Subject: 401 Water Quality Certification Modification Pursuant to Section 401 of the Federal Clean Water Act
with ADDITIONAL CONDITIONS for Proposed improvements to [-77 in Mecklenburg County, Federal
Aid Project NHF-077-1(209)9; WBS No. 45454.1.1, T[P I-5405.
NCDWR Project No. 20150931
Dear Mr. Mellor:
Attached hereto is a modification of Certification No. WQC004036 that was issued to The North Carolina
Department of Transportation (NCDOT) dated November 13, 2015.
This Individual Certification now includes temporary impacts and bank stabilization to sites 5-C, 6-C, and 7-C and
applies only to the 1-5405 section of the I-77 HOT Lanes project.
lf we can be of further assistance. do not hesitate to contact us.
Sincerely,
V ��^
S. Jay Zimmerman, Director
Division of Water Resources
Attachments
Electronic copy only distribution:
Crystal Amschler, US Army Corps of Engineers, Asheville Field Office
Larry Thompson, Division 10 Environmental Officer
Carla Dagnino, NC Department of Transportation
Dr. Cynthia Van Der Wiele, US Environmental Protection Agency
Marella Buncick, US Fish and Wildlife Service
Marla Chambers, NC Wildlife Resources Commission
Donna Hood, NC Division of Water Resources Mooresville Regional Office
File Copy
1617 Mail Service Center, Raleigh, North Carolina 27695-1617
Phone: 919-807-63001 Internet: www.ncdenr.gov
An Equal Opportunity 1 Affirmative Action Employer
401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL
CONDITIONS
THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-
217 of the United States and subject to the North Carolina Division of Water Resources (NCDWR) Regulations in 15
NCAC 2H .0500. This certification authorizes the NCDOT to impact 0.07 acres of jurisdictional wetlands and 410
linear feet of jurisdictional streams in Mecklenburg County. The project shal! be constructed pursuant to the
appiication dated received September 9, 2015. The authorized impacts are as described below:
Stream Impacts in the Catawba River Basin
Permanent Fill Temporary Fill Permanent Fill Temporary �11 Stream
Bank �n Intermittent in Intermittent in Perennial in Perennial Total Stream Impacts
Site Stabilization Impact Requiring
Stream Stream Stream Stream
(linear feet) ���near ft) (linear ft) (linear ft) (linear ft) ���near ft) Mitigation
linear ft
2-C 40 60 60 0
3-C 150 150 0
4-C 33 33 33
5-C 65 35 17 52 35
6-C 21 26 42 68 26
7-C 99 91 40 131 91
I -GR 182 182
TOTAL 225 68 17 117 474 494 185
Total Stream Impact for Project: 494 linear feet
Wetland Impacts in ihe Catawba River Basin
� � � otal (mpacts
I Fill � Mechanized I Hand �
Excavation VVetland Requiring
Site Fill (ac) (temporary) �a�� Clearing Clearing �mpact Mitigation
(ac) (ac) (ac)
ac ac
1-C 0.01 0.06 0.07 0.01
0.00 0.00
0.00 0.00
0.00 0.00
Total 0.01 0.06 0.00 0.00 0.00 0.07 0.01
Total Wetland Impact for Project: 0.07 acres.
The application provides adequate assurance that the discharge of fill material into the waters of the Catawba River
Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards
and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the
applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with
the application and conditions hereinafter set forth.
This approval is only valid for the purpose and design that you submitted in y�our application dated received September
9, 2015. Should your project change, you are required to notify the NCDWR and submit a new application. [f the
property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible
for complying with ali the conditions. [f any additional wetiand impacts, or stream impacts, ror this project (now or in
the future) exceed one acre or 150 linear feet, respectively, additional compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation as
described in 1�A NCAC 2B .0243. For this approval ta remain valid, you are r2cuired to comply with all the conditions
listed below. In addition, you should obtain all other federal, state or local perrnits befo�e proceeding with your project
including (but not I�mited to) Sedimert and Erosion control, Coastal Stormwater, TJon-discharge and Water Supply
watershed regulations. This Certification shall expire on the same da}� as the expiration daie of the corresponding Corps
of Engineers Permit.
Condition(s) of Certification:
General Conditions
1. Unless otherwise approved in this certificaiion, placement of culverts ana other structures in open waters
and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter
greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48
inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other
structures including temporary erosion control measures shall not be conducted in a manner that may result
in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the
above structures. The applicant is required to provide evidence that the equilibrium is being maintained if
requested in writing by NCDWR. If this condition is unable to be met due to bedrock or other limiting
features encountered during construction, please contact NCDWR for guidance on how to proceed and to
determine whether or not a permit modification will be required. [15A NCAC 02H.0506(b)(2)]
2. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact
between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not
be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish
kills. [ I SA NCAC 02B.0200]
3. During the construction of the project, no staging of equipment of any kind is permitted in waters of the
U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)]
4. The dimension, pattern and profile of the stream above and below the crossing shall not be modified.
Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC
02H.0506(b)(2)]
5. Th? �:se of r�p-ra� above ±he �:ormal H:gh Water _M.ark shal! be min�m�zPd. An � rip-�ap placed f�r stream
stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life
passage. [15A NCAC 02H.0506(b)(2)]
6. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approvaL [ 15A NCAC 02H .0507(c) and l5A NCAC 02H .0506 (b)(2) and (c)(2)]
7. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures
from the most current version of NCDOT Construction and Maintenance Activities manual such as
sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in
flowing water. [ I SA NCAC 02H.0506(b)(3) and (c)(3)]
8. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC
02H.0506(b)(3)]
9. All mechanized equipment operated near surface waters must be regularly inspected and maintained to
prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A
NCAC 02H.0506(b)(3)]
10. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certification. [ISA NCAC 02H.0506(b)(3)]
i �. I�ischar�ing hydr�seed rnixtures ai�d washing out hydroszeders anci otlier equipment in or ad�acent to surface
waters is prohibited. [ISA NCAC 02H.0506(b)(3)]
1.2. The permi�tee and its authorized agents shall conduct its ac�ivi;ies in a man7er cansistent with Stni� water
quality standards (including any requirements resulting from compliance with 5303(d) of the Clean Water
Act) and any other appropriate requirements of State and Federal law. lf the NCDWR determines that such
standards or laws are not being met (including the failure to sustain a desigr�atec� or achieved use) or that State
or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR
may reevaluate and modify this certification. [ I SA NCAC 02B.0200]
13. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3: l, unless otherwise
authorized by this certification. [15A NCAC 02H.0506(b)(2)]
14. A copy ofthis Water Quality Certification shall be maintained on the constructien site at all times. In addition,
the Water Quality Certification and all subseyuent moclifications, if any, shall be maintained with the Division
Engineer and the on-site project manager. [ I SA NCAC 02H .0507(c) and I SA NCAC 02H .0506 (b)(2) and
(�)(�)l
15. The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts
to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC
02H.0501 and .0502]
16. The issuance of this certification does not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and
federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management
rules, soil erosion and sedimentation control requirements, etc.
17. The Permittee shall report any violations of this certification to the Division of Water Resources within 24
hours of discovery. [ 1 SA NCAC 02B.0506(b)(2)�
18. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT
Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the
NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(�]
19. Native riparian vegetation (ex. Salix nigra, Juncus (spp), Carex (spp), et al.) must be reestablished in the
riparian areas within the construction limits of the project by the end of the growing season following
�ompletior of cor.structior..f .� 15_A_ NCAC 02B4O23 !(b)(6)]
20. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with
this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow
sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact
from road construction activities.[ISA NCAC 02H.0506(b)(3) and (c)(3)]
21. Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices in order to protect
surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]):
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Contro! Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must
be such that they equal, or exceed, the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction
sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Mamral.
d. The reclamation measures and implementation must comply with the reclamation in accordance with
the requirements of th� Szdimentation Pollution Control Act.
22. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved
hy this Certification. [ I SA NCAC Q2H.0506(bl(3) and (c)(3)]
Violatio;�s of any condition herein set forth may result in revocation of this Certification and may result in crininal
and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of
the Federal 404 and/or Coastal Area Management Act Permit. This Certification shall expire upon the expiration of the
404 or CAMA permit.
If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing.
You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office
of Administrativ� Hearings within sixty (60) days of receipt of this nctice. A petition is considered filed when it is
received in the ofiice of Adrninistrative Hearings during normal office hours. The Gffice of Administrative Hearings
accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The
original and one (1) copy of the petition must be filed with the Office of Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919) 431-3000, Facsimile: (919) 431-3100
A copy of the petition must also be served on DEQ as follows:
Mr. Sam M. Hayes, General Counsel
Department of Environmental Quality
1601 Mail Service Center
This the 15th day of February 2016
DIVISION OF WATER RFS(�URCES
�_ 1 �
t
S. Jay Zimmerman, Director
WQC No. 004036
Water Resources
ENVIRONMEN7Al. OUA�I I�Y
NCDWR Project I�o.:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
County:
P;��"l' ;ti�1Cl�IZl�lZ1"
u���� �� n ii. vn�� r�i iz �� �.��EiT
�. J:11" /l'�1ti11 k�1:1N
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting
Unit, North Carolina Division of Water Resources, 1617 Mait Service Cznter, Raleigh, NC, 27699-15�7. This form
may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applieant's Certificat�on
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Si�nature: Ca�e:
Agent's Ce�tification
1, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 40l
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.