f QNN ORIFICE DIAL—� \ I k // ®f ff ___.-- - SEAL d� I 1 I �. SPILLWAY BFV.-BIRD I III\ I I I 1 \ III \ / `� __ }�l / - f s 2�� 7 I I 4 1 ��`.\ i e-`. 15 MEIR I III III 4 /�: C r v ,gyp 1 `,_ 41IJ 1 IIII yl �r"= V IIIIII I �/ ' H: . J_ I I I V /�� �• 6/4/2024 • �_ i _/il, pp \ .rd.'e � I III = 1 III 1 I •lAs, V/ \ I // :s .�Rca •i 8?.N. - Iv//11�11 / 1 I III \ \ III /A I+— /�. r • a. � 1 i r_LI_ _ , "�tr R�j r 41,„ / //A �/ �`♦� �i II �y�.•♦ _ ARIA EcDs STD.a5D] / / \ II III \ VIII I ' ` d. \y I f ♦• .���... III : R , i TEMP.EARTH EERd \` _ - M /• J _ /y J eke III 11r \ II, N sT \ /r T/♦. \, \ — — ♦• — -- -' Viii';'....• .�.®\ I 1 ICKSTD.m — `\(I / I" kcHA /'�o \ I ♦ - �v ♦ rs-»Li1 ♦ ' ®II 1\ I �(FF!!�t!!F!I!F!F!!r(((K ffl (I KflKflKflKf(Kf(KfI N, 0 /1 I , lI�sID$ \ I p Cf '-RRaOVE, 47. � , ` i - latto 9,nGy / /'b'` V- \ ` © / R1346VE Ex S7GRFT- -G r.f rr h+e • % / Q -\ ,/�. . r -- - \_ -= a` i •=j `N' O R�aOVE E7t s,_T•._ — ,�-t-r- • \ 7 0 / ` s • 4%, A v /�� t. . ♦ \ !cams D.,// - A<,- �� + I - 1 l= s d/ ) a fir' ).1 tf.`, - CCV/ v it - ♦ 1 X n I I[oil I 1- v Q /�-, // // \\�\� /� �°,I - /- ���2. � __- ♦♦• ((((EllHH(HH(F((H(llff(H((H((HJIFf((H(Offf(K((H(fi((K(!K(Itf(K=(K((Kf((f((K((Kf(tf ((K((K(!!F-(=K(!K(!.( "(EEC �' _ „ //i 11 \\val. z } �¢ _, Dom/ I� ll ♦ - , .. Z Q 1. /\ y / IEEKIF / \ •_ MI /za•RCP 1 - 71���i—��1 / �. Co r �J/ \�1 vM ' //, 3 ---' ' '� _- _ N. T If:, _FX,G p2 1 —III: O � A� ��/� / ts.� pier saalFpnl� 6 �' x / / - �83 F- !c�'sr //i 1 7 2 / .,� / 41 1 ,•`4.a' _� / / / / Ic�•sT \ _ Il/ �yl i ,/ �i + '`+ai / ( .sT / ,////i ____ ,sID�{E /4�'s1 s '9 T% �N�IeC 1,/7`1 ' �� i �,� a i ,,•4. /'/ // srD, ,,,/////i _ __°`„,_ �vv Si"e II /v 4.: 'Hy / } - 1 I I�IP, Ill k]y 'r Z p z i ; ,.// II - e /• ////I II II I /��' j / ^ � j� �_ a7 '� �� ///////////I11 1111 �)) ;/II11111 �'� uwI ' I� / ��%� � 4. A al // / ---' V / %(/(/////////// / 1 / 11,..., III I -rU q� i �i / � 1 ( d� IIL I II _ -- F- _ ill SC�°3zg�,T'h� .r�� l r',/ k �'• �.. / \ 111 / / /- _ \\ 1 \\\\\\\\\�111 I \ I II 1 1 ' • I _ - Q s" s /r: S� � I �v �111111 I .=11 2 ^tF �/ / {� 1' �/ V111 III 11 I �_� a,�sT ET�� a?i / ,J" ♦./ p /. vv 1 /A\j1111111111AI i I 1 v11 I / VIII L'-- 1 �����'� _ f/ '_: 1 I N. I I —. III 1 am la •, ao"- ��r/_ 1V jI� \/ / /11II1llV11111,I1 I ,-� II I j I Ij I I ��= = - \ === � `. . ,, III I II 11I I1 v A I ./ �i / / / I I I 1 1 \ \\ \ \�,\ III 1 1 I = LAN TRACKING NUMBER 2023-4358 i /. , d/•ir / \ _�i�� -- ----- I I \vv A "�^ 111 I I I L_ 0 �� ©) �— 7 ( I I I I L vv v Vv111 R i / :�" •J ' ♦ r - /'/ \ \ \\ \ 1 1 \ III 1lli 1 I 1 I SEE SHEET C-7 FOR CONSTRUCTION SEQUENCE,NOTES,AND LEGEND / a / �. • / /i lk:. 7 - / A I 1 j 1 III IIII 1 917E GREEN VA 3 J . ` / y x " OWNER/DEVELOPER: ENGINEER: gq vALLEYRD '<>_ / •@•✓.me,/ / DLO/ • ♦' / III /,0 \N / -�\ �1 III I I I I I I SEBR 801,LLC CPT ENGINEERING&SURVEYING,INC. •� �Q —t /`r A S // .( \ / 1 I I I 1 I I\ I 1 804 GREEN VALLEY ROAD 4600 TONINA STREET a' 4i I I 111 ill B/ -_�4 / / \ / I I I L \ I I I SUITE SB C STE ENT / . / — ^'--�_ Y ' III I \ \ II III IIII \� \ I I I III— GREENSBORO,NC 27408 CONTACT:STEVENT WEBB,P.E. �^ /�' '� © S )((*AU I \� \ I I 1 I I 1 j I L\__ 1 1 I I III CONTACT:STEVE SHAVITZ PHONE(336)612 6600 EXT.310 SCALE: I•.30' ♦ (!(!((!((!! !(!!!((!!((! ( .• I ----- I \ \�_ \ \ I EMAIL:nevew®Wten9 neenn9.wm 3• /�� � i // .7 S9 ` J ll1 I •I I \\ a \\\1 I\L 1 \ If 1 PHONE:(936)812-3314 J 1 \ i \\ \ \ \ III 1 1 EMAIL.SteeeGaeepnver.�oo DATE: ,�+ 6/4/2024 i�//�1� ��`'K(� ---�I III ' I \ ,\ \ \ \ \ \ II 1 III t .aQ y�' a N dl I I//1 III GRAPHIC SCALE i 0\ • �' 1 I ! N \ 1 1 1 1\ \ \ \ 11 PROJECT: 00 /' ,f_I �die �) I I 1 III I10721 CCI i /' 7. IG.--10A I 1 I I I1 \v I — vI 1 II I I II I I 11 I II ��� �� I / DRAWN BY: STW FsA. pi 1 / 11 1 0 60 0/`Rs�sr�y �d'� -�. tl of v I ♦ L- I 1 1 w \ / I G-� 2 ro�Ry �1_ s.% III 6 I 1 1 ♦ 1 _ _ $ p^�T / y�:481 --I--� �. 11.li w /, 1 R II A, \, ♦♦AV I / L�. �x FEET) / �, r inch= 30 et. SHEET A BORROW AND/OR WASTE AREAS: / ' OWN�ERLDDEVELOPER. ` REVISIONS �,. < ' : . IF THE SAME PERSON CONDUCTS THE LWO-DISTURBING ACTIVITY AND ANY RELATED BORROW OR WASTE ACTIVITY,THE \ \\\ 804 GREEN VALLEY ROAD RELATED BORROW OR WASTE ACTIVITY SHALL CONSTITUTE PART OF THE LAND-DISTURBING ACTIVITY UNLESS THE ,\ ` - BORROW OR WASTE ACTIVITY IS REGULATED UNDER THE MINING ACT OFI9]1,OR IS A LANDFILL REGULATED BY THE \ ,} sr�[•. \ J _ ,.'� DIVISION OF WASTE MANAGEMENT.IF THE LAND-DISTURBING ACTIVITY AND ANY RELATED BORROW OR WASTE ACTIVITY 67••",`1 "' 5. \ \ GREENSBORO,NC 27408 .` ARE NOT CONDUCTED BY THE SAME PERSON,THEY SHALL BE CONSIDERED SEPARATE LAND-DISTURBING ACTIVITIES AND Pr‘‘ A '. t' / t \i \ \ CONTACT:STEVE SHAVITZ � MUST BE PERMITTED EITHER THROUGH THE SEDIMENTATION POLLUTION CONTROL ACT ASAONE-USE BORROW SITE OR \\\ �y\ \\\ \ �4p-//� // ,1\ '` s4a \ \ PHONE:(336)812-3314 F � \ THROUGH THE MINING ACT. \ q\ // �i'// ✓� „\\ EMAIL:steve�Ceeprrver.com MAINTENANCE SCHEDULE: ... v .....-_-_-...,---1,---,,,, / / \\' \ \\ ENGINEER: - 1.)ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING \\ V �.. © 'j / \ \� \ \ CPT ENGINEERING B SURVEYING,INC. \ EVERY STORM EVENT,BUT IN NO CASE LESS THAN ONCE EVERY WEEK.ANY REPAIRS OR CLEANING NECESSARY TO 4400TYNING STREET _ MAINTAIN EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE COMPLETED IMMEDIATELY. .�Q O 0 \� b \ \\ HIGH POINT,NC 27265 V. T / h QQ�Py i�' r y�.NQV OY/' \ CONTACT.STEVENT WEBB P.E. - SCHEDSEEDED AREAS SHALL BE REFERTILIZED RESEEDED AS NECESSARY AND MULCHED ACCORDING TO THE SEEDING flf T % , � �Oz M JA \ �\\ EMAILPHONEneve6w®cplengneen9'wm \ j_ �� SCHEDULE. / /�O )f • 4 w'"5 !g, \G \ --- 3.)WATERAS NEEDED AND MOW T0314'T01'HEIGHT.TOPDRESS WITH 40 LB/ACRE NITROGEN INAPR.,50 LB.IN MAY,50 \...- /�o`��`' ,, 69 14•89„• \\\ \ \ \ P4\ x LBINJUNE,30 LBINJULY,AND2550 LBINAUG. 1111 � ' QO \ \kc( / Y bD _ s \o. /., / \ ct p t \ \ \ \ \\\\ i \ ;' � .��' 6 /„ ' \I\ \\l. \ I t\\, VICINITY MAP m / \� 1 ® (b e. . .\ / �'--/'�\ /i i v+ S'"', \ \ \ \ \\\ N.TS L �m i 1 v �- Ito„,* T \ \ CONSTRUCTION SE UENCE: OW // . Z', Ilt ••'�' // � v139 \ \ \ \ L/ 1.CONTRACTOR SHALL ENSURE THATALL APPLICABLE PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO ,r�pf7.✓ry��> NK / 0� � p ,� " /\\ ` \�� � S �I\ �; ', \\\\ LI �. PROCEEDING WITH WORK ASSOCIATED WITH THESE DOCUMENTS. T \\ N'U V / i DEPART NOTICE ENTOF E INTENT VIRONM NTALOBTAIN QU CERTIFICATE OF COVERAGE FOR THE NPDES NCG0I PERMIT FROM THE NC QW z A y � ,/�.\ "\'� , /l\ 3�c \i �LV \ \ DEPARTMENT OF ENVIRONMENTAL QUALITY. \ ' /' 1 / ��i '/ �,).\\\�V / ) .4 , ' • \ It* \\ 3.SCHEDULER PRE CONSTRUCTION CONFERENCE WITH OWNER ALL CONTRACTORS FOR LAND DISTURBANCE AND/OR \ .,NV > ; PP'. �' .;.`.'� / \/ 1, l AR" ry © \\ § Q \\ EROSION CONTROL,AND EROSION CONTROL AUTHORITY PERSONNEL TO DISCUSS THE EROSION CONTROL PLAN. \\ ,' 1 / / .•> / ` '\\ / 0- /- Y' \ _ \ \ -ry�� \\ 4.FLAG THE NEW CONSTRUCTION LIMITS AS INDICATED ON THE PLAN,DO NOT EXCEED PROPERTY BOUNDARIES WITHOUT tl • ' yya s '/� _i "'YYY �L WRITTEN APPROVAL OF ADJACENT PROPERTY OWNERS.FLAG THE CLEARING LIMITS AND VERIFY WITH THE OWNER PRIOR TO ®�YyA' 9 ,, .p�S11'`t` G / / �� p f yam" //�� \\$ \\\ I' \\ CLEARING. /'!�f N' O/C'',1TY _ y / _•/' //��\ I• �/ / "j��/ l is \ \\ •q \ S.THESITE CONSISTS OF AN EXISTING PAVED PARKING LOT WITH SIX(8)EXISTING DRIVEWAYS.THE EXISTING DRVEWAYS z ' l yp•� {' I\ // ,.yr 11\ \• / � �/ •� /� ' \ \ / \ \\\ Try, \ WILL EITHER BE CLOSED OR RECONSTRUCTED AT THE AREAS ALSO SHOWN AS THE TEMPORARY CONSTRUCTION ENTRANCES 1L� 6 Keeaa-- Pd'b _ \\ \T� [COG STD.436].THE EXISTING PAVED DRIVEWAYS SHALL REMAIN IN PUCE UNTIL GRADING DICTATES THAT THE DRIVEWAY BE �/ 4 v\ AIP �, � 51 f \\ y / � $� y0• \ 1 REMOVED AND/OR REGRADED AND RECONSTRUCTED WITH ATEMPORARV CONSTRUCTION ENTRANCE[COG STD.4%]UNTIL z in IV \ _ i � y `' \i � \ \I 11/ '/ ^k �� \ �(Y,� \�� / \�.�\ ,r` '"��j .V. \(\\\\\ 9� THE PERMANET DRIVEWAY IS PAVED. 2� ry(� \\ p(F > .iI /�!� 'N 9_` \vL. P•\ \ _7,.. _- 1\/ • .\ y `� / l l�et. �3 \� VVVe / \\ SELF INSPECTION(INTIAL: DATE: 1 ~IY1 ry ` f'� W 1K - \ R L_ RLV L I / '�P / \y\f, i- T'`� ` r \\I \ \ 6.INSTALL TEMPORARY SILT FENCE[COG ST0.490]AND TEMPORARY TREE PROTECTION FENCE[COG STD.ddB].INSTALL - Qy as P a'®\\ Y� /,'\T, ' / f ��' l ® ' j �� SI@, \ \ TEMPORARY STONEOUTLETS IN LOW AREAS OF SILT FENCE V Y `� \\ -,,,,.\\,,,,,,-gt �� •Ap§, b\ \ \ \ \ \ �M1a �1„-`\ \ �� �I' / C^'T• V� �4.Ob _� i ///) 4�% \ \ SELF INSPECTION IINTIAL: DATE: 1 Q \�\\�pZp / x. I t \ \ \ \ A %��{/ \ ., \ - �1 I / / -�® �yN �oyP'af4� ' ` \ \ \ \ ].INSTALL TEMPORARY SEDIMENT CONTROL LOGS[COG STD.00]AT THE EXISTING STORM INLETS ON-SITE.TEMPORARY N LL yB 5 I ,� \D _ \ \ /"'j/' ' \ - l 0'' / A \ \ SEDIMENT CONTROL LOGS TO REMAIN IN PLACE UNTIL THE EXISTING STORM INLETS ARE TO BE REMOVED. Q l) j k s -F V A _. saw l \\ L'• x / • \ , / \ 1 •, ( i1 ; P✓" 1� �dP P(,- / v e \ `\ \ SELF INSPECTION IINTIAL: DATE: 1 J -F� VVV� ,Ov.p1Jn� _.L� y �A(' \ / l 1'4O po \ � B.CLEAR AND REMOVE THE TREES AS INDICATED ON THE DEMOLITION PLAN. f�4 ` D�'` , dd �ttlif.,8 ..\� I w�" � r� / // i' \\4' \ SELFINSPECTIONIINTIAL: DATE: 1 FN rf- / s r-f `S N\\ aa\\\�1 •!O^ 1•ji_.4Y / > g.i.._� \ n' / \ \ \ 9.REFER TO THE EXISTING CONDITIONS/DEMOLITION PLAN FOR REMOVAL/RELOCATION OF EXISTING UTILITIES,REMOVAL OF 9 ;Z•N y� 0 pb i ram \ ;100,,\ 011iriliiiir' i/ �\ \ v \ ��y�gD om'\1 e ' ,F✓�Y� / /\ // 11\\\ \ EXISTING CONCRETE.REMOVAL OF EXISTING CURB.REMOVAL OF EXISTING ASPHALT.REMOVALOFEXISTING STORM E O_ % ^^ 4•v�h5 10,1:,,•00 'i y// \ \ \ \�\ � /, � \ ' \\ \\\ /�,r,, \\�r\\ \ \ . DRAINAGE,ETC.REMOVE/HAUL OFF ALL DEMOLITION DEBRIS AS NEW PROPOSED IMPROVEMENTS ARE BEING INSTALLED. LI R \I•A S.,,,,;„,N�q�S Jpg1-Cy, \ '/ ` �) ,- , , �\ �C/•_.. . ,y //J /\\ XXX \[ \\ 10.INSTALL THE STORM DRAINAGE FROM THE EXISTING CURB INLET LENDEW STREET THRU THE SITE TO \G \0 �'� _/ i \ caxclSE\ p`\ -k 'h\ Y \ �rj ( Il"I \ \ p A\p O0A � _ \ \ \ \ f '\.�?/\ \\`V aN \ CONNECT TO THE EXISTING CURB INLETS EX.C161 AND CI 621AT MERRITT MEDICAL PLAZA(1511 WESTOVER TERRACE). Z A as\c �'AwFP 0B �' ��A ' " \\ \ -j\\ (\\\\\ PROTECTION[COG STD.431IAS THE STORM INLETS ARE INSTALLED.INSTALL PARTIALLY -O /, \ / 1 INSTALL TEMPORARY INLET PROTECTIO \ \�\\\ �E1�34 P.dy � _ " \ \ ��`� \� \\ • /// �.�/ (\\l;\\\\ \ INSTALLED STORM SEWER PROTECTION[COG STD.443[AS NEEDED AS THE STORM DRAINAGE IS BEING INSTALLED. z '' p\A� '1� III \ [ \ � / �\� ��L� \ III I 1\I \� SELF INSPECTION IINTIAL DATE 1 a 4 kd / - 1vvrie, I R ` / ▪`\ 11.ONCE THE STORM DRAINAGE EXTENSION THRU THE SITE HAS BEEN INSTALLED UP TO CB 633,REMOVE THE EXISTING r� �\ )�' ' �� // -� "' \ \ \\�1 / I I \1 \\01 �\ ASPHALT,CURB,AND UTILITIES IN THE AREA OF TEMPORARY SKIMMER SEDIMENT BASIN 61.INSTALL TEMP.SKIMMER '�iJ s\ '�'� i�-• - �'�'� v7� • \\\\[ \ \ ` CrI ' \ / EYGAVATIf.IIA1 .� \ J / 4.0\I\ \\I I\ SEDIMENT BASIN 61 WITH BAFFLES AND 2.5'SKIMMER EMERGENCY SPILLWAY SHALL BE LINED WITH AN IMPERMEABLE \ \ ;, 1 -T N \ T¢G 1 \ It\I\I\\ MEMBRANE(10 MIL POLV)TRENCH AND KEY IN LINER(MINIDEPTH)EMERGENCY SPILLWAY EL 0160(24 WEIR).EXTEND \ p� 1¢�,. /// \\ r ' % ;�. \'. \\\ L y // \ \ r // I I I t- 1 GEOTEXTILELINER(MIRAFI FM.)FROM THE EMERGENCY SPILLWAY/SKIMMER OUTLET TO CB 633 AS OUTLET PROTECTION. v © \ � V1, . 4% ,1• \ ./// IN\ // 1 I/^ i / 1 j\\II�,• INSTALL AND MAINTAIN TEMPORARY EARTH BERMS[COG STD.ddO[TO TEMPORARY SKIMMER SEDIMENT BASIN MI DURING A' _ • a ;��"vN / \- \/ � J [ I CONSTRUCTION. �p \ V d� \ 18P •� /$.,rRw' IX ./ \ // / / \ \ A\\• �`K _ �IP'� y/\ / I I I SELF INSPECTION INTIAL: DATE: 1 / �� \ \ /pRMY!£ �. 1 /� \ S J \\ \\ �(N',�y\q�\ I A_r N_-/ /I S� 12.ONCE THE STORM DRAINAGE EXTENSION THRU THE SITE HAS BEEN INSTALLED UP TO DI.,INSTALL TEMP.SKIMMER O\4114610. � WMEN s \\ / \\ �Q � ,\ /� -- I JI \ 7 gyp" y ,may \✓\- / II rI II,10 SEDIMENT BASIN 62 WITH BAFFLES AND 25'SKIMMER.EMERGENCY SPILLWAY SHALL BE LINED WITH AN IMPERMEABLE HCARO/ / // \ iI MEMBRANE(10 MIL POLY)TRENCH AND KEY IN LINER(MIN 1 DEPTH)EMERGENCY SPILLWAY EL 0130(15 WEIR)INSTALL A w'e•. ,(y, O 2(Y SMMCR \ • � \ di 8\ / / / / /�j�// \ \/ 1 C � 9�6 p0 e --` i \� \I AND MAINTAIN TEMPORARY EARTH BERMS[COG STD.440]TO TEMPORARY SKIMMER SEDIMENT BASIN M2 DURING r* E /0 • ��. 1.9' qA \\`�`�� -+� // p0 vN',40 \ lI Z C .y PB:451.49 \/i, _ �*' &o-��'- / /. ] j ii�.j �\1 \/ \ 19tsurA \ \"_ �� I \I\I CONSTRUCTION. Q� Y 7HE M05FS IL GOIE 1�'d.�Lr ____ "..��� ' /i�'%i�i// \�� \/ .• � �\ - s\I 6611- .•./ f / \ Ta1P,IHIv Excnvena \n [LW 51D.9A] ( / SELF INSPECTION INTIAL: DATE: 1 NBMRIAL NQBPIdL ] 1\. �' _ _ // ,,-,,./ - (I//i j/ \ �\ xs MU.404690 aaN // _--- ---r/ I B. /.-2M 07 c r \ �Y '` -. \ 1�/ \ �� \ T. 13.ONCE THE STORM DRAINAGE EXTENSION THRU THE SITE HAS BEEN INSTALLED UP TO CBMI],REMOVE THE EXISTING ft. ff FLAN TRACKING NUMBER 2023-4358 \ 1 ' - ' C` / I III ( \ \ _ ",ct y� __ ---- i \ ASPHALT,CURB,AND UTILITIES IN THE AREA OF TEMPORARY SKIMMER SEDIMENT BASIN 63.INSTALL TEMP.SKIMMER \i' PIN 10,,39012 . '. '�4��11�lu' '• �aC�\�+ / / III]\i\\\\\ \�\\��N -� „rry�' � / SEDIMENT BASIN 63 WITH BAFFLES AND 2.OrSKIMMER.EMERGENCY SPILLWAY SHALL BE LINED WITH AN IMPERMEABLE �9 f3Pi6TOrEc R" `. / F.u.„,, }_/7 r ,, ,/ 1� ' asa II II s\ \ /----,,,*QNo'I - Vl MEMBRANE(10 MILPOLY),TRENCH AND KEY-IN LINER(MIN.1'DEPTH).EMERGENCY SPILLWAY EL.018.0(15'WEIR).EXTEND � ``, EROSION CONTROL SYMBOLS LEGEND ,1 kA1w Nv eJ �' \ \- a'ee'�i.'/ \ \ ,- r///Hp•....in19"1•A PELAE A tl ( / \ "• A \ .F�` pg,gym / \ /�\ v GEOTEXTILE LINER FW404)FROM THE EMERGENCY SPILLWAY/SKIMMER OUTLET TO DIVAS OUTLET PROTECTION. [1/ I I �I l -iI l /�� \� @ _ p- Y LI INSTALL AND MAINTAIN TEMPORARY EARTH BERMS[COG STD.440]TO TEMPORARY SKIMMER SEDIMENT BASIN 63 DURING mxmaaa PROPOSED STORM DRAINAGE f I- / n / ` G •'LO F y; 8 \ `, / _i J I CONSTRUCTION. 6/4/2024 1b0. a \4 Aos no vTev.Brad \ ,d,"\,` \ ",, 0 Ss _. � )r J \ !f I x ffi TEMP.SEDIMENT CONTROL LOG[COG STD.4501 \ a, s}H - J ,�_ NbTL110N'' \ \ `�_ Y; (+ H \...�ppp/y/// -/ SELF INSPECTION(INTIAL: DATE: 1 = = TEMP.CONCRETE BARRACADE •{'2 I I•� \ \ / /`�' z / [3Za 1D.4N \��\ `_'/'r // ® - _ _ �I / J / /. _/ / ; / \\`�\\\ Pp�.PI/ra 14.CONTINUE REMOVING AND HAULING OFF ALL DEMOLITION DEBRIS AS SHOWN ON THE DEMOLOTION PLAN AS THE SITE IS TEMP.SILT FENCE[COG STD.430] '� •i / / / / / \ A\_ A\ \ !r / / � _ BEING GRADED. ,1, nhRtew LUMEN b ° I I / \ \ t orE r L4--I TEMP.SILT FENCE W/STONE OUTLET[COG STD.430] @� rJ \ \\-A \N.4 441 / / 5T R 15.CONTINUE INSTALLING STORM DRAINAGE AS SOON AS THE GRADING OPERATIONS DICTATE.INSTALL TEMPORARY STONE/ �/� TEP.STOIH WIRE 941 I�1 ' / I' 189.. /ApS Lg / F _-YI-\�\\\\.- \ , 'B \\/ t, 1 PARCEL:93 1 J �\ I WIRE INLET PROTECTION[COG STD.431]AS THE STORM INLETS ARE INSTALLED.INSTALL PARTIALLY INSTALLED STORM Vl - TEMP.TREE PROTECTION FENCE[COG STD.448] MIEf PROIELIYAI ``9' / 'RR/ 5 8'N- I \\__-` 14y,}\ 1F y �' TEMP.STORM INLET PROTECTION[COG STD.d31] �'00 ,t/\t•q / / / T / BIB- \\\\\\_ .,; .e,A ( \ I r- SEWER PROTECTION[COG STD.443]AS NEEDED AS THE STORM DRAINAGE IS BEING INSTALLED. Q BAFFLES O [100.LO55Tp?qJ0] I Ip��- \ / / } - \\\\� 'r\ 0135 '; "�y/ \ .N' \-) 30 PIN P525 \. / 16.INSTALLRETAINING WALLS AS SOON AS GRADING OPERATIONS DICTATE.REFER TO RETAINING WALL PLANS BY MODULUS, T I \ / _ \ \ ( / 1� '\ ZONING:069� Z PLLC FOR DETAILS 1 TEMP EARTH BERM[COG STD.440] h L /m L (_ - IVY ! E OFF I 1).CONTRACTOR SHALL ENSURE THAT EROSION CONTROL DEVICES ARE FUNCTIONING AND MAINTAINED DURING PS61,P6 NM ,� m A •„ \. \ I \ I>; OFFICE Q- !W-(W((W((W((W(WW lxewssx.eaE Nil \ \�- _ - IAps.�B ,\\' ,. \ \ \\ 1 \ ue,E ! \ .�����i. DISTURBED LIMITS bUIC.L IL COL W i I `� �J� ' 1p AGS r34 \ \\\\ \ sa ✓� \ \P� 1BIp,IMIV CN00V61I34 1 / �\ I CONSTRUCTION.CONTRACTOR MAY BE REQUIRED TO INSTALLADDITIONAL EROSION CONTROL MEASURES AS DEEMED .^ 3 (1 ] A \ \• � .3� ryM 1 NECESSARY BV THE EROSION CONTROL INSPECTOR. 0 �R{� PROPOSED SANITARY SEWER 7 1 T i I Aos_, A\ \� \ _/ iiii PROPOSED EXCELSIOR MATTING PARCEL:19430 hy.g � 1�I . I\ J //BulldlinMB ADS /'gyp \ ice'/\\ \\\\ \\\ \\A\ / \'\ \\3t�`, \ ` I� \ 5 DISCHARGES ONCEDSNRBANCE HASBEGUN ONITOHE SREIANDIUNTING LICOMPLETOIONOFCONSLS DTRUCTION OR DEVE FOR LOPMENT CONCRETE WASHOUT PG 49 V' I' F/ INIS, ]� \ �/ / ---- \ \\ \\\A\\\ V - i \+ \ /' \\` \I--- - `` �I \ I AND THE ESTABLISHMENT OFA PERMANENT GROUND COVER. ILI ■ INSTITUTIONAL W_,QII � ] \ \ TFE ats.ss � ALL 5nJW91NE15OTPJ \ \\'\\\\ s/ -' � J �'� I 19.DURING CONSTRUCTION AND UNTIL COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND THE ESTABLISHMENT OFzUSE Q)� 1 \s / [CO6AD�] F,.„,teas \\\ \\J `/'•\ Oq0 \ �IA - _ \ \-\ I1 PERMANENT GROUND COVER,THE PERMITTEE SHALL PROVIDE THE OPERATION AND MAINTENANCE NECESSARY TO OPERATE _t g 2aY /,(l -1 v \ � I \\\\\\\\ ��\ � Tp� THE STORMWATER CONTROL MEASURES AND ALL EROSION AND SEDIMENTATION CONTROL MEASURES AT OPTIMUM T -I Q QQ/ (/`% / / !\ \�,I /�� §:I \,, / \\ l ` ~T/ )- \ 1 EFFICIENCY. LINE LEGEND: I Q / 'f / v 3�" =� / � 1 //' \\,, s\�' � �- \.�`\ � A\ \ \ 20.GROUNDCOVER WILL BE REQUIRED ON ALL DENUDED AREAS OTHER THAN PERIMETER BERMS,SWALES,DITCHES AND l U J BOUNDARY/PROPERTY LINE TEHR STOIE/NRE I / ADS.H ] \ \�\\- \ SLOPES STEEPER THAN 3H:IV WITHIN FOURTEEN(14]DAYS)OR COMPLETION OF ANY PHASE OF GRADING.RECORD DATEIS) 'M f O -- /I \ \\� �, \\.6 si . I ('kt I \\^ \ I OF PROVIDING GROUNOCOVER. 811 NR Flb FLp / / \\ �� DZ O .41k ---v GAS SETBACK ucB aro.au �� •/ R�J Ji//JJ;)))�9 \\ / II / \ 0:), p• , \.`' 1 - \\ \ \ V Z 0 Q IN WATERLINE ® /' ,FT�{)/I' S a( - A \ • ] _ -_ \� I�\ \.I429 ] \ 1V \- \ \- SELF NSPETIONIINTIAL: DATE:E: 1 V -dW- OVERHEAD UTILITIES /�E/ n5".��\\\I' C'' \ i 4�ffi LB\P wtl 1BIP.MIV EXCAVATION\I \ 21.PROVIDE GROUND COVER ON ALL PERIMETER BERMS,SWALES,DITCHES AND SLOPES STEEPER THAN 3H:IV WITHIN SEVEN O !'-1y' = _ �j'� \ I R 1 . \ -\ PWNB W41[Qb1RILTON \ 1 (])DAYS.ANY SLOPE INDICATED STEEPER THAN 3H:IVSHALL BE COVERED WITH EXCELSIOR MATTING TO PREVENT EROSION 11/ NI- -• UNDERGROUND COMMUNICATIONS /- '; ' \ I �§I1\I\1 1I tI',1 �TAMNB W4.N\ \ \ / AFTERSEEDING. IL !!I.EEE^ Q/ -U!- UNDERGROUND POWER /a / J1. )AS .�� �" _ A> \ �, / \ 1RNIQNtfAlIYAtNlr V / O `� SANITARY SEWER LINE 1�'91T MICE Y£ �� I n \ I I '\ \ eT�IVAuer FNbneIT\ T SELF INSPECTION IINTIAL DATE 1 Z Know what's below. /- /4118=11' � AI s I I , FHR 9LLEEYRD R ▪9492.ALLEROSIONCONTROLDEVICESARETOREMAININPLACEUMILTHESITEISPROPERLVSTABILIZEDWITHSUFFICIENT $ Z CURB AND GUTTER [COi S1D.M01 / / '/r / - >� , I// _ (/III\\ I A- II I I 0/�QF�[IQ71NL \ Ip ,B.Vi93a394{� j. d I I / 52GROUNDCOVER.GROUNDCOVERMUST BE MAINTAINED TOADEGREE THAT PREVENTS SOIL EROSION ANDSEDIMENTATIONQ1I� (�\j Call betoreyou d19. / � • &n I 61 H I 20/11,6 A 3 E' ATC LLFOR -I L / �j \ I I I \ A \ \ PEES 23.CALL FOR AN INSPECTION PRIOR TO REMOVING ANY EROSION CONTROL DEVICES REMOVAL OF EROSION CONTROL -I ILI GENERAL NOTES: / Dry /// I ,� \:A - ///J l / I Dr ''I I CAL OFF CE I \ DEVICES SHALL OCCUR ONLY UPON RECEIPT OF APPROVAL FROM THE EROSION CONTROL INSPECTOR.ANY MODIFICATIONS j it •S` / / ( \ I 3 1 TO THE APPROVED PLANS MUST BE PRE-APPROVED AND DOCUMENTED ON THE SELF-INSPECTION FORMS . O {!• L, ,,•�. •q , llll\\ \ '/ • (I 1 II \ -.]I III I� 1 \ 1 24.ONCE AN INSPECTION FOR SUFFICIENT GROUND COVER AND THE SITE'S COVER IS APPROVED,THE SEDIMENT THAT HAS XD 1.ALL DISTANCES ARE HORIZONTAL GROUND DISTANCES UNLESS OTHERWISE NOTED. 1 / &" •• `l' I I I \ 1 Q Z \,� . • -• - \ BEEN COLLECTED FROM THE EROSION CONTROL DEVICES MAY BE REMOVED AND GRADE THE AREA(S)WHERE THE O W 2.SITE IS SUBJECT TO ALL EASEMENTS,RAN AND AGREEMENTS OF RECORD PRIOR TO THE DATE OF THE SURVEY. ^� / ' / • -�. `_� • / . �-\ - I \ 1 \ - MEASURES WERE INSTALLED TO FINAL ELEVATIONS AND STABILIZE.DRAINAGE STRUCTURES AND PIPE MAY BE REQUIRED TO O ]]J 111 lT / / //� � '� /2S' ' TB4.SKIM Bt 'fir - t• � nf• �\ l / I '0 I \ / BE VACUUMED TO REMOVE ANY ACCUMULATED SEDIMENT l'U b . _ f y«3' ..re pla \ RA5N.1 \m✓/\ \ 11 iiimilwr -- // i,ra L1 I \ \ _ / _ 3.THIS MAP IS SUBJECT TO ANY FACTS THAT MAY BE DISCLOSED BY FULL AND ACCURATE TITLE SEARCH. / /�/O�// "�' / �i' \ DRNNAEE ARE.MIII 9Ac. ( `-Jl +. Y / \ 25.REMOVE ACCUMULATED SEDIMENT IN THE DRAINAGE STRUCTURES AND PIPE. IV // �'(•/" ,3g1/ / 1 \ \ ���� A> �\ \ \ ` i \� a ` / i \ \` -� 26.THE PERMITTEE SHALL ENSURE THAT THE GENERAL CONTRACTOR/GRADING CONTRACTOR PREVENT SEDIMENTATION Z 4.ALL BUILDINGS,AND SURFACE AND SUBSURFACE IMPROVEMENTS ON AND ADJACENT TO THE SITE ARE NOT �V / ,f77 / Y/ I y' I /.. 1\_I.' \\ / _ _ \ g \ /', \ 111111! /WFf F .' il` I _/1 SHALL HAVEON SITE THE MEANSTONREMOVEIANV SEDIMENT TRACKIEDONTO THESTREETN FRCONDI�TIONS RIEQUIRETRACTOR Q ��jj/ TTI Sy NECESSARILYSHOWN HEREON Op0 /( .fiLT T9lLE I .�II� / / 1� \ "1J -- \ \4 T' \(3.51a,M0 1� E 1• \ \ \ O •\,...6,AL VOLE 'el /(/ t -��� I \ O. `m \ L I/\ � j Dy 01 h� I11_ ( \/� i EQUIPMENT MUST BE ON SITE TO WASH TIRES OF VEHICLES PRIOR TO ENTERING THE STREET. S.SUBSURFACE AND ENVIRONMENTAL CONDITIONS WERE NOT EXAMINED OR CONSIDERED ASAPART OF THIS Q b p�""" fe '��:_ o E< -\ \ \ �/ \ \ ( k Vr 2).SCHEDULE FINAL INSPECTION TO CLOSE THE GRADING PERMIT. •ate\ 7 6�1, - "`....' 63. Tso \ \ 1 ,�` .� • I ( • z SURVEY.NO STATEMENT IS MADE CONCERNING THE EXISTENCE OF UNDERGROUND OR OVERHEAD CONTAINERS EN `/ \ d (- -_ I "•„ - //lam �rl \ \\ \" \\ �T'1 At.' ///� y \ \ -1c\\ 20.FILE NOTICE OF TERMINATION WITH THE NC DEPARTMENT OF ENVIRONMENTAL QUALITY TO CLOSE THE NPDES NCG01 OR FACILITIES THAT MAY AFFECT THE USE OR DEVELOPMENT OF THIS TRACT. 'cps`` \\\r� rA\� �� _- 6 `� F/// \, \ I Bro.�//' \ I/ _�� \ \ '�`Y;�� I\\ \`, \\\ \\ ' ��\ice \/ PERMIT. O O.NO ATTEMPT HAS BEEN MADE AS PART OF THE BOUNDARY SURVEY TO OBTAIN OR SHOW DATA CONCERNING I\ \ I - --_ 9 '(/IWfWW yu• . - Apr `J % \ z EX.ISTENCE,SIZE,DEPTH,CONDITION,CAPACITY,OR LOCATION OF ANY UTILITY OR MUNICIPAL PUBLIC SERVICE ` /� ���M:,IJ__ ---- i�-` ! a - ��� � � ----- 'k� _\ice' rT.r��LI� / F�+'a' I I\ I ` \\`/"/' \\. % CIBQ(CECILIL T-U\/RBPAELWDCOMPLEX,2T010 %SLOPES) iH FACILITY.FOR INFORMATION REGARDING THESE UTILITIES OR FACILITIES,PLEASE CONTACT THE APPROPRIATE ` � W __\y� may' TO � -29•RCP- -- --_--- %-_AN-'� ,..A,...._Ir� S • .,5 r'itir � - u \ `�' /%(/ Ur(URBAN SOILS) IZ aE v� -"i -� ",es.s3rrseB�-_-�- tco.Ez L� _ -__ _ f'A�'r_ 1C A. 4':''' _ Z I' 1- -I, tt-s/''°� _ ILI AGENCIES. -- _ 4_ aG�q �. J18F •Y ��� D '\ �\ /_ S ).SURVEYOR HAS MADE NO INVESTIGATION OR INDEPENDENT SEARCH FOR EASEMENTS OF RECORD, • 44 \ S1' � Td yRLV- • 4 I_ /� 'QQ'}} ENCUMBERANCES,RESTRICTIVE COVENANTS,OWNERSHIP TITLE EVIDENCE,OR ANY OTHER FACTS THAT AN I9>,� �\ \\_ - h- _ [LOGSlO.q) IT = ' \ . mT / Is _ © _ '/ �f /�� JRzonw TeR.,�TvolEcnor z.of ---'.-2-i_- �/ ;1.�/ To .. __y__ yyt C.. rcrc11 ACCURATE AND CURRENT TITLE SEARCH MAY DISCLOSE. // h \ ��\ Op[„,.._� Ti3CE[LC651D.4., W� - - ��i _ / [ Sro • '1�-40 /� / /-1 y/ / RETAINING WALL NOTES: \ ` ---` � --�- \ __\_ \mI \ --1,-Mee lws STD.945]-W , OMl W' t \ __/ // y_\ _�j"OP � -� W--\--N �-W Wes- ==q=l=- / i 1.PROPOSED RETAINING WALLS ARE FOR ILLUSTRATION PURPOSES ONLY DEPICTING CHANGE IN GRADE REQUIREMENTS. O.THE WORD"CERTIFNOR'CERTIFICATE"MEANS AN EXPRESSION OF PROFESSIONAL OPINION REGARDING THE ,} ( .\ ��-� t _� =e-_-_-_\ \�` _ \ \ -�\ WS STpP �\ T 517E ADDFJ. lS FACTS OF THE SURVEY AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE,EXPRESSED OR IMPLIED. 4 a/ "-:.�\ =- -_ __ qTy -�- \ \ \ ,' / CPT ENGINEERING AND SURVEYING,INC.IS NOT RESPONSIBLE FOR RETAINING WALL DESIGNS.REFER TO PLANS BY OTHERS 801 GREEN VALLEY� IN - --=-_-7-=-- -v-_e -_ C� _ _ - \ ( r -�-_ / FOR RETAINING WALL DETAILS. UTILITY INFORMATION: // ' `- ----- GREEN VALLEY ROAD 4_- - - R3=----- d 1 I L.-_ • / (1 � `� -=s• 2.ALL RETAINING WALLS OR RETAINING WALL SYSTEMS WITH A CUMULATIVE VERTICAL RELIEF GREATER THAN SFEET AND r= ..................... - PUBLI C RIGHT � l THE LOCATIONS of UNDERGROUND UTILITIES SHOWN HEREON ARE BASED ON ABOVE GROUND STRucrvREs.LOCATIONS of ��\ "� "' -�\ MNOR TfJ_O O �R�IES N - T £w ��i� % \ ALL RETAINING SYSTEMS WITH ACUMULITIVE VERTICAL RELIEF LESS THAN SFEET AND LOCATED CLOSER TOA BUILDING UNDERGROUND UTILITIES/STRUCTURES MAY VARY FROM LOCATIONS SHOWN HEREON ADDITIONAL BURIED UTILITIES/ �� _ _ ----- .�� =u.,s '"" -- _ ---- 0- ,0- -_� THAN THE VERTICAL RELIEF,SHALL BE DESIGNED BY A REGISTERED DESIGN PROFESSIONAL,AND REQUIRE A SEPARATE - SrRUCTURESMAYBEENCouNTERED NO EXCAVATIONS WERE MADE DURING THE PROGRESS OF THIS SURVEY TO LOCATE BURIED \ - % \\- "" -" - --- .- - - _ - Q _12_ \ BUILDING PERMIT AND SPECIAL INSPECTIONS SCALE' UTILITIES/STRUCTURES. -___ \ -_r \ IR_�. TON AND/OR EXISTENCE OF UTILITY SERVICE LINES TO THE PROPERTY SURVEYED ARE UNKNOWN AND ARE NOT N \\ II I- Z 11 II �17- -- - \ \ 3.ALL WALLS SHALL HAVE FALL PROTECTION BY A6'HIGH SAFETY FENCE. DATE: SHOWN a 11 II f) II - -1 0� \_ , \ \ \ 6/4/2024 ND lCP MAKEBNGGD R NTEETHAT HEDNDERGRDDNDDTILI EB,HDWNDDMPRI,E L GRAPHIC SCALE PROJECT: CPTEN nING„uRVEYING. 1101-21 BUCHDT SHOWN UTILITIES BHowN ARE IN THE EXACT LOCATION AS INDICATED CPT HA,PHY,GIALLY LOCATED ONLY THOSE UNDERGROUND BUILDING PAD CONSTRUCTION SEQUENCE: SELF-INSPECTION PROVISIONS FOR EROSION CONTROL: LATITUDE: 36.0929 LONGITUDE: -79.8179 60 D 30 60 120 24 UTILITIES WHICHRE VISIBLY APPARENT FROM OBSERVED EVIDENCE OF ABOVE GROUND APPURTEN E RIVER BASIN: CAPE FEAR DRAWN Si': L' FLOOD NOTE: 1.BUILDING SEE SHEET C-2.1 EXISTING CONDITIONS/DEMOLITION PLAN FOR THE PERMITTEE SHALL MAKE PROVISIONS FOR MONITORING AND SELF INSPECTION STW N 2.BUILDING B REMOVAL OF EXISTING UTILITIES,STORM DRAINAGE,CURB, REQUIREMENTS OF THE NPDES NCG0100000 PERMIT.SELF-INSPECTION REQUIREMENTS ARE TOTAL SITE AREA: 11.971 Ac. THE SUBJECT PROPERTY IS IN AREAS DETERMINED TO BE OUTSIDE THE 0.2 %ANNUAL CHANCE FLOODPLAIN 3.BUILDINGA PAVEMENT,ETC. REQUIRED UNTIL THE SITE IS STABLE AND THE GRADING PERMIT IS CLOSED. TOTAL DISTURBED AREA: 12.48 Ac. ( IN FEET) Q F - (ZONE X)AS SHOWN ON THE LATEST FLOOD INSURANCE RATE MAP,PANEL 7855,MAP NUMBER 3)10]85500J, 1 inch= 60 PC SHEET Gam/ I EFFECTIVE DATE JUNE 10,2E07. . VVV ,\ I- i� \ft''' + ,V \5w t �1)) Sa \q. 1•' jj = ? *\ itrillOik REVISIONS \ ) •• \ c9/ \r,,3° / • --- 1--I\ / II''.1fin'A .Aiiiii \ 7 15/q ' 1 / • A• / _ / - ) r 02 l�, �I I �'»W • // / // // / A ,'� W \ AAA V\� V -- - - � 4 �' t .sl v _� td:,---4-&-e;. _ „ A .�k i�:S - / I i, i//// /,i/ AVA AV'1' 7 //,,,,, / \''" \ ' "vac* , �\ m+P INwE+�avAnoN /11 `ICO65TD.4901 A- 81.- 81 /� // e° 1 / /! /i i i j'/ / - v` �/ AA AVAAVv vLwN5 WALLfTRLrTION _ Alp lit, v A �" . �a /' ♦ • '.,i �" / l,� / '// // iii'// V AA AA VA v,.A AA 1 6 \ / ♦ ♦ \ ( //'// ' ,` \ \\\\� \ RETAININb WALL•3I • \\811 \ I \` - DI 3O• 7■ ■ ■ ■ • -. / »'' / (I% �0 AAA V f _� �� �n■ • ■ ■ �1a A AA S \ V DI p3 go" .Ly gyp./ // m-a- / A V\\ V A V A V A�\;:\ \ �17^�w P� ti1� Is Rca..�i Legg v vvvv ,o v ✓ vice _ i/ VIGINI • = \\\ C. REnININswAu»b m n N ♦\ ra' v y \� MAP �m / kill oI n.eoKnow what's below. \ �\&g _ \ / �G. o \ 1 — N.rsp sCall bBf01e OU dI &x\ _Olt_ � � / 8/7 0v633 �v \v v v-- - ��F ��- o r'� �v�U_, r� 7� I�� OWNER/DEVELOPER: 9` I / FF , (� \ -� - y 1EHP/ \ SEBR 801,LLC I 8/3, ��.• m `\ I 'ADS»3o J TEr•+'.sTor�v»Re \ \\\ \\\?.. �-=_ w �l (.`,- �// / 1 �� \� M 804 GREEN VALLEY ROAD cl INLET STD.4311 \. \\\_--, \ l 1tP / / / SUITE 202 \ • / V i / / STD.431] \ \\''-_ \\\ Q \\ -=• �� \ / J '// CONTACT NC 2)408 I 1 _ I'`i / / /\,,,\� \ \ \ \ q \ N �+" / CONTACT:STEVE SHAVITZ 1�" \ \ ) f / / / / _\ / \" \ \ \ `_- \\\ \ I- ` 11 T\ L \ d ) PHONE:(336)812-3314 8i I. I v _—v vv q L v v ��A V \— • ^' /� / /' /�' —/ / // / I \ \ \ \ __—\\\ \\\\ �\ `fi \ \ \\ / ��� EnulL::re�e�aeev.Ne.ion, z m �`�\, ENGINEER: 1/46 4/ / ADS•34^ A�»35 ) �,l \ - - \\\\ \ \ --^ \ \ 4 / P- CPT ENGINEERING STREET SSURVEYING,INC. in al / II II. \ 11.--ADS»II / ' �' / / \ \\\\\ \ 1,2 ( \ •\ TYNIN TEMP.STOIF/WIC 8//\ s l l . �‘. s���` - / / / / • »3( I ^ p \\\\ \ \ �� \ \ \ ,\ \ CONTACT:STEVENT NE PE. p ryI � 473 1/1 mVf V1 \ s1NIV EXLAVATION l�jz P ADS 4 Vvv u I - veAc >t3t v A V v VAZ tomC7 • Z al Q I pl$k i I I ADs»3z / vvv vv��vvv v v 1 ve Q (V3(- • . it11 I ADS.-Ci' ��� vvv V � v v vv &I ip �\ £ I // Building B •A »4O TB4P.SToI✓E/WIRE I \\ \\ \� \ \\\ \\ / // \\ \ \ W zV (/�2 vJ I I\ R, INLETTEMP PROTECTION AT \• \ \ \\ \\ \ ` Z (.�a- I 11 Is' `�\ \ / / / / ---\ 1■r ALL STORM INLETS(TTP. \ \\ \\ \ -�_-_-i V \\\ ry'yo \ \ / _ g' \ --- _ ��O 1 �l r R \\\\ \\ FFE:815.55 < \ y • [cos STD. FFE:816.33 \� bARRACADe Wm- pl �� .r c ll1^ Z.-1/ // I \ / / FFE:813.55 FFE:814.55 / \ j • \\\ �L 2 ,�.•ii'll d` (I -ADS wN 1.1 II / ' •1 \VVAA V A��I �� A\ 8 >I / �/ �A'�v 1, ,^J vv • I: ;,. ® - �- v I VAV\V 1A - •v J f i� ' - ADs•a IA 7� I C), A l 'ITEMP.5To1�/WIRE nPK1� ' \- - --- \ /' 1 .( \ --_ - � ` �\� 8 I 1 \\ ` uuu INLET PROTECTION �/ ) ' \�l�l►—�_ � \ 1 1 \\I\\ d \. j1�� Z/ a '^ z^HP Le»29 z"HPNimp — 1 �S 1 111 '�o'\ :par\no.•••HALL,IvExcAoonsvivijoioN,T7 1Ho '•�LOb STD.4311 / 1 ) . JJJIJJJ)))/�)II)))))))I)) \ 4/ I / ,, •. A ^1 aI --- �` \ \I �1_ \ ��1» 2 \ 8'! FG55fp, '�i�-"s a• __ cs 1 \ B 11l \ 1/ N/A I /l \4. cs \ / qy \ 6 '� u BEALs/ / ` ¢p „ ` � V AA Dp ® a' $ 1\\I �7 IIII� 11 I I'� aNl�waL»Ia 2��07n I �. 3© d ^ \V AA ` d. / 1 111\\I �t'X �, �111 r® �/ :»' ^1 �\ �Ji za^RCP za"RLP ie'I I \� \ I 6 '»_ ` ■ ■ 1111 ^♦ 4 DI W�� a/ ^Nv1»b 81 III '' ,`�� a/ '� ■,e RCP • .� 1 7 :�/ � ' , , I \ \ �\ 8� illr � .// a/ c' E., / h VAA DID1 \ I \I • L� v ��� I .�6.�na���•.Tam.SILT j r/ /'' � „'� ) Aw\V V AA\ / , / 1 1 I q v I ILL ( ( II A I A bl4/20�4 4, ) \VAVA VA A' r- 8�g ILos STD.430] / / I// / • / / , \\\ \ \ 4 i II r\ // I i 11 \\ »e",p� / »�/ ( I 711 11-1 /% • i ' TAAI — „nnnn ,,n 0\ &16 v V �� 8� �� III I 1 u I In / i » E4P.EA ec�MAA (!R(!R(!R(!' v v 'I qP} • �' n V Q / // , [cos STD.4401Or) --_ ( ,Ili <,»�/� , v. r \\\\. 81'I- -81� ( I �� vv v A LLI /../*_1/ �'•o ,-� 1•» O// �' �• � ��- \ � TEM6:EFRn(e6�ri�� ( I vv � ( \ I V I �� I Q J � 04 1 ,,) 1 Fa n3 O // ,� £/ »/ ' " s)5'Rcv- - A 5DMH»4 / z3°oRIFIce DIA. , RIM I/ / I III_•` ' DRnINA6E AREA**UN Az.. G (/ _ I \ \\ • .,.,,:�,,,,�,,,„r,.�,�1II 7 tCf flKflKf: Kfiliiir: I �S�i \III I \\ I IZ O V // �// �% © A / / 11A. �� �M6FDTEXNIRAFI � � 0 �\ :-- \\V CB•1T \ V ��, WN / A �/ ♦ J/ m I o \ [cos sro.a4o] s 0- TIA- ' \ U I I III;;;;1' 4AP' o o /II ? a g I v� A✓ »BALKFILL v cd , 2 J I / -�/ PERIMETER MIN.I'DEPTH)/--�- 0 \r- 1 \ yAl 1 \ es, � f F / , / / sPlurAreFv.blao a o Iii oV 1 » ' 4 H D_ / Gr�i� --.SILT-- E• I ./II Q za vElR a 7 f Z TP. < ok1��r � � TOP. 5DOT ' � (irir,, L�\. I ,...J Baru . / t�� ,_..- �I sIn& � � z 4. lKrr�4°�a Pin ee�4 V ��\\� ' \ g� 1, I\V z O 0 ? BOO-- A "�l R(f(((Kf(ffKf((( I)))),! \\ v V I l V 0 v J \ SIGNAL POLE p any__�. _ .,,7 ....... �, fftm i' II\\ �')/I) II))))/J)J ,,,,,,,,,,,,,,,,, ICOb STD 440]�� \ II� / / z $� \ \%V \\ O W i.:: ,,,.,.. f )) r L .,G„f(,,,K,,,fG,f(,,:(�G;fG,',f(„(H7,',4C,',f(„(Yf(KffKf(KE(Kf(KfKK( \\ v Q / 1 5\ ! -v im -- , ,•1J 0 z \ � A�; _ �- _y AV w - 1 7. �I;r» + vw r\lip. __ �� � � -- _ =-_ 7 _-- _-- - - - _ _- - -- _ - - AI �flyz.,� �:r, ..���.---___- iier, - -` .1 �• - SEX 50,10 r '�1 � _ N� __Lo t� ..,�-• k -- ♦ 9J �� -w-I� -0p v ��w� y —� �-aIy_ �� ti- u_,�� �'_ i I r1►�r �_ !i� 4 •� > `' - - TEMP.SILT FENCE %\ f -w-- -� — i . A-SILT�� \�' /\,___ / / _ •[CW STD.430]AND •- / UNKNOWN / + TEMP.SEDIMENT CONTROL LOS // // O <� � w - �0 /� /� / \ rEr1P.1Rff�TEcnoN / / / /\ rVQ / / too. / / �� _ PROTECTION- \ PE�cE[cos 5ro.a4e]- / / / w w w w w L -- \- --- --,- - \ as t.���__ -vR¢oNsv \ FENCE Ewe " >\ r�'� \ ��-'"--- '\ tw \w w� \ w - lw \ -w� -w\ �\ W a \ \ \ \ \ 1 \ \ \ \ \ \ BUS STOP JJJ �: ®r \� �! - __` --__ —___ -- — ' ---- � --_ ,A---- ___z-_= =- , _---,-=�,_s-�=gyp\ \ -- T � 511E ADDRESS. 3 �, =� _ — -- --_ -- ---_�/ IC 1 COI ErRB%VALLEYRD Q //�® y ��\\\ \_` ---_—_—_---- ----- -- -- -- _— --_------ ---- --- ----- ---- =�■s��-�� ��������� k — -- -- — --� 1==_��; 6R iBORD.NG f� d \@'! '--------------------- GREEN VALLEY ROAD------ --- ' � _ ___-- SCALE: I•=30' • — PUBLIC RIGHT-OF-WAY VARIES 1 1 �' MINOR THOROUGHFARE - 1 1_�-=— -- DATE: 6/4/2024 1 GRAPHIC SCALE - - - - `� � ', . y - • T - - - - - - _ L - PROJECT: I f07 21 ��\\ J -/p� __-7 %\ /i �r__ PLAN TRACKING NUMBER 2023-4358 DRAWN BY: /� STW 7 III ( IN FEET) � III 1 I 4 III �I I SEE SHEET C-8 FOR CONSTRUCTION SEQUENCE,NOTES,AND LEGEND -SHEET G_y'1 A 1 inch= 30 ft. V ° � � \ -811 1� i ENTERPRISE ROAD 1 �i REVISIONS k)-1 � '• I I u L__- �. 50'PU N �• u 1 I 1 I V COLLECTOR STREET � .. 1 1 � � �� 1 a� II 0 1 I �L Know what's I below. I _ �- c' ., =-- �i1��bef01'eyOUdlr, ®. ♦ • rah*� j rta'.��A r�r.ra v v �. --- ---ro�--ro----r0/f �----r+a �s:' .^�. 1 $ ! �_��ti r�4�-�`•r+r`3+Be + z-Eo--Li1�}y�-��i_> - _-" - ---sT� s E- _/7 .N�o -mow-- /w - -w wt T -- w w/� w ✓ w5 \ L�� �y- I / I /TEFiP.SILT FENCE / /` J� / I �l- r/ �- -wr-�, / // - --- \ i�/- we w w w i - w -w- w w - w Jr, '-' 1 B/9 d C9 deb cy N a \ �t ;�y ei3 iY �i?� �� U' 83\� REAP.SILT FENCE - --844 --8`F/_ SILT 85 e TEMP. - , I\ `'o a`? \ 6 r j,A a9 s� r? �? }`'�. �s s I 9� (cob STD.430] \ 1 - _ [cos STD.aso] �' r N 1 III �-- --11- 7 i�7- �— — 6 - 6 VICINITY MAP -— - _ - _ r N.rs p 11 .- 6 ,/ +- ) —_ / 6 e•N-12 . 6 b'N 12 ..� �, 7.BLICRIG_H_T-OF-WAY - 841 D° L842 1 1 2 2AP5 I �% , / 0 N-Iz ADS»44 �T ky 8 :• 1 u l E I • ADS MT 1 I I V 1 ,�' ,--ADS �8 v v / I ? ®/ 1 II / I - 1 LI ' I V 1 a a _ N I II R 1 I I // TEMP.IH:IVEXCAVATION f. 839—� 9/ x 1 u ETAININb YULL»S FFE:838.67/ DORIN5 wnu.WI6TRUCTI __ y' \`_K _ z l u i i83 .A I I u Lb]ADS 042 8\ 1 11 I x l HI I 4 j 11 ouEll v e _ STD.wn 1/49 4 BuildingACB , „ / u 1 1 1 1) 1 INLET PROTECTION \ 1 I I / 11 \ I' - u' » \ i © 1 III TEMP. WIRE, \V A II 11 )I A FFE:828.001 v / 1 �v �'II- ��_ s, • ••.�,•�, flRflK�lKflRfIRKRKKfIKfIKfIKfIKf! I ry� I , , , I i l u [ws sro.a3p ) - 1 f ry JII a --__ I 1 1 _ Le 71 11 I 111 11 r�TAlraiNb w,_= I I A \V - ADS»s2 - _ 6 �?` TEMP.EARTH eEaM ) 1 V Q II I o UTILITY EASEMENT / = Fea4,Feei / 0 ry 1 I '.. TEMP.SILT FENCE-- q -_ _ - 1 [we STD 440] Q mRETAINING WALL»1 ' / - _ _ 17`_ IS' _ ' m,,,,� ................ .. t --- : Y PI I ;A [Cob STD.60] I p I 3/ 1 ce u3T_ s ce: _ ___ s RCP _ _.'TRAP.STONY wIRE $ \� _- • ___, (i: I \ --- _ r (` .�I = F __�- -__ --__ �_�_ - _ _-INLET PROTECTION _III _ Di - .73 �'@ \ I � \� - .� __— _ --_ -- = GOb STD_4311. N.Imo'° j - ri_ _ BJ� - -f__ _-- Z IN, Z 1 y-++j�, LD- - - - �I/ DI»I2 B B� 6,` \ B�\ \ B A �V 8.2 A )) r ' �f - --- vV / 1 ) Z _ I i ce»sd B B?` \ \ 1 1 1 \ ' W CQ 1 i r1-- Z LUMEN V vq� :. --B� ---- \ V A A i A II PP\ �/ _ �L 1 / I\ ....\/1 / � W�� �l lY rf,9 � -___ '? \� I _ c- Ir 6 \1 \ u1 /4 r �T - T- -T --II ikh 1 —) 8� 86 I 1 j l ° 83?1 I v / \lIHN4l/ tv � I bEOTEMIIF LINER B A 1 11 I 1 I � 1� r I I ��/� f(b��� �'•_. I 'v I PERIMETER(MIN.1'D5n14)- \ 1 I`` _ s s _ `( /1 \ - I I TEMP.STOlTJ WI / / / __ MIRAN F144041 , g 8! N I (T..... sk r wFr r�EcrION vI»Io 1-/ 1 // / o®'a*- �oTRENLH E yprrFlLL I 8 (COS sm.a3p w /1 ORIFICE DIA - �� \ SPILL/JAY ELEV.8180 8� w ` e_' = sFaL d I' IS'MPIR I 1 I 1 II I \ / ( / _ �s z r24 07 ,'1 /I vca� tilo �� II 111 1 I I jB•A / 1 II •' a» / I-- �p 6� 8 , / �` > > •I II' ° �V�`� ��// v 1 8� , I 1 1 I ' I // /- H o p/l • "9r `� 7 i II 1 1 conc:E EnsHdB aI/�— I L 6l4/2024 V� iA l I/ • •�°•Rco v 81 v. `� :✓ B/ / 11 /� /� 1 I 11 11 / \ vA� / I / -� • 9 / 1 //\-.....,,,,,.... /I / m ••• 3•2• \ \\I / /a / 1U V - • I Q 8 /'. 4 •• V \ / TEMP.srDNE/w1Rr:1 83 / I B / 8 CHAR s7bmEi i /`�•. �'�i *�' -i • • • .»1r-�' �q 1NLETPROr�noN L1�v� _ - I�,1- �37. � ''1... - - ��� d,2\V /I \ �� \ _ LOG STD.431 T\ _ idl. 1 1 >&� a�J \ ; • Q, a' \ 30, ; • ' Cs»1a Is^RCP ce»1 ��\`Ts RCP- «12-_ n / ) \\\ 1 ' • j Z_ ! .r /Gi % hy4 i'' j . :n._ _ - ;15� .. .. & _, .-,•nn»..-m iKf! KRf ,,,, ((({.( , /;I =�� Il R,,, 11.4 • KKK d/ ��_ / '''',./. � • �I \ •,tN� VAV _ b•$ `�_ �� 8`?b �Lv r l� Q z A...1, / "/c`$� � fii„�i .,� i - 1 ''�,+ - 9/ /-_--- / 81: Bj9. /B� / B /B / 8` /�� i - '�c p7� - x > R O yn/ . �� » u CB p1 za RCP/ »IO 24•� w A. �," \ Z IL O Q s 1 II C a' •%kr "1 ,,,._ _ Ji ) 1 / • � p, �,4 ° NJ • I Ex a»2 11 2 �C9 5 / �i ati d'ce 1s 81: - '; .-!ce I l' —� 2 p � Ail //// ��� m2 a - / %; �, 6.min �� 4 1 D_ z t_____,ir" ,/ _ _ _ _ ! J CY/ ♦ � \ l� 41ss�icC FFE:818.33//I/r//// �I„ I11I1�1 I Y ANil6wAu p- Z� (� �lsS,o �T / ✓ / 25' », cp .., _--- +yynay �' ////i 1II I/(---__� \ I . ?,- z,Dr / /, ��/ �. J. ///,//// )1 I 1 ! J -IN IV EYGAV(TIGN 0Q W ' ` 1 ,' /i/'///////11 1 \) \ I 1 OUi1N6 WALL C7 5'f[211CTION 0 W U ��� cu r' • �s e. qps FFE:816.33 \ \\\)i 11 1 1 \\ 11 I „' - Z Q , �s�>'F Ate �®.!/ry �i .� •��� ��� V A)11\II ----- ,/ 1 O e. \�I\ 1 v\1 1 I1�1 ����_-- __ -- oi < �/ ✓ VS»7g ,, I / d7Q L�7 11 III d/ �� ' $ 9e 2.11 ti �1��1 ADS»2o ADS»21 II ! IIII \ N / S S ,--'..--- \* / ,__------ ///////i _ /,� a� i c�%�i i� >.I �����i� III it I pp ,\ 815^m I I )���\)A�Avv m \V I I )/, III Q7 J' • , / I s F'g �+- �� I I 1 jA Vvv�VA I 11 rp- (PLAN TRACKING NUMBER 2023-4358 ILI 5� �•' J S z•M �� V A �v�\����vv11 . g I I I i III / / �,♦ 1� III \ ) 11 SEE SHEET C-8 FOR CONSTRUCTION SEQUENCE,NOTES,AND LEGEND // • Ra�� >•• '97 12'M� \ \ \\1)1 11 W \ qj' II p • • e- �@ III p I I 1 1 1 i, =, T 11 51TE ADDRESS. 3 �P « ,y`°�- •4+-4P /,,.p,, l '9 I ' F.,, "v 9�3% / ' ', 1 1 1 1 1 ADs m m I I I 1 I �I_ OWNER/DEVELOPER: ENGINEER: 8,01 VALLEY RD n � � ' ,•• q �� / V� '� 4� �y i /�-•- ) III 11 _- C �� 8 I co W SEBR 801,LLC CPT ENGINEERING&SURVEYING,INC. 6RiBORO,NG Q -- �j-. • / �1 11 r -, Pp[ \\ qDs t, i11 1 I 7 » / r • ' 11 `. F t// / �I I III \ W IQ I III SUITE GREEN VALLEY ROAD 4400 ttNING STREET / .1 �I�v \f� �Y ® ••� Ill 1 �\ /2, 87$�r^\\\ 'gyp. " \ 8 /2'fA� IIIII\\,1\:1‘\ l\\ l W n 111 111 GRIEENSBORO NC 27408 CONTACT:STEVENTSWEBB,P.E. _^4$1 �� // 'P �' '�• , \ "ems '�• \ / I I I 01 \ CONTACT STEVE SHAVITZ PHONE 1336)0128000 EXT.9,0 �j�iALE; I��',�y' ? -- I - 1�-- +D \ \I\ \ \ N I PHON 2 3314,/ �, • I \ v /' - AI �� v ENUIL�sreve@a�vnN"r.:om� • v3 �! sr vv ��ivVA�I 1 \ DATE:• 'fit ` °k� v ; b/4/2024 qll • I A ¢5 �I/ GRAPHIC SCALE 1 ro� p� ea / �... •• �, s�"�� � 2�NP A V') I PROJECT: I107 21 .` " 7mle \1 •••R� \x r l `3 "sl 11 B/ 4 El � ^ + 30 0 0 60 a ,I o w z �_ s� II Rcar ••• z•y g� I DRAWN BY: STW /Y IN FEET) sa_ �i_:4':�-- 4, ��w • �� 1 1 I 1 / iz /n ��, L iinch= 30 et. SHEET C/_e2 A BORROW AND/OR WASTE AREAS: �/ w '� OWN�ERLDDEVELOPER: ` REVISIONS IF THE SAME PERSON CONDUCTS THE LAND-DISTURBING ACTIVITY AND ANY RELATED BORROW OR WASTE ACTIVITY,THE ill \\\ SEBR 804 GREEN VALLEY ROAD RELATED BORROW OR WASTE ACTIVITY SHALL CONSTITUTE PART OF THE LAND-DISTURBING ACTIVITY UNLESS THE \ \ ` - BORROW OR WASTE ACTIVITY IS REGULATED UNDER THE MINING ACT OFI9]1,OR ISALANDFILL REGULATED BY THE \ \ ,} \ - \ ,.._1 ` DIVISION OF WASTE MANAGEMENT.IF THE LAND-DISTURBING ACTIVITY AND ANY RELATED BORROW OR WASTE ACTIVITY \ \ (( ✓•� j '� / 1 \ \ GREENSBORO,NC 27408 _ ARE NOT CONDUCTED BY THE SAME PERSON,THEY SHALL BE CONSIDERED SEPARATE LAND-DISTURBING ACTIVITIES AND \ \ \\\\ .,%�i'� / ��t :L\i \ \ CONTACT:STEVE SHAVITZ - 5 •` N MUST BE PERMITTED EITHER THROUGH THE SEDIMENTATION POLLUTION CONTROL ACT AS A ONE-USE BORROW SITE OR \\ �y\ //'!, , \ \,�i . 2 - // 1 I-\ '0 •4 \ \ PHONE:I336)812-3314 F / \ THROUGH THE MINING ACT. q\ �\`�\ r _<i' /✓ p \\ \ EMAIL sieve(gCeeprNer.mm I MAINTENANCE SCHEDULE: \ �✓ v �9i ��� \ \ \ ENGINEER: 1.)ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING ,\ \� r © / / \\\ S \\ \ \\ CPT ENGINEERINGSSURVEYING,INC. \ EVERYSTORMEVENT,BUT IN NO CASE LESS THAN ONCE EVERY WEEK.ANV REPAIRSORCLEANING NECESSARY TO31 M00 ttNING STREET MAINTAIN EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE COMPLETED IMMEDIATELY. `�• O \5' Ca \ \\ HIGH POINT,NC 2)265 /-RO�[cl 4✓le7 wi y�4NPU p4' \ \ CONTACT:STEVENT WEBB P.E. 2.)ALL SEEDED AREAS SHALL BE REFERTILIZED RESEEDED AS NECESSARY AND MULCHED ACCORDING TO THE SEEDING �AF• -'t ' le vpv-fre-� �, \ \\ \ PHONE(336)812-6800 EXT.310 SCHEDULE. / 2.4 0 g/ w ¢� 0\° 5 N_ \G \ EMAIL nevew®cplen9 neenn&gym \ 'Nr LB JUERAS LB INNEEDEDJUANDMOWT0 LBINA1'HEIGHT.TOPDRESS WITH 40 LBIACRENITROGEN IN APR.,50 LB.INMAY,50 / // wjNp•�' � / rj P�,n *\\s \ \. \ � r- ' x LB INJUNE,30 LB IN JULY,AND2550 LB IN AUG. /\/ //if 'w 7...9 _ �/ , HP% \�� -:` \ - _ \ -\ ta` �. ' /, r \\ \ \ `\\ VICINITY MAP m +l*Z.:-Ai' ''' e"/ 1/ i i � /yyw \\\\\11 \\l `\w CONSTRUCTION SEQUENCE: n.rs O� / ' a ' x;1 •�/� Po 239 \ CONTRACTOR SHALL ENSURE THAT ALL APPLICABLE PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO 9 \ , ���t "!'! . *\i\i/�,��/\ ,1 \ \ \\ \\\/ PROCEEDING WITH WORK ASSOCIATED WITH THESE DOCUMENTS. :n� / Y ' ```` v1.1�� /'M� 1■� /\1\ \\ \ \ / y,�` 2FILE NOTICE OF INTENT AND OBTAIN CERTIFICATE OF COVERAGE FOR THE NPDES NCGOI PERMIT FROM THE NC y �•" / l `< \ \ DEPARTMENT OF ENVIRONMENTAL QUALITY. �0 \ I/'// y� 1 y W_ `� ) / c • \ \ 3.SCHEDULE A PRE-CONSTRUCTION CONFERENCE WITH OWNER ALL CONTRACTORS FOR LAND DISTURBANCE AND/OR \ ;c��0C0 40dP;• y .0 .+, Os •�- / \// l / 0° µ\• • p \ \l o \\- EROSION CONTROL AND EROSION CONTROL AUTHORITY PERSONNEL TO DISCUSS THE EROSION CONTROL PLAN / ,B ���PPP I`. • �p ,r.G �'_ O.FLAG THE NEW CONSTRUCTION LIMITS AS INDICATED ON THE PLAN,DO NOT EXCEED PROPERTY BOUNDARIES WITHOUT '� 9 �� y ;•�\ ° yam'\ // \ \\ .f1 WRITTEN APPROVAL OF ADJACENT PROPERTY OWNERS.FLAG THE CLEARING LIMITS AND VERIFY WITH THE OWNER PRIOR TO V I I• CLEARING ,'• 4 K"� yP � �st jpp ' / b �� /a'C \ \ .p, \\ S.THE SITE CONSISTS OF AN EXISTING PAVED PARKING LOT WITH SI%(8)EXISTING DRIVEWAYS THE EXISTING DRVEWAYS z � 0��J45 ".✓ \tte, If}+%A \ l- {l q � �/ \ \ \\\IIa-dry WILL EITHER BE CLOSED OR RECONSTRUCTED AT THE AREAS ALSO SHOWN AS THE TEMPO Y CONSTRUCTION ENTRANCES 1L� O,q � s5'" �� '2 - �+ 1� / _ -1� \ \\\ \ •py, //^�� [COG STD.C36].THE EXISTING PAVED DRIVEWAYS SHALL REMAIN INPUCE UNTIL GRADING DICTATES THAT THE DRIVEWAY BE �/ �I -tefi f � Fit �p - ', vl \ /' � �/ N, L�\\ y0• \ \ \ y��3L REMOVED AND/OR REGRADED AND RECONSTRUCTED WITH ATEMPORARV CONSTRUCTION ENTRANCE[COG STD.4%]UNTIL Z 111 IV z f �%/� - / s, :ifA� \\ \ l" THE PERMANET DRIVEWAY IS PAVED \11 ry(O \ l `® • _ '!\�'\ ,/ /'/ \y�,L I \ \\\ \\ SELF INSPECTION IINTIAL DATE 1 �-r Fr NI- ` Wf�� yv : � �r t•6r`-9 y1 * 6 , • \ •'/,'/\yX �F - ���•�\r `..; ,�,.y/' \ r \\I l \ 6.INSTALL TEMPORARY SILT FENCE[COG STD.490]AND TEMPORARY TREE PROTECTION FENCE[COG STD.08].INSTALL U y , \ `� �- F \)fA TEMPORARY STONE OUTLETS IN LOW AREAS OF SILT FENCE. N `� \\�\ fiw '� / Toe; v abA �-�,4. , \ !. o/ i� ' �1� � a#0 �,' / a , \ IL x \\ i/ /V�' 9/ Q �/ --.tl :1 / / •_i_T' P"�4`� • / ,.... ` \\ \ SELF INSPECTION IINTIAL DATE 1 a 2 N LL "-' \ ®yr� I/ �/ \,® ''�I W ` [ �NN y3"•''A�'+ ),INSTALL TEMPORARY SEDIMENT CONTROL LOGS[COG STD.450]ATTHEEXISTING STORMINLETSON-SITE.TEMPORARY INj .Y����+1�C/%„+ ��� O \ -` , \\ ,/ �' \��j ` �\ [ ® e'Avb \10 1 \ \\ l \ SEDIMENT CONTROL LOGS TO REMAIN IN PLACE UNTIL THE E%ISTING STORM INLETS ARE TO BE REMOVED. Q 12; j y / • '1 I DO�dP\eG\'( l SELF INSPECTION IINTIAL: DATE: 1 fi e�]� ,9\ le .nI / l ,..(..J'/ B.CLEAR AND REMOVE THE TREES AS INDICATED ON THE DEMOLITION PLAN ¢9• yk / O yY. .\ r -. \ \ \ Y'^ �� // ,t` SELF INSPECTION Z 'WI I �'I Y•` 1\ \ \ / :'2 y-j / / / - _\ •S \ ON IINTIAL: DATE: 1 H(V ` (, P�t� \� --.•I y' 9.REFER TO THE EXISTING CONDITIONS/DEMOLITION PLAN FOR REMOVAL/RELOCATION OF EXISTING UTILITIES,REMOVAL OFZQ ea��Tr"( eb - g ' EXISTING CONCRETE REMOVAL OF EXISTING CURB REMOVAL OF EXISTINGASPHA T REMOVA OF EXISTING STORM �/ _ (�jr',,P�'Y"�44�,Aq 0 ; • \ �- /_ 1w,9A -- � �'l \\ \ X \ \ UA \ DRAINAGE,ETC.REMOVEIHAULOFF ALLDEMOLITIONDEBRISASNEWPROPOSEDIMPROVEMENTSAREBEINersRiLLED. ZU dpT \\ \5\. VI^'epl dw0�A°� & ,,„yO„Qk\V" \ 4 .00.P. _/ ' 1� y �, - \\ // �N \] \\ 10.INSTALL THE STORM DRAINAGE FROM THE EXISTING CURB INLET(EX.CIM3)AT LENDEW STREETTHRU THE SITE TO W! �T \ \�\ Q q :r ", ���yyy�,, ���yy.•" ,-}',} f ."�L""\ / / \ \:�, \ CONNECT TO THE EXISTING CURB INLETS(EX.CI XI AND CI M2]AT MERRITT MEDICAL PLAZA(1511 WESTOVER TERRACE). Li \ `� c Og �•b �GB 491.0 / - /\/.W' i \ sy`1�\\� // II\�\\ INSTALL TEMPORARY INLET PROTECTION[COG STD.431]AS THE STORM INLETS ARE INSTALLED.INSTALL PARTIALLY - _ \ v� Q0w"I' v,n � e at1 �„ ® ®� �' vv �Wf:,. Av INSTALLED STORM SEWER PROTECTION[COG STD A43]AS NEEDED AS HE STORM DRAINAGE IS BEING INSTALLED. s\\ ,.�'. » aQo �''.j Qe *041- - ♦ \ may\ \'� I I\\\\\'•\ ©\\� N - /�, %•. � S�/ \, :� \\� // �\/ �\, \ I I [\ \\\ . \r SELF INSPECTION IINTIAL: DATE: 1111 \ ` �\i% •@I I - ! / \ \ " /• I\ \\ 11.ONCE THE STORM DRAINAGE EXTENSION THRU THE SITE HAS BEEN INSTALLED UP TO CB M33,REMOVE THE EXISTING ��\ \\ ,"•%A. p 'I'*\ " ! B �r•nOA\L',,,, / �( yiii///� \ \\\� ASPHALT,CURB,AND UTILITIES IN THEAREA OF TEMPORARY SKIMMERSEDIMENT BASIN k1.INSTALL TEMP.SKIMMERlsy"5- •` / < Y•� i � " /.... .. 'c60", h\'\ j� \ ��\I]\ \\\ /� SEDIMENT BASINk1 WITH BAFFLES AND2.5"SKIMMER.EMERGENCY SPILLWAY SHALL BE LINED WITH AN IMPERMEABLE • \el \.0 rs %\ �- M�J .y �. % ( r�' `�t - / T#,`,_ �J' r /iJ ]t \\ MEMBRANE(10 MIL POLY)TRENCH AND KEY IN LINER(MIN.I DEPTH)EMERGENCY SPILLWAY EL 0160(24 WEIR)EXTEND �/ ; „ \ \ ° �,� ."' \' •f(k Y/ l\ //-/ \I \\y\N\ l GEOTEXTILE LINER(MIRAFI FN404)FROM THE EMERGENCY SPILLWAY/SKIMMER OUTLET TO CB 833 AS OUTLET PROTECTION. \\ r�,•pf 4T -A ' %N' - N Jjyy �'\ ♦ / I )1 \`\ •S• INSTALL AND MAINTAIN TEMPORARY EARTH BERMS[COG STD.00]TO TEMPORARY SKIMMER SEDIMENT BASINMI DURING - c >A - / �� 1 zV �0:0 \, ,i�'" \ � , _.."2 i ] I coNsnxucnoN. / \ ./• "e SELF INSPECTION IINTIAL: DATE:ofN1 u P (� N' 1 �^ 12.ONCE THE STORM DRAINAGE EXTENSION THRU THE SITE HAS BEEN INSTALLED UP TODIM INSTALL TEMP.SKIMMER \ 41/ reNi e�� � ya� v �'e���' v� 9 x��w� /Ind, 1 B�:i@9,,.. GTCN ENIRAIYEtl . 01TH \ 0'es' '. '1\ y \ nUA \ / I 110 SEDIMENT BASIN k2 WITH BAFFLES AND 2.5"SKIMMER.EMERGENCY SPILLWAY SHALL BE LINED WITH AN IMPERMEABLE HCAItOti,[eaB 6ro.4]W \ . , ie"� %S`.%�°''1_�, d / \ / er�A ,,," ,.�_ 14 IP !i'\ • `/� /' \ '�: '.� / �w�pa p0'y \ / lI MEMsmtNT 10MILPOLY),TeEA HAND yie_,NLINER(MIN.1'DEPTH).EMERGENCVSPILLWAYEL.013.0II5'WEIR].INSTALLA ,(y,O \ \� \ \- is �',(/6� ` ,- y\• nIT\ \ ;�\/ \ C p9 E --` \ II ANDMAINTAINTE PoRARY EARTHBERMS[COGSTD.MO]TO TEMPORARYSKIMMERSEDIMENTBASINM2DURINGg'� EEO •/�\ , _ tt '.6- 0 5 t. * y �63:',.�"c \ - 11 M O\ I'� \ ��' pPOYd�\ \ 1VyW J \ICONSTRUCTION Q�"HEI""z"a \4`m] V11 \ A ll v�` sc a,, �' ♦A� �� w� `, '`�// r�ruNes nuie .•`k "y �n�A Ai 11 BEAL l1E lUBNGOIE 1D9.BIL rat 1r.E\. ,,\ +,1IIG�{�,P ` \ I _\. /�� .� `, \ \\ - _-- I I l SELF INSPECTION IINTIAL DATE 1 4•j.�+v]\ \\` ' \'-V \ :' „ "$ \� i \ /= _ I- 13.ONCE THE STORM DRAINAGE EXTENSION THRU THE SITE HAS BEEN INSTALLED UP TO CB MI),REMOVE THE EXISTING +-A / Bpl,9 LENDEW ST \ { ,I< /'`V _ \ ASPHALT CURB AND UTILITIES IN THE AREA OF TEMPORARY SKIMMER SEDIMENT BASIN K3.INSTALL TEMP.SKIMMER WBf PROITLnON I\'\ , �__ \� �R qT, y ' ppO�Ay1 \ EO /� SEDIMENT BASIN M3 WITH BAFFLES AND 2.0"SKIMMER.EMERGENCY SPILLWAY SHALL BE LINED WITH AN IMPERMEABLE �9 .4,(� IC00.0rr. 1 -- \` I 4s %� /g`�'.Y'L - V� MEMBRANE(10 MILPOLV),TRENCH AND KEY-IN LINER(MIN.1'DEPTH).EMERGENCVSPILLWAYEL.018.0(15'WEIR].EXTEND 1•1\\\• 0] PG 49 49 _ �` 1 ''\� 1 / • �AY `2 • �•, '3� �(\-' _\" .Fly` g�)3'ue% \ \� \ �� �L v GEOTEXTILE LINER(MIRAFI FW404)FROM THE EMERGENCY SPILLWAY/SKIMMER OUTLET TO DI N AS OUTLET PROTECTION. �AX2H 1 STNT ONAL I •3 �� -i > &' A •` /lI 'i l I\ . /IrWflr\\I` PLAN TRACKING NUMBER 2023-4358 t>x3 \ 11! -`1 �� Q� ` /� \--�� \�/Jf^\LIJJJ��� INSTALL AND MAINTAIN TEMPORARY EARTH BERMS[COG STD.ddO]TO TEMPORARY SKIMMER SEDIMENT BASIN M3 DURING l/ I i t� ♦ �o �n m w\•; / I --- CONSTRUCTION bl4/2024 � a 1 '/ ,,, - W6E 10a'1 ,,, moo.., , -s \ ,�"� \ -(- 1 x EROSION CONTROL SYMBOLS LEGEND I III I T t+�'}�_ � " " r \ a'\ v % ���.. Imo/ \ ® SELF INSPECTION IINTIAL DATE 1 AA Iu sro.q58 �0 BN�j� - O // \-91 14.CONTINUE REMOVING AND HAULING OFF ALL DEMOLITION DEBRIS AS SHOWN ON THE DEMOLOTION PLAN AS THE SITE IS \al �� 1 t}� \ q / d , "- , \ / ! Pp ED'P6a - - _ I BEING GRADED PROPOSED STORM DRAINAGE -HhR1ER/LONBN \ ��• t31F` .�l 6 O' --�, \ �v �•�• -/ -\ 4, siovER r 15.CONTINUE INSTALLING STORM DRAINAGE AS SOON AS THE GRADING OPERATIONS DICTATE INSTALL TEMPORARY STONE/ g TEMP.SEDIMENT CONTROL LOG[COG STD.d50] 5 �I \ w li ' I' ' pi \�`P Q. \ ill\ �1�• �/ - II, --TTI� _ f• ,_ rz"ECEL 93 ]J [ WIRE INLET PROTECTION[COG STD.431]AS THE STORM INLETS ARE INSTALLED.INSTALL PARTIALLY INSTALLED STORM TEMP.CONCRETE BARRACADE [LCG 5ro.4&1 ,�u33C �l�I■5' - _ U i . 01 \ ] r SEWER PROTECTION[COG STD.443]AS NEEDED AS THE STORM DRAINAGE IS BEING INSTALLED. 1BP.5LTF8E �,^" 1 Ic 1 ` ^ _� I� I 6g`E%RIA\ Y" �°.d `\_� \ I 30 2� 16.INSTALL RETAINING WALLS AS SOON AS GRADING OPERATIONS DICTATE REFER TO RETAINING WALL PLANS BY MODULUS, TEMP.SILT FENCE[COG STD.430] O [LdG STD.43O1 Ii . "� 0 > - \ I-'\ G 5� \ I/ i11 E-�8- p••� ZONIN6 o F PLLC FOR DETAILS ,1, �--�- TEMP.SILT FENCE WI STONE OUTLET[COG STD.430] ���� I Ir11 Il• �� A �p/.•��O A \ E OFF }gyp (• I _ /r �'�'1 8 �_�.A S " � \ - - \I 17.CONTRACTOR SHALL ENSURE THAT EROSION CONTROL DEVICES ARE FUNCTIONING AND MAINTAINED DURING TEMP.TREE PROTECTION FENCE[COG STD.MB] AEl174:MGOIE {(/> I' 11BBff'rr . :ft\ 1 \ 153GE [ nQ�NORS W i I 1/�M] .`I $ T�; 1: _F��tTIG1AT I CONSTRUCTION.CONTRACTOR MAY BE REQUIRED TO INSTALL ADDITIONAL EROSION CONTROL MEASURES AS DEEMED u LI' TEMP.STORM INLET PROTECTION[COG STD.431] fl47( rl/- 1 ' 'I�� mg �; _ T$ ��I C J Le'',I}�--Of.I >'B • �, ` y --_- I NECESSARY BV THE EROSION CONTROL INSPECTOR Q BAFFLES I�Fw i1 �1 �S STD.fill 1 �+ . `! 8NRR4 \ NEHEPERMITTEESHALL COMPLY WITH INSPECTIONMONITORINGAND CONTROLS SPECIFIED FOR STORMWATER ^, .�i4 414 mi• DISTURBED LIMITS yS / `A I] �� �� Building 404, ,I sng Once/ 'A..4.0trAilye•T'}\ , \ l\ -' J \ 5 DISCHARGES ONCE DISTURBANCE HAS BEGUN ON THE SITE AND UNTIL COMPLETION OF CONSTRUCTION OR DEVELOPMENT IL 3C1 � VI ' 6Un HegM.49-75' bSpace f AND THE ESTABLISHMENTOFAPERMANENTGROUNDCOVER. Iv-Y- PROPOSED SANITARY SEWER ZONI.PIWmQ �l •• HeigPt:51'-2" \- ---- ^`` I �' I19.DURINGCONSTRUCTION AND UNTIL COMPLETION OF CONSTRUCTION ORDEVELOPMEM ANDTHE ESTABLISHMENT OF Zil PROPOSED EXCELSIOR MATTING LOuJ IIk• III •Itl `J J \Q] 99- • ` �__ ---•\ - I' PERMANENT GROUND COVER THE PERMITTEE SHALL PROVIDE THE OPERATION AND MAINTENANCE NECESSARY TO OPERATE Z 0_d / 00'• • 1 ,'I ' 1'r ��� \ I THE STORMWATER CONTROL MEASURES AND ALL EROSION AND SEDIMENTATION CONTROL MEASURES AT OPTIMUM Q � I` � ZLINND: //'"k�i�'+[/'I I �. ■� *� \ /t I v \ EFFICIENCY. Q I ♦ \ O.GROUNDCOVER WILL BE REQUIRED ONA LDENUDED AREAS OTXER TWAN PERIMETER BERMS,SWA ES,DITCHES AND J BOUNDARY/PROPERTY LINE n3T 5TOtFl WRE Ip J, 1 y \ ��; �� �� `r. \ �" - �'-\ \ \ SLOPES STEEPER THAN 3H:IV WITHIN FOURTEEN(14]DAYS)OR COMPLETION OF ANY PHASE OF GRADING.RECORD DATEIS) ,1 / •_y O SETBACK /' 4.-,.... ^ �n`I �L I �E w `1 _ 1 \ OF PROVIDING GROUNDCOVER. IYU�3ID all . I.' �� �J tJ'rt - :� f7� .\ _ \ l \\ \b GAS LINE ��� [806SO.4,381 ON B11RN1LEM / Ci - ��► -� _� \ - ` \ \� \ \ \ \ \ ]L �iwYt [LLG 9TD.436] \ 1�P Si I _ SELF INSPECTION INTIAL: DATE:E: 1 ,1, V ---W WATERLINE ® / _ j IIETfimITLTION n3P.TG1E/ ! 1tl i.--.-____ __ �� - \ \ - \ ( 4'4"1 -rJHVI- OVERHEAD UTILITIES / / `` ILC5 Sro.4317 � NF PROT GnOH��Ii , I : .STpfjyRE �!' `YI�-: 111"' \ \\ \ 21.PROVIDEGROUND COVERON ALL PERIMETER BERMS,SWALES,DITCHES AND SLOPES STEEPERTHAN 3H:IV WITHIN SEVEN / / • • [LLK 9ro.EM] [LW tlg8g J'■ I 1 ,,--1- 'I �. T `-. \ \ \ ())DAO:VANY SLOPE INDICATED STEEPERTHAN 3H:IVSHALLBECOVERED WITHEXCELSIORMATTINGTO PREVENT EROSION �Iy]1 -•-•-•- UNDERGROUND COMMUNICATIONS /- '• 091 ^= IY 6510�1 -I[C. 083 I iTAMNB NBLL N\ \\ \ / AFTER SEEDING. Q ..�^1 -Ll- UNDERGROUND POWER /66� / n3i.STOP/ �� 11 \ _ _ _ _ �� \ 1- II I \ / \ l H/GYYM1.14 ( V 2 O x SANITARY SEWER LINE 1@P.SLT FBCB /Y£ � IWfTPROIC nON �nl9'GT'-W$�W - \ dT®1VNiM MRSBER T SELF INSPECTION INTIAL: DATE: 1 Z �RP'6. _ PARCEL:831,4 22.ALL EROSION CONTROL DEVICES ARE TO REMAIN IN PLACE UNTIL THE SITE IS PROPERLY STABILIZED WITH SUFFICIENT CURB AND GUTTER [L05 STD.430] 7 / / / ���. V ILM 5ro.431] - i'R FTNT[OTox✓ BCPI pq,7�gl0N 1:+ I /114{1���• \ Ili Know what's below. 'f'y_ ' UM3ro.48 6ro.437 1 I I \ R 946 GROUND COVER.GROUND COVER MUST BE MAINTAINED TO A DEGREE THAT PREVENTS SOIL EROSION AND SEDIMENTATION $ Call before you d19. ?/ /\ /� ' �/ B \. 'I L ' � �� II oPIN B694 Ge o GM ATC ALL TIMES. ,1, / �` '� / _ ,'III ,� f�1 , \ \ ZONINS 0 M \ \ 1 WL 3EE5 23.CALL FOR AN INSPECTION PRIOR TO REMOVING ANY EROSION CONTROL DEVICES.REMOVAL OF EROSION CONTROL •,• K ill I �1 0• 0 - DEVICES SHALL OCCUR ONLY UPON RECEIPT OF APPROVAL FROM THE EROSION CONTROL INSPECTOR.ANY MODIFICATIONS 2 GENERAL NOTES: /7/ r„c� �// �' ,x�, G sb & 1 ' \JL , I i c�A3�F0E I \ \ TO THE APPROVED PLANS MUST BE PRE-APPROVED AND DOCUMENTED ON THE SELF-INSPECTION FORMS. O Ifi 1.ALL DISTANCESAREHORIZONTAL GROUNDDISTANCESUNLESS OTHERWISE NOTED. J''� /v I[Gu 51D.g311 • `,� y�w�m le�•'�/_3_' T@IP 57GE/YRE-R,`�•• �•i -. \ \ \ 24.ONCE AN INSPECTION FOR SUFFICIENT GROUND COVER AND THE SITES COVER IS APPROVED THE SEDIMENT THAT HAS r N R y / -- AIETF�I�nOX I �\ I MEL\ BEEN COLLECTED FROM THE EROSION CONTROL DEVICES MAY BE REMOVED AND GRADE THE AREA(S)WHERE THE < `-4f+ // % /J•f,/� 111L (\" (� Sro' , RYETPROi1YM I \ \\l - MEASURES WERE INSTALLED TO FINAL ELEVATIONS AND STABILIZE.DRAINAGE STRUCTURES AND PIPE MAV BE REQUIRED TOO O W LLIa2.SITE IS SUBJECT TO ALL EASEMENTS,RAN AND AGREEMENTS OF RECORD PRIOR TO THE DATE OF THE SURVEY. .4/ / /e// / �� 1 - G5 �' -�, ,' �\ .-STp q31] I \ \ // BE VACUUMED TO REMOVE ANYACCUMULATED SEDIMENT. •\ _E 6V / �I 1� �� O.NIRE MET PROT0101 I -- -- - �r I \ \ \ '_ 25.REMOVE ANY ACCUMULATED SEDIMENT IN THE DRAINAGE STRUCTURES AND PIPE. V31 3.THIS MAP IS SUBJECT TO ANY FACTS THAT MAV BE DISCLOSED BVAFULL AND ACCURATE TITLE SEARCH. / Xf0 i� 1 fI• [Cp55Tp"qyl] \ �_; - ��� �G ; / i Z / ( I \ \ 26.THE PERMITTEE SHALL ENSURE THAT GENERAL CONTRACTORI GRADING CONTRACTOR PREVENT SEDIMENTATION 'I ! PROIf TKN / c i- C I FROM LEAVING THE SITE BY THE CONSTRUCTION TRAFFIC.IN ADDITION,THE GENERAL CONTRACTOR/GRADING CONTRACTOR 4.ALL BUILDINGS AND SURFACE AND SUBSURFACE IMPROVEMENTS ON AND ADJACENT TO THE SITE ARE NOT �� / ,• (1 5ro.L3 - / IL TEiP.TUE/WIPE % \ �_il SHALL HAVEON SITE THE MEANSTO REMOVEANV SEDIMENT TRACKEDONTO THESTREET.IFCONDITIONS REQUIRE, O Q0 NECESSARILY SHOWN HEREON. Gco// /' �•1,$> ,T .'rQ0HIRE. Ajju t _I PFOTFGnOH / % I'" 11 \ \ \\/�_ 1 EQUIPMENT MUST BE ONSITE TO WASH TIRES OFVEHICLES PRIOR TO ENTERING THE STREET .E� `\Lv1 soNAL POLE �� v 1 116ET FF01FL11oN __ I ( 2).SCHEDULE FINAL INSPECTION TO CLOSE THE GRADING PERMIT. V' Q S.SUBSURFACE AND ENVIRONMENTAL CONDITIONS WERE NOT EXAMINED OR CONSIDEREDASAPARTOFTHIS •�� • k..-2. \�\'-\ I\ [LOG STD.qWl m L __\ i 0 0 pr /� �/' '11 \ i M1' !\\U _ \ \ 2:FILE NOTICE OF TERMINATION WITHTHE NC DEPARTMENT OF ENVIRONMENTAL QUALITY TO CLOSE THE NPDES NCG01 SURVEY.NO STATEMENT IS MADE CONCERNING THE EXISTENCE OF UNDERGROUND OR OVERHEAD CONTAINERS a ,4 - / Q OR FACILITIES THAT MAY AFFECT THE USE OR DEVELOPMENT OF THIS TRACT. \ \ \ A _ , I iBT14(01/nN _/ / F: It1 1 \ \ ��\\ - / PERMIT. 11'/ ♦\ _ ,�. ��'� �~.� _ /« ] E i� ` __ I I `� � �\ ��% \\ \ \ SOIL TYPES: 11LI '� ,k1J..: _ :•,.max....' c,,,,,0 3u ��T��1 `� I L� \ \ , 6.NO ATTEMPT HAS BEEN MADE AS PART OF THE BOUNDARY SURVEY TO OBTAIN OR SHOW DATA CONCERNING • ! - z EX.ISTENCE,SIZE,DEPTH,CONDITION,CAPACITY,OR LOCATION OF ANY UTILITY OR MUNICIPAL/PUBLIC SERVICE \ • �•_` -�r.Z �� \1 \ % CB(CECIL-URBAN DCOMPLEX,2T010 %SLOPES) 1N FACILITY.FOR INFORMATION REGARDING THESE UTILITIES OR FACILITIES,PLEASE CONTACT THE APPROPRIATE ` M ,p. 4\ ��1I -_-PO`c\ `• _- - _�� , --- ' . i� - I` \ \ arc /i1' Ur TURBAN SOILS) .aE AGENCIES. \\lam W_ -_ �+-�_/E ��_' - jffi. -41-p 0I•:,y T'm\ / -Z ���< "/ e• ZOS • ).SURVEYORHAS MADENOINVESTIGATION OR INDEPENDENT SEARCHFOR EASEMENTS OF RECORD, \� ��I - T@p'SILT �%'D� / -�N• , ,SILT--'1• %� '"�1P- --\! �"��ATd -i` • 4 II �� /� ENCUMBERANCES,RESTRICTIVE COVENANTS,OWNERSHIPTITLE EVIDENCE,OR ANY OTHERFACTS THAT AN \!J - T_ [ .',4e4,4I10]AID ' '' F• V - _- • -VERZONSG 1B1P.1T�P.pplryn0l✓-.pp\ -�- ='_,, II -7_ 5%a5,,8 .. 1/� _O x>7.e�r.; � - 7 / ACCURATE AND CURRENT TITLE SEARCH MAY DISCLOSE. ../''' \ �Nol]EpoLE /see V46 SM.MA 2 W - - • Nonl / -•!AS j77/ �''' Q -�_ _ �-__ \ \ ---'4 -lam rartLwGs%Me] `E +�--MaER /[woe]?.aD] / /_W y / RETAINING WALL NOTES: ' D,� --- J�'pp i 1.PROPOSED RETAINING WALLS ARE FOR ILLUSTRATION PURPOSES ONLY DEPICTING CHANGE IN GRADE REQUIREMENTS. 5: 8.THE WORD"CERTIFY'OR'CERTIFICATE"MEANS AN EXPRESSION OF PROFESSIONAL OPINION REGARDING THE // /,7� // u<".:\�\\ �����- �- \-=-1e L=_�_ --\ \ \ \ , W \--��-�-Wg�� �- --R / \'--/ �� lS FACTS OF THE SURVEY AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE,EXPRESSED OR IMPLIED. Ti--iT:_� � _ ," CPT ENGINEERING AND SURVEYING,INC.IS NOT RESPONSIBLE FOR RETAINING WALL DESIGNS.REFER TO PLANS BY OTHERSCOI GREER N --_-=_=_v_e �- � =- r�- - / FOR RETAINING WALL DETAILS.UTILITY INFORMATION: -- - -�--- - • / v / / ALLEY---- GREEN VALLEY ROAD i (1 -=s / 2.ALL RETAINING WALLS OR RETAINING WALL SYSTEMS WITH A CUMULATIVE VERTICAL RELIEF GREATER THAN SFEET AND r= - PUBLIC C RIGHT - t THE LOCATIONS of UNDERGROUND UTILITIES SHOWN HEREON ARE BASED ON ABOVE GROUND STRucrvREs.LOCATIONS of -- RIGHT-OF-WAY VARIES - / \ ` ALL RETAINING-- -. .� MNOR T}J_O O G R _ £,0 / % THAN THE VERTICAL ICALSYSTEMSWITHACUMULESIGNEDRTICALRISTERE DESIGN SROFESS AND NAL,LOCATED REQUIRE BUILDING STRUCTRESMAUNDERGROUND i BE ENCOUNTERED. S MAY NO EXCARY FROM ATIONSLOchi ONE SHOWN HEREON.ADDITIONALBURIED SURVEY TO LOCATE �� ---' - ----•-.� ss >"' ------ ��a _� THANTHEPERIITAND SPECIAL INSPECTIONS DESIGNED BYAREGISTERED DESIGNPROFESSIONAL,ANDREOUIREASEPARATE - sRUSES/TRUCTUEENcouNTEREo no ExcAvhi ons wERE MADE DURING THE PROGRESS oF THIS suRVEV TO BOCAI[BURIED \ ,�� % \\- --" - •- --- _ - - - - _ _ ' _ 0 __ BUILDING PERMIT AND SPECIAL INSPECTIONS. SCALE: CO unLTEs/STRUOTUREs -���__ \\ "'- _ _"�y � \ �G IR-W' LOCATION AND/OR EXISTENCE OF UTILITY SBTSTCEL NB TO THE PROPERTY SURVEYED ARE UNKNOWN AND ARE NOT N \\ II �� 11 I ��� --- / l 1, I \ 3.ALL WALLS SHALL HAVE FALL PROTECTION BVA6'HIGH SAFETY FENCE. RAIL: u II II f) II -1 0� -_ \_ , . \,, 6/4/2024 s�wN ND,DPOMAKE6NDGUARANTEETHAT THE L GRAPHIC SCALE sU„r,nE"„"„E qq aSERNCEABANDONED.CPTFURTHERUNDERGROUNDDOESNOTWARRANTTHATTHE PROJECT: I f07 21 D• F"TILITIES SHOWN H"� IN THE PARENT FROM OBSERVED EVIDENCE OF ABOVE GROUND 3PPUKreNACEs UNDERGROUND SELF-INSPECTION PROVISIONS FOR EROSION CONTROL: LATITUDE: 36.0929 LONGITUDE: -79.8179 RIVER BASIN: CAPE FEAR 6 = II DRAWN BY: STW A FLOOD NOTE: THE PERMITTEE SHALL MAKE PROVISIONS FOR MONITORING AND SELF INSPECTION TOTAL SITE AREA: 11.971 AC. N REQUIREMENTS OF THE NPDES N000100000 PERMIT.SELF-INSPECTION REQUIREMENTS ARE THE SUBJECT PROPERTYIS IN AREAS DETERMINED TO BE OUTSIDE THE0.2 %ANNUAL CHANCE FLOODPLAIN REQUIRED UNTIL THE SITE IS STABLE AND THE GRADING PERMIT IS CLOSED. TOTAL DISTURBED AREA: 12.48Ac. I IN FEET J (ZONE AS EOUTEJNONTHELATESTFLOODINSURANCERATEMAP,PANEL7855,MAPNUMBER3710785500J, SHEET G-1 F EFFECTIVE DATE JUNE 10,2007. 1 inch= 60 PC.