Loading...
HomeMy WebLinkAboutSW6230804_Supplement-EZ Form_20240621 SUPPLEMENT-EZ COVER PAGE FOGI\v;LOADED PROJECT INFORMATION 1 Project Name Oakridge Duncan Self-Storage Phase 1 2 1Project Area(ac) 13.1 3 Coastal Wetland Area(ac) 4 1,Surface Water Area(ac) _ 5 I Is this project High or Low Density? H)h 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) _ 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(cd)? 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: _- 11 Infiltration System 12 !Bioretention Cell 13 !Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 1 1 17 Rainwater Harvesting(RWH) 18 'Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 .Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 I Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Jared Matthews.PE 28 Organization: The,Qvnry Engineering Group.PLLC 29 .Street address: 205 South Fuquay Avenue 30 City,State,Zip: Fuquay-Varina,NC 27526 31 Phone number(s): 919-552-0849 32 Email: ared cu j @ rryeng.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer NCARD /. .oFEssio 2� SEAL v('7 Signa of Designer 048484 • : ' • p� oay_ /iil-art tt�` Date DRAINAGE AREAS _ 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? i No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 Open Bottom Sand Open Bottom Sand 4 Type of SCM Filter Filter 5 Total drainage area(sq ft) 571843 571843 6 Onsite drainage area(sq ft) 316082 316082 7 Offsite drainage area(sq ft) 8 'Total BUA in project(sq ft) 103281 sf 103281 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) New BUA not on subdivided lots(subject to 10 permitting)(sf) 11 Offsite BUA(sq ft) 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) 83985 sf 83985 sf -Sidewalk(sq ft) -Roof(sq ft) 17022 sf 17022 sf -Roadway(sq ft) 2274 sf 2274 sf -Future(sq ft) 258619 258619 -Other,please specify in the comment box below(sq ft) 893 sf 893 sf New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 _permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 36% 36% 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) 21613 cf 21613 cf 21 I Calculation method for design volume SCS SCS ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 I drainage area(s): Line 5-Entire site,Line 6-All Drainage areas depicted from SW-03,Other in [ 12-Offiste drainage area that is the driveway to be offset in calculations. SAND FILTER 1 I Drainage area number _l 1 NE2'Minimum required treatment volume(cuDC ft) 6711 sf GERAL M FROM 02N.3050 3 Is the SCM sized to treat the SW from all surfaces at build-out? 1 Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered INo side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9I What is the method for dewatering the SCM for maintenance? 1 Pump(preferred) 101If applicable,will the SCM be cleaned out after construction? 1 Yes 11 l Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with N/A I General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? 1 Yes 17 i Was the SCM designed by an NC licensed professional? Yes ;AND-FRTER MDC FROM 02H 105B 18 SHWT elevation(fmsl) 408 19 Type of sand filter(open or closed) 1 Open 20 If closed,will the filter will be pre-cast or pour-in-place? 21 If closed,top of grate elevation(fmsl) 1 2211s this sand filter desired to attenuate peak flows? 1 Yes Sediment Chamber 23 Volume that can be retained in the sediment chamber(cubic feet) 2010 cf J24 Will there be a permanent pool in the sediment chamber? No 251 Bottom of the sediment chamber(fmsl) 410.00 26 Area of the sediment chamber(square feet) 19867 sf 27 Physical depth of the sediment chamber(inches) 36 in 28 Ponding depth in the sediment chamber,above any permanent pool 36 in (inches) 29 Elevation of top of weir between chambers(fmsl) 413 Sand Chamber _ 30 Volume that can be retained in the sand chamber(cubic feet) 1 92927 of 31 Bottom of the sand chamber(fmsl) 410.00 32 Area of the sand chamber(square feet) 15679 sf 33 Physical depth of the sand chamber(inches) 56 in 34 Ponding depth in the sand chamber,above the sand surface 12 in (inches) 35 Elevation of the bypass device(fmsl) 414 36 Type of bypass device 2x 4"Orifices 37 Mechanism for distributing flow over the sand surface I sheet flow 38 Sand specification for sand chamber Astm-33 39 Depth above underdrain pipe(inches) I 20 in 40 Will the media be maintained to drain at least two inches per hour at Yes the sand surface? _ _ 41 Is at least one clean-out pipe provided at the low point of each Yes underdrain line? 42 Will clean-out pipes be capped? i Yes ADDITIONAL INFORMATION -_ 43 Please use this space to provide any additional information about the sand filter(s): Sand Filter 3 9:19 AM 6/21/2024