Loading...
HomeMy WebLinkAboutNCG500098_Halyard_CEI_Report_20240530United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 2 u 3 I NCG500098 111 121 24/05/02 I17 18 [� ] 19 L S j 201 21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 I 72 I n, I 73 � I 74 79 I I I I I I I80 70 I I 71 I LL -1 I I LJ Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 10:30AM 24/05/02 20/12/30 Lexington facility 389 Clyde Fitzgerald Rd Exit Time/Date Permit Expiration Date Linwood NC 27299 11:00AM 24/05/02 25/11/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted William E Motsinger,389 Clyde Fitzgerald Rd Linwood NC 27299//336-248-7332/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Ron Boone Docusigned by: DWR/WSRO WQ/336-776-9690/ ona& Boo., 5/30/2024 B20F8DD5F2A3460... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date Docusigned by: 5/30/2024 Lon T. Snider Lam- —r. StiJv "- 145B49E225C94EA... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NCG500098 I11 12I 24/05/02 117 18 i c i (Cont.) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On May 2nd, 2024, Ron Boone, of the Winston-Salem Regional Office of the NC Division of Water Resources, conducted a compliance evaluation inspection at Halyard's Lexington Facility, discharge permit NCG500098. The assistance of Jordan Rummage was greatly appreciated. Inspection findings are summarized below: The facility produces a cooling tower wastewater. Mr. Rummage stated that the facility has two discharge options. The first is to discharge to the city wastewater collection system and the second is to discharge to the stream. Control of the discharge is achieved through valves. Mr. Rummage stated he's been at Halyard for about eight years and you have not discharged to the stream during that entire time. Mr. Boone reminded Mr. Rummage that, in accordance with the permit, if a discharge to the stream occurs, Halyard must monitor the discharge as specified in the permit. Mr. Rummage acknowledged the requirement. Mr. Boone gave Mr. Halyard a copy of the general permit. The general permit number is NCG500000 and Halyard's certifcate of coverage number under the general permit is NCG500098. Mr. Rummage also asked if Halyard must submit test results to the Division. At this time, Halyard is only required to keep monitoring result on file for a period of no less than three years. Mr. Boone noted no concerns or violations during the inspection. Another inspection will be conducted in about five years if Halyard's permit is still active. If you have any questions or concerns about the permit, its requirements, or the inspection, please don't hesitate to contact Mr. Boone by phone at 336.776.9690 or by email at ron.boone@deq.nc.gov. Thank you for your attention to this matter. Page# Permit: NCG500098 Inspection Date: 05/02/2024 Owner -Facility: Lexington facility Inspection Type: Compliance Evaluation Permit (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: Please refer to the inspection summary section of this report. Yes No NA NE ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ Page# 3