Loading...
HomeMy WebLinkAboutSW6231106_Response To Comments_20240618 STOCKS ENGINEERING Designing the Future,Today Monday, February 26, 2024 Brianna Holland 512 N. Salisbury St. Office 625Y Raleigh, NC 27604 RE: Response — Request for Additional Information Stormwater Permit No. SW6231106 High Density Subdivision — 3 Wet Ponds Bryant Road Subdivision, Harnett County To Whom it May Concern, This letter is written in response to the comments, issued February 11, 2024, regarding the proposed subdivision in Erwin that is currently known as Bryant Road Subdivision. A reply or explanation for each comment issued by the Engineer is provided below and follows the original format of your memorandum. 1. Per the latest USGS topographic map, it appears that surface water is immediately adjacent to the site and a portion may be on-site. Ensure that the surface water is excluded from the project area, and that vegetated setbacks are clearly shown on the plans. A landscape buffer is currently shown on the plans, but per 15A NCAC 02H.1042(2)(g)(iii), vegetated setbacks from the surface water must be shown on plans. Per 15A NCAC 02H .1017 (10), at least 30' is required. Note that vegetated setbacks must remain vegetated. a. Ensure that the plans clearly denote the vegetated setbacks for Pond 2 and the stream adjacent to the site that fall within the project area. Vegetated setbacks are measured horizontally from the top of bank of each side of streams and must remain vegetated 15A NCAC 02H .1003 (4). The minimum vegetated setback must be 30 ft. The approximate location of pond 2 is now shown on the plans with a 30'undisturbed vegetated setback. This pond is not located on our property greater than 350'from any land disturbing activity. 2. Per the provided deed restrictions, the maximum amount of BUA allowed per lots is 596,000 SF. Per the Application, Section IV, 10, and the Supplement-EZ Drainage Areas Page, the sum of the BUA on the lots is 43,500 SF + 413,000 SF + 194,750 SF = 651,250 SF. Deed restrictions ensure that the development maintains a "built-upon" area consistent with the design criteria used to size the stormwater control facility. The current deed restrictions indicate that less BUA would be allowed per lot that may be planned to be built. Revise the package, including the calculations, as necessary. The deed restriction is correct and the Application, Supplement EZ Form, and Runoff Map have been updated to reflect the correct data. J.Michael Stocks,PE 252.459.8196(voice) 801 E.Washington Street 252.459.8197(fax) PO Box 1108 252.903.6891 (mobile) Nashville, NC 27856 mstocks@stocksengineering.com 3. Confirm the project area. If the property area as outlined in CE-00 is accurate, the surface water area shown on the USGS map within the project area will need to be accounted for in the Supplement-EZ and Application. Note that the surface area of the surface water is the area between the top of banks of the streams and normal pool of impounded structures. 15A NCAC 02H.1003(4)(a), 15A NCAC 02H.1042(2)(g)(iii). There are three existing ponds along the eastern property line. The two that are furthest north are not on our property and are outside of the project area. The pond that is on the Southeast corner of the site is originally on the property however this pond will but cut on its own individual lot and will be given to the adjacent property. I believe it to be outside of the project area, however the surface area of that pond is listed on the Application Section IV.6. I did not see a specific line in the Supplement EZ form to list this area, so it is noted at the bottom of the drainage areas page. None of the existing ponds drain into our project area or our proposed Storm water control measures. 4. Per the comment response document, there is a small off-site area directed to Wet Pond 2. Update the Application, Supplement-EZ, and calculations to account for this off-site area at full build-out potential (see previous comments for more details on this.) It does not appear that the off-site area was accounted for as 100% BUA of an agreement reached limiting the amount of BUA that can be built on the off-site area. It is recommended to divert off-site area away from the SCM. The offsite area that drains onto our site is already at its full build out potential. It is a portion of NCDOT Public ROW, that is the sliver of land on the back side of a roadside ditch that drains into the existing field and not back towards the ditch. All other areas are diverted to avoid the SCMs. 5. Please verify that the electronic repository is complete when making submittals. It was noted that a drainage area plan, showing the drainage area to each SCM, which is required, was provided in the hard copy submission, but not in the electronic copy. The drainage map showing the drainage area to each SCM is included in the calculation package as the last page. 6. Provide PDFs of all revisions, 2 hardcopies of revised plan sheets, Application, and Supplement-EZ, 1 hardcopy of other documents, and a response to comments letter briefly describing how the comments have been addressed. a. PDFs must be uploaded using the form at: https://edocs.deq.nc.gov/Forms/SW- Supplemental-Upload b. Hard copies must be mailed or delivered to the following address: i. For FedEx/UPS: Brianna Holland J.Michael Stocks, PE 252.459.8196(voice) 801 E.Washington Street 252.459.8197(fax) PO Box 1108 252.903.6891 (mobile) Nashville, NC 27856 mstocks@stocksengineering.com 512 N. Salisbury Street, Office 625Y Raleigh, NC 27604 ii. For USPS: Brianna Holland 1612 Mail Service Center Raleigh, NC 27699-1612 iii. Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. The package will be delivered by FedEx to the address listed above. Included you will find all the requested plans with the comments addressed and any additional information that was needed to show the modifications to the plans as described above. If you have any further questions regarding the above response to the comments issued, please contact us. Thank you. Sincerely, Stocks Engineering, P.A. J. Andrews Stocks J. Andrew Stocks, PE J.Michael Stocks,PE 252.459.8196(voice) 801 E.Washington Street 252.459.8197(fax) PO Box 1108 252.903.6891 (mobile) Nashville, NC 27856 mstocks@stocksengineering.com