HomeMy WebLinkAboutNCC231802_Contact Update Confirmation Email_20240621 Georgoulias, Bethany
From: Georgoulias, Bethany
Sent: Friday, June 21, 2024 2:16 PM
To: Niemann, Holly Elizabeth
Cc: Szkolnyj, Eric J; Hawkins, Randy
Subject: RE: [External] Typo in Permittee Email for NCC231802
Attachments: [External] Construction SW Permit Contact Information Update for NCC231802
Thankyou for catching that, Holly! It was a typo.The billing email was correct(so invoices would have gotten
through), but the primary permittee email needed correction.We got it fixed (see attached).
Have a good weekend,
Bethany Georgoulias(she/her)
Environmental Engineer,Stormwater Program
DEMLR Laserfiche Administrator
Division of Energy, Mineral,and Land Resources
N.C. Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@deq.nc.gov
512 N.Salisbury Street,Raleigh, NC 27604 (location)
1612 Mail Service Center,Raleigh, NC 27699-1612 (mailing)
Website: http//deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
From: Niemann, Holly Elizabeth <Holly.Niemann@duke-energy.com>
Sent: Friday,June 21, 2024 12:56 PM
To: Georgoulias, Bethany<bethany.georgoulias@deq.nc.gov>
Cc: Szkolnyj, Eric J <Eric.Szkolnyj@duke-energy.com>; Hawkins, Randy<Randy.Hawkins@duke-energy.com>
Subject: [External]Typo in Permittee Email for NCC231802
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Hi Bethany!
I was doing a check on some construction permits, using the list from NCDECl site to compare. It looks like there is a typo
for the Permittee E-mail for NCC231802, it currently has "eric.szkolnyi@duke-emergy.com" instead of
"Eric.Szkol nyi@duke-energy.com".
Just wanted to confirm this is just a typo on the site's excel list and not in the system that will send out invoices/notices
for this permit?
I really appreciate your help with this!
Have a great weekend!
Thanks!
Holly Niemann (She/Her)
Business and Technical Consultant, Duke Energy
410 South Wilmington St. Raleigh, NC 27601
1
holly.niemann@duke-energy.com
Mail Code: NC03
(M) (919)480-9329
KIWNG A SNARTER ENERGY FUTURE�
TOGETHER
z
Georgoulias, Bethany
From: lase rfiche.ncdenr.gov@mccicloud.io
Sent: Friday, June 21, 2024 2:14 PM
To: eric.szkolnyj@duke-energy.com; randy.hawkins@duke-energy.com
Cc: Georgoulias, Bethany; Holloman, Tevye L
Subject: [External] Construction SW Permit Contact Information Update for NCC231802
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
This email is to notify you that contact information has been updated for Stormwater Channel for Former
Ash Storage Area, under COC No. NCC231802. You can review the information in the permit folder in our
Laserfiche Repository.
The following contact information is now associated with this permit record. If anything is in error,
please contact Bethany Georgoulias at bethany.georgoulias@deq.nc gov.
Legally Responsible Individual
Eric Szkolnyj
eric.szkolnyj@duke-energy.com
(980) 373-7144
(Mailing Address) 525 South Tryon Street, , Charlotte, NC, 28202, US
(Street Address) 525 South Tryon Street, , Charlotte, NC, 28202, US
Site Contact
Randy Hawkins
(Organization) Duke Energy Carolinas, LLC
randy.hawkins@duke-energy.com
(864) 356-8257
(Mailing Address) 573 Duke Power Road, , Mooresboro, NC, 28114, US
Billing Contact (if available)
eric.szkolnyj@duke-energy.com
(980) 373-7144
This change was requested by: Holly Niemann via email on 6/21/2024 - email address correction only.
Be sure to add laserfiche.ncdenr.gov@mccic loud.io to your contacts to avoid future a-mails about this
application from going into Spam filters.
The NC DEMLR Stormwater Program
512 N. Salisbury Street,Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
1
D�
Q�
This email was automatically generated by Laserfiche. Please do not respond to this email address, as
responses are not monitored.
2