Loading...
HomeMy WebLinkAboutWQ0043096_Permit (Issuance)_20240604DocuSign Envelope ID: 841D94132-945F-4510-89213-1E965FOEBAAD ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Alex Keith, Member Manager 3224 Investments, LLC 121 S. Cool Spring Street Fayetteville, NC, 28301 Subject: Permit No. WQ0045426 Dear Mr. Keith: NORTH CAROLINA Environmental Quality June 4, 2024 3224 Investments, LLC Former Wellman Plant Domestic Wastewater Pump & Haul Permit Cumberland County In accordance with your application received May 22, 2024, and additional information received on May 31, 2024, we are forwarding herewith Permit No. WQ0045426, to 3224 Investments, LLC for the time limited operation of a domestic wastewater pump and haul operation. This permit shall be effective from June 4, 2024, will expire on December 4, 2024, and shall be subject to the conditions and limitations as specified therein. This cover letter and supplement shall be considered a part of this permit and are therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 1.1: The Permittee or its representative shall inspect the permitted pump and haul facilities at least daily to prevent malfunctions and deterioration, operator errors, and discharges that may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance condition [15A NCAC 02T .0204(d)] Condition IIA: Requires an accurate record of the pump and haul activities must be maintained by the permittee. [15A NCAC 02T .0108] If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. DocuSign Envelope ID: 841D94132-9451`4510-89213-1E965FOEBAAD Permit No. WQ0045426 If you need additional information concerning this matter, please contact H. Dale Crisp at (919) 707- 3603 or via e-mail at dale.crisp@deg.nc.gov . Sincerely, E DOCUSigned by: 79OOA4FBFCAI4FD... for Michael Montebello NPDES Branch Chief, Division of Water Resources, DEQ cc: Kevin Lindsay, PE Crawford Design Company Misty Manning, Fayetteville PWC Fayetteville Regional Office, Water Quality Section Regional Operations Water Resources Central Files: WQ0045426 Municipal Unit -Collection Systems (electronic copy) Page 2 of 8 DocuSign Envelope ID: 841D94132-9451`4510-89213-1E965FOEBAAD NORTH CAROLINA Environmental Quality DOMESTIC WASTEWATER PUMP & HAUL PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to 3224 Investments, LLC for the operation of a domestic wastewater pump and haul operation to serve the former Wellman Plant site. The facility from which pumping will occur shall include a minimum of 24 hours storage with on -site audible and visual high-water alarms. The anticipated flow for this pump and haul operation is approximately 2,500 gallons per day of collected domestic wastewater, pursuant to the application received May 22, 2024, and additional information received on May 31, 2024, and in conformity with 15A NCAC 02T and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from June 4, 2024 until December 4, 2024, and shall be subject to the specified conditions and limitations contained therein. DOCUSigned by: 79OOA4FBFCA14FD... for Michael Montebello NPDES Branch Chief, Division of Water Resources, DEQ By Authority of The Environmental Management Commission Permit Number: WQ0045426 Permit Issued: June 4, 2024 Treatment Facility: Fayetteville PWC Rockfish Creek Wastewater Treatment Facility (NC0150105) Page 3 of 8 DocuSign Envelope ID: 841D94132-9451`4510-89213-1E965FOEBAAD 411 a91 "► to01Nrel24 Oki ► IIt4100ITLAM ►'l:LnI The Permittee is hereby authorized to: Construct and operate the aforementioned domestic wastewater pump and haul operation. The wastewater collected by this system shall be pumped and hauled to the Fayetteville PWC Rockfish Creek Wastewater Treatment Facility (Permit No. NC0150105) for final treatment. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. I. SPECIAL CONDITIONS 1. The Permittee or its representative shall inspect the permitted pump and haul facilities during pump and haul activities to prevent malfunctions and deterioration, operator errors, and discharges that may cause or lead to the release of wastes to the environment, a threat to human health, or a nuisance condition. The Permittee shall maintain an inspection log or summary including at least: a. Date and time of inspection; b. Observations made; c. Any maintenance, repairs, or corrective actions taken by the Permittee. The Permittee shall maintain this log of inspections for as long as the pump and haul activities are being conducted and shall be made available to the Division or other permitting authority, upon request. Records shall be submitted quarterly to the Supervisor of the Water Quality Regional Operations of the Fayetteville Regional Office. The records must be submitted within 30 days of the end of each quarter (quarters end on the last day of March, June, September, and December). [15A NCAC 02T .0204(d)] 2. An accurate log shall be kept of all devices used to plug any connecting sewer lines not being used as part of the storage system. All plugging devices shall be tethered to prevent their loss into the collection system. Upon permit expiration or completion of the pump and haul operation, whichever comes sooner, all plugging devices shall be removed and recorded as such in the log. Upon completion, copies of the log shall be forwarded to the Fayetteville Regional Office. Copies of the log shall also be distributed to all copied recipients of this permit. [15A NCAC 02T .0108] Page 4 of 8 DocuSign Envelope ID: 841D94132-9451`4510-89213-1E965FOEBAAD 3. This permit shall become voidable unless the agreement between Quality Septic LLC and Fayetteville PWC Rockfish Creek WWTP for the collection, transportation, and final treatment of wastewater is in full force and effect. [15A NCAC 02T .0204(b)] H. Standard Conditions An accurate record of the pump and haul activities must be maintained by the Permittee, indicating: a. Date and time wastewater is removed from the facility; b. Name of contract hauler; c. Name of facility receiving wastewater; d. Volume of wastewater removed. The Permittee shall maintain this log for as long as the pump and haul activities are being conducted and shall be made available to the Division or other permitting authority, upon request. Records shall be submitted quarterly to the Supervisor of the Water Quality Regional Operations of the Fayetteville Regional Office. The records must be submitted within 30 days of the end of each quarter (quarters end on the last day of March, June, September, and December). [15A NCAC 02T .0108] 2. This permit shall not be transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T .0104; G.S. 143-215.1(d3)] 3. The Permittee shall provide for the installation and maintenance of an audible and visual high-water alarm on all storage and pumping facilities associated with this pump and haul operation. [15A NCAC 02T .0204(c)] 4. This permit shall become voidable unless the subject pump and haul activities are carried out in accordance with the conditions of this permit; 15A NCAC 2T; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.01101 S. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. No type, kind or quantity of wastewater other than the pumped and hauled wastewater from the facility shall be included in these pump and haul activities. [15A NCAC 02T .0110] 6. The wastewater collection facilities shall be properly maintained and operated at all times. Adequate inspection, maintenance, and cleaning shall be provided by the permittee to insure proper operation of the subject facilities. [15A NCAC 02T .04031 7. Noncompliance Notification: The Permittee shall report by telephone to a water resources staff member at the Fayetteville Regional Office, telephone number (910)-433-3300, as soon as possible, but in Page 5 of 8 DocuSign Envelope ID: 841D94132-9451`4510-89213-1E965FOEBAAD no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858- 0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)] 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143- 215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0108(b-c)] 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 10. Any duly authorized officer, employee, or representative of the Division of Water Resources may, upon presentation of credentials, enter and inspect any property, premises, or place on or related to the pump and haul collection facilities at any reasonable time for the purpose of determining compliance with the Division's approval; may inspect or copy any records that must be maintained under the terms and conditions of this permit; and may obtain samples. [15A NCAC 02T .0110] 11. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies. [G.S.143-215.1(b)] Page 6 of 8 DocuSign Envelope ID: 841 D94B2-945F-4510-892B-1 E965FOEBAAD 12. Operation of this permit is based on acceptance of the certification attached to this permit, completed by the Permittee and a North Carolina licensed Professional Engineer. Note that a completed certification is only required for activities that met the definition of the Practice of Engineering in accordance with G.S. 89C-3. In some instances, this certification may not be required. 13. A copy of this permit, and approved plans and specifications (if applicable) shall be maintained on file by the Permittee for the life of the project. [15A NCAC 02T .0104] 14. This permit shall expire on December 3, 2024. Should the pump and haul activities stop prior to the date of expiration send written notification to the Fayetteville Regional Office, Water Quality Section notifying them that the permit is no longer required and detailing the final disposal solution. [15A NCAC 02T .0105(j), 15A NCAC 02T .204(a)] Page 7 of 8 DocuSign Envelope ID: 841D94132-945F-4510-89213-1E965FOEBAAD ENGINEERING CERTIFICATION Permittee: 3224 Investments, LLC Issue Date: June 4, 2024 Permit No: WQ0045426 County: Cumberland Project: Former Wellman Plant Pump and Haul This project shall not be considered complete nor allowed to operate in accordance with the conditions of this permit until the Division has received this Certification. Permit modifications are required for any changes resulting in non-compliance with this permit. A detailed description for partial certifications should be attached to this form along with any certification comments. Certification should be submitted in a manner that documents the Division's receipt. The Permittee is responsible for tracking all partial certifications up until a final certification is received. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEERS CERTIFICATION I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction and operation of a minimum of 24 hours storage with on -site audible and visual high-water alarms for the pump and haul operation of approximately 2,500 gallons per day of collected domestic wastewater into the Fayetteville PWC Rockfish Creek Wastewater Treatment Plant, and in conformity with the project plans, specifications, supporting documents, and design criteria subsequently filed and approved. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. ..................................... North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Send the Completed Form & Supporting Documentation to the Following Address: DWR WATER QUALITY PERMITTING SECTION WASTEWATER BRANCH — MUNICIPAL PERMITTING UNIT 1617 Mail Service Center Raleigh, INC 27699