Loading...
HomeMy WebLinkAboutNCC231555_NOT Closeout Documents (2)_20240615 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 County: Cumberland Project: The Commons at River Bluff-Lot 1 River basin: Cape Fear Person financially responsible:Pami Remodeling Co,Inc.-JagJit Mehmi, Project#: CUMBE-2023-184 President NCC231991 Address: 905 Red Cedar Lane,Fayetteville,NC 28302 1. Project Location: Bluffside Drive,Cross Creek Twsp Pictures: No 2. Weather and soil conditions: Dry/Workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? No If no,check violations below: 5. Violations: ✓ b.Failure to follow approved plan,G.S. 113A-57(5),G.S. 113A-57(5) ✓ j.Failure to install and maintain measures, 15A N.C.A.C.4B.0113, 15 NCAC 4B.0113 ✓ n.Failure to develop or adhere to approved plan,NCG 010000,Part I ✓ r.Failure to install and maintain BMP's,NCG 010000 Part II,G.2-3 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? No Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No one on site Title: Inspection report: Sent Report Date given/sent: March 15,2024 9. Corrective action needed: 1. Install erosion and sediment control devices sufficient to retain sediment on the tract. 10. Comments: -Install construction entrance to prevent tracking onto street. -Install/maintain silt fencing per approved plan. Reported by: Bailey Taylor Others present: Date of inspection: March 14,2024 Time arriving on site: 4:05 PM Time leaving site: 4:20 PM cc: