Loading...
HomeMy WebLinkAboutSW3231005_Design Calculations_20240614 II DKOTA SALISBURY CHARLOTTE, NORTH CAROLINA CH22.0177.CV PROJECT CALCULATIONS ````,sp�M • •� , sp. t. •4L4-' O725 • .T �. . \t4.Q.....e..s. :•'; ,,1//1'S• CALY 0,\ . ,111111` GE MINIM SC 1ENCE GROUP Incorporated 500 K Clanton Road Charlotte,North Carolina 28217 704.525.2003 F-0585 1 Project Narrative: SCM has been designed per current DEQ design guidelines and Rowan County criteria. The pre-developed site is predominately wooded. See accompanying soils report to identify soils and precipitation frequencies. Post- developed will be drives, truck court, auto parking and a building. Pre-Developed Area = 1.76 acres. Post- Developed area= 1.76 acres. Design hydraulics will incorporate TR-55 methodology to calculate the time of concentration for the pre-developed site. Post developed Tc is not calculated due to the fact that storm water runoff will travel on paved surfaces into the storm drain system which is typically less than 5 minutes, Tc post will be 5 minutes. Hydraulic calculations will use U.S.Army Corps of Engineers Hydraulic Engineering Center HEC-1 computer program. Design auidelines are as follows: • 1-inch storm shall be detained for 2 to 5 days. • Control the 1-Year 24 Hour post development peak flows to pre-developed levels. •, 85% TSS removal. . • 'Detention (pre< post)for 2, 10-year-24-hour storm. • Safely pass the 50 year-24-hour storm. Pre Developed Condition Area = 1.76 acres=0.0028 mi2 Predominant Soil Types: Sedgefield Hydrologic Soil Group C/D From Aerial photo imagery the site looks to be wooded. Woods, Fair: CN=73/C 79/D Curve Number=73+79= 76 2 Tc=40.37 min. Lag=(0.6)Tc=0.404 hrs. (see spreadsheet) Note: Rainfall data taken from NOAA Atlas 14—Salisbury (see attached) Results of HEC-1 Analysis (see Calculations) Storm Peak Flow(cfs) 1 —Year 24 Hour 1.065 2-Year 24 Hour 1.60 10-Year 24 Hour 3.03 50-Year 24 Hour 4.40 2 Sheet Flow Manning's n for sheet flow(table 3.1 TR-55) smooth surfaces(conc asphalt. gravel or bare soil) 0.011 Head= 12.00 Fallow(no residue) 0 05 manningsl 0.4 Cultivated Soils P2= 3.12 in Residue cover<20% 0.06 Length= 300 ft Residue cover>20% 0 17 s=H/L= 0.040 ft/ft Eqn 3.3 TR55 I Grass Short grass praire 0 15 0 .007 (nL 10 s Dense grass 024 r++ = Eermudagrass 0 41 �S O{ Range 0.13 where. Tl trave`time(hrs.) Woods n=mammngs roughness coefficient Light underbrush 0 4 L=Eowlength(ft.) Dense underbrush 0.8 P2=2-yr. 24 hr rarnfall(in.) s=land slope(ft f t' Tt= am.hr Shallow Concentrated Flow L= 110ft h= 3 ft s= 0.027273 ft/ft V =16.1345G 2 66 fps T=L/(3600V)= 0.01 hr. Compute travel time Tc=Tt1 +Tt2....Tn Tc= 0.673 hr.= 40.38 min. Lag= 0.404 2 sn mom cozen% O05 % 0014.09E oo¢%e 03raGE a9 a M LS o08 I }}I �, M.1 HL.I76 O O CO all 0. - � " _ „rK -. - - - T. . atowsite t - I . ✓ , c .✓ co -E lit__'ik %., - •-or • t yz J , � '; 2to o z t ao mmr ` N % !t a Jv O m =D U — z 41:61/1111 . ,.•-._- . • I C.. , iOS 1 31 w al u- :1:., r X g ' • _ .'re ' 4111V - 8 I 1* `.Y p ra - '. a • P. 8 $o 1111111j . a ,, i, 2 _ - 1 .I - z-I 2C' MI &.OB --....14441MilalliG4=-, 1 •- 1 I MY bt oOB COME D)3LtEE CCGASE COMM 0 OQE ri 2 C rO v N w O 0 N _CV m CO N8 E N 3 am . °3c a" m01Dm co m c m ? co Nm am 3 E c m cmE r CL 7m ° m a � ' t E sZ coE m a m m mQ CO 5 ` m a 0 0 0 � avFm m coa o2 U Z ° m ccoo g co E m N co 0 co °o a LQ } N ,el C � 'O m d D r tNiri o O >mm 2iom3ac E 0w m CO en' ° r o. 3� m omZ mm ce mr m E mNc m .. moo3cN S'O m mv " ai E mtf , .L to n m ooN .c a E V' N CO - c ' o0 m m 00 Ea . E2 m N mm E'mZ al mom ° aa W D m c ° m m .1114a05 oa U c CO n �aam W aym ° w . a co m OmCwi E ayC m U m O..° 'mm m e0 M O m Q am o $ mm � mm s2 =am E o Tom� 2¢ E z� E �tamo �mis ,17; ° ^2 z o tt c et ca m E OI- o_aSc mT— rna mo EN cw m gv In .9 aa mzm N co . gmm 3s . ` m mEov E .. .E cot) EW . $ m me o a Ico m ° C ° m ° Q O c m N > m2mONr m00mEmm mwT U omW L30m Eo dooac r M m aa � - mEcee� .cI' c - c $ o mm Omp co38 .c o � Co.-n m m- i71� w E_ co E co U2 a-o m i— o co co o of E $E 2m 0 E 0 z m Qc cj) U m° C a m 3co �'' 7 Y 0 m O a C Ci W c m L U mo g co . E c . '0 o_+ m ° o c S m v i U) '0 /0 .m.. m C C - m ° _m W m m 0. z E ° S' pp ° . � a z 0 8 U 8 ❑ Z e „,coy o Qm 5 m f ,6 T. C e 3 Z Cl p �l El 2 w s i1 .55 0 3 m W J m 0 d m .0 a ' co 2 E o g c IR c `0 0 o c ao m m 13 c ao ❑ ❑ c c 0 m E! p J O 0Q e a o a a m m 0 0 ❑ Z 74 = < a m a c.) 0 0 Z a m C m oh ❑ L ❑ U ❑ _� ❑ t _ x ❑ ❑ ® ❑ ] = di E et N dl co to 0 C 0 y O W t 0 m 0 ZU Hydrologic Soil Group—Rowan County,North Carolina Dkota Sal!bury Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CeB2 Cecil sandy clay loam,2 B 6.9 8.5% to 8 percent slopes, moderately eroded ChA Chewada loam,0 to 2 1 B/D 7.9 9.8% percent slopes, frequently flooded EnB Enon fine sandy loam,2 C 4.5 5.6% to 8 percent slopes EnC Enon fine sandy loam,8 C i 1.4 1.7% to 15 percent slopes HeB Helena sandy loam,1 to D 13.8 17.1% 6 percent slopes IrB {Iredell loam,1 to 8 C/D 4.2 5.1% percent slopes PaC Pacolet sandy loam,8 to B — 4.3 5.4% 15 percent slopes SeB Sedgefield fine sandy C/D 36.2 44.7% loam,1 to 6 percent slopes VnB2 Vance sandy day loam. C 1.7 2.0% 2 to 8 percent slopes, moderately eroded Totals for Area of Interest 80.8 100.0% USDA Natural Resources Web Soil Survey 8/21/2023 711— Conservation Service National Cooperative Soil Survey Page 3 of 4 v a in Of 0 N el eta 1�N ea 0 eOD� N, 0M9� O •� COO O al ea N a` �^ Or C CD r T "ecn a N N "C4 "t� In 4i C0 45 00 CD al OS., r g -o d p fV c+) el u) CD co 0) = v V r fp N m [9 CD CD COD. CO f0) l) N l'f) CO CV Ov. O GM r0 rM N,_ C9r NtO NtN OD A� OD.- acisi„ rto r to � a � a: O _J 0 CO N N A up w - et . •1 ~� O p OQ OD of N O OD • CO • CO A O m O) CID 0 0 In = O tiO V i MN N a)1 Mg ad Y7N oD� C M� h c N C,. r o r p CV o pa 09 en.1 et co un n CD O W N a0 CA m a) 41/ (0, �. ,if a �p O M cam N 1 N 0 d0), A v g cp 0 } . N a O O I 'f Is' r M CD M 'Ct M Ca Ce Q u1 s p ra r � el et . 40� c!A a;1{) o)m 77^+ o eta' o0 • 4n F [!`C c r C 40 T ro rm Npoj. Mn Mccr, le45 Nra u0M tim+ aoc CpCO 00 'CrCO M° < e !' • O N N m O 10 COO II a N m co 1 W N ill Cl) 00 p W o, y rti v N o m rn m )� w n ti } m c 4) L p OD O co i[Ft I N O c,) CD". N of u7 N O r t0V'r N OC• unt/ - V mw ' mo Qrpa~ppudd mo M� `°o of N Md) ehd Nacod o2 C , ON rC) NaD NM MO M01 0 CA a0 onA A 'I4 Too r 7 4a 43 a W .. 2 L. � m o : : � N m � 1• ° 4. a 0a N M 2 _ CO u _ m mL 10mco v+ C o d C — >74 c O m2j W W $ = ,s p E o CO FA o N CO o CD !!II rl 04 cw8 1L° o°4 2 e d I a+ a.1 .m. o ao r `-' r N r) r) r)°) "`q a " a'") 40 0 43 c'? i` +. ltl00 el W till O m .c H m O Ul v v v N v v v v v co "y„ CO CD m r Q c m u- a !y O v a} ..- y E0 O G m c a C > M� el co 0 0 0 o co VVi, a a0 Ill m :„ V Q O 4o O „ r CC) r,_ M N r N a)M m r O m 4�p ifs 02 • OD R ;g ! N tD PI M cc�� O tq Q it. O 170 C-a t0 W 0 a d r Mco ovdi ' rr; Nd 4V°S NO 4,�d Via' N +r cw co re c z = oCr � om o u? o M a m �. �� a w a g Q w _ a v .N_. �i N v v v v g Q � � 4 m o QO 0 Z Z IT N CO r m U) 0 ^ N- 1C) C9 Q O ul a)al h r• M to CC`r C CO N CD �d CC)0 N e W Z J a .o. O N4 coQ Qd N ' a;N NN N aid �'? r`7 1'� 1? el 1 Rt ' O W GSI r� r'7 4:R. NO NN N� M W et map eta itl N. N li `�S.t 1 L Q to 0. P C O It It O m C7� 1CO f` CV O C4 g C";O M u) :o Q 0 0 `per v .r.�l a.. v CV N M C') C') Q. ^ co C')) r N 711. 11) N O Cr) CO CD d el MD ODCP r0Q U2 WO 08 r1 T. DD r^ CON a)tin N C'i J 0--ei 0-01 O IA r M g CD c6 n r O a M 1 'C•d CD' Of d N• i n d r ti M M1 v) QCM OU3 CO 1- TN r01 r 1^ Nr CVO Mp) 0ir M __ 0.1 CV NI 2S .o. v v 1 v 1 — 0 L' F" E E E E '.c .q rc ri f 0 .,9 Al N f TO O Cf) O O N Cr) O V. N N G r r CO t0 1 n !ti CI I� v v c „2 c cm - C O N— ....- aNM NNN 1 el N • • 1 Ta- N N • NCO N Cni v :J y C .. �I :. I in E m a 1� N CO r Cl ‘I- Cp CD co m- rN coN eh^ 0,O NN W� m a N of N 6 p T N N min m r N p N m CO Mo- o —/ .� m E Nt N CO . cy a O co." m N P. 10 co n t0 O co th I C5 W N N 2..'0 Or �� V. �; �hNmI aae C O M O CO (�j v Z- v v C71 . 'tim' H m• 0 .C ' NI: N co Tr co a Q >R. 9 7• To.CD eD,- ,0 Ti tam 6 afO.2 N •of a c'd 06 r'Co Cd NN Lai a. CDf v O ^ O H) m 0 0 J 1ai a I-5 _ • 2 o c? q N r N� O COI 7 ? W C O r G Tt ei so co 6 co OI m Q 6 6 6 to uS V OD Z.L.6 -'6 O I r m 'al3 coV Z[ t�] 6c) co C— C � I mCO c m 0 CD ODD I.- CD Cn h O 7 L UOoI m a C)al cw) .0.....CI T.O ink C o �t COm, hN e2(3 "-C ei N e Uri e-ab m in n,mp AI CL v v .... v v v C .0 7 E J m mE CD U. fOl co N :"7 v O v g a N tp Ct,' an ism IR CA0 OtN .0.Di CO~ C 74; m 1 r) vm c m C W ta m m� O J a aaim N e aa € cq m o it F. p o m e=2 42 co oc2 rlT MN Ncy Tt6 m W 3a c W ...f0 tD t7 co r O T N T.a; y 3 j= CO v v v �v v v . w a)LaE C mot, C Q 42 I m Nf C CV 2. co e p mI 0? •• O y, 23,n min 4t.' 23c) r :1.- E t » 4mt t+'- �CO '7rOi m " ElcCI CO N.: m d0. 13 vJ v-I tL C 0: r ma E m COO CO CA cO N M N t CO 7 75 CC Q p! •- 0C f,N m m W.0 Q '�i T l P 1 'O GO CD 7 «C E. Q con �C -! too rr10 C .. - a cmaO ci cS a cm r w � ,- m C w Z o axW 0 _C L Fill m >' > CO t0 to c n e MI e I, li)0o 0 0 a 0 a n`o)� m zm-5 a T T S. T ?, 7 D a L p Q O .6 b d7 CV In Kt f- .- (V Vt LO U C Oi j N 1 O O O O O I I I I I I I I l c@ ^ N L`1 b N U7 N In MO 2 Q) J a c c c cx 6to 6 6 5 ^ 5 fV d 1D N fj i7 {V 11I . I 0 Aep-Str dep-oc O /pep-OZ in in cep-or Aep-L \ \\ o o U j �1 v Aep- 11` o lCep-Z .9 v 00 4.1 w J4-tZ _ o in tS+, l c 1y'zic 4- C0 O 'u O J N \ 1 M CO 4- vLn in ,y-Z , off v 13 U!W-09 \ - in N J iu -a UMw-Ofi u, a a. • ulw-5t - N ww-OZ —T I i r i Ulw-S r t I .-i N N .,-1 rO in-1 O in o N N .�-4 O� in (U!) y;dap uoiapdpa1d (U!) q dep uope;3duaJd HEC-1 INPUT LINE ID 1 .2. .3. . . 4 5 6 . .7. . . . . .8. .. . .9. .. . .10 1 ID DKOTA SALISBURY 2 ID PRE-DEVELOPED 1 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 RK RAIN 7 KM 1 YEAR 8 PH 0 0 0.384 0.767 1.31 1.51 1.61 1,95 2.29 2 73 9 KM 2 YEAR 10 KM 0 0 0.455 0.914 1.58 1.83 1.94 2.34 2.76 3.3 11 KM 10 YEAR 12 KM 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 KM 50 YEAR 16 KM 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 KM 100 YEAR 18 KM 0 0 0.715 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 KO 21 20 KK PRE 21 BA 0.0028 22 LS 76 23 CD 0.404 24 K 21 25 5? ***************************************** ***************** * * * * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CO * JUN 1998 * * HYDROLOGIC E * VERSION 4.1 * * 609 SE * * * DAVIS, CA * RUN DATE 21AUG23 TIME 14:25:16 * * (916) * * * ***************************************** ***************** DKOTA SALISBURY PRE-DEVELOPED 1 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMY..N 1 MINUTES IN COMPUTATION INTERVAL IDATE 1 ^ STARTING DATE ITIME 0000 STARTING TIME L 0O NUMBER OF HYDROGRAPH ORDINATES NDDATE 2 0 ENDING DATE NDTIME 0559 ENDING TIME IC Ni 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS TOTAL TIME BASE 29.98 HOURS ENGLISH UNITS DRAINAGE AR''?A ,F,WARE MILES PRECIPITATrC:4 DEPTH INrHE LENGTH, .7 eATION FEET FLOW CUL.IC SET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE R A ACRES TEMPERATURE DEGREES FAH.RENHEIT *** *** *** *** *** *** *** *** *** ** A** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ************** 6 KK * RAIN a * * ************** 19 KO OUTPUT corTROL =T6\RIABLEC I'RMT 5 PRINT CONTROL IPLOT C PLOT CONTROL Q`3CAi, 0. HYDROGRAPH PLOT SCALE IPi:CH 0 PUNCH COMPUTED HYDROGRAPH TOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG 01567 .01667 24.00000 *** *** *** *** *** *** 1A•'•* *** *** *** *** **:, *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ************** 20 KK * PRE * * * ************** 24 KO OUTPUT CONTROL VARIABLES IBRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IP1:CH U PUNCH COMPUTED HYDROGRAPH TOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISI_V1 1 FIRST ORDINATE PUNCHED OR SAVED ISPV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG 01657 01667 24.00000 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIM OPERATION STATION FLOW PEAK 6-HOUR 24-HOUR 72-HOUR AREA STAG HYDROGRAPH AT RAIN 0. .00 0. 0. 0. 00 HYDROGRAPH AT PRE 1. 12.48 0. 0. 0. 00 *** NORMAL END OF HEC-1 *** Hydrograph Peak Flow Rate Peak Flow Total Volume Name (CFS) Date/Time x1000(CF) RAIN 0.0 Dec 01, 1900 00:01 0.0 PRE 11.065 Dec 01, 1900 12:30 5.449 HEC-1 INPUT LINE ID. 1 2 3. . . . .4. . . . . . .5. . . . . .6. . .. . .7. . . .. .8. . . . -9. . . .10 1 ID DKOTA SALISBURY 2 ID PRE-DEVELOPED 2 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 RK RAIN 7 KM 1 YEAR 8 KM 0 0 0.384 0.767 1.31 1 51 1.61 1 95 2.29 2.73 9 KM 2 YEAR 10 PH 0 0 0.455 0.914 1.58 1.83 1.94 2.34 2 76 3.3 11 KM 10 YEAR 12 KM 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 KM 50 YEAR 16 KM 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 74 100 YEAR 18 KM 0 0 0.71S 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 TCO 21 20 7TX PRE 21 3A 0.0028 22 IS 76 23 TM 0.404 24 N:.0 21 25 2Z ***************************************** ***************** * * * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CO * JUN 1998 * * HYDROLOGIC E * VERSION 4.1 * * 609 SE * * * DAVIS, CA * RUN DATE 21AUG23 TIME 14:28:51 * * (916) ***************************************** ***************** DKOTA SALISBURY ?RE-DEVELOPED 2 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NL'_'TN 1 PMNUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 180,1 NUMBER OF HYDROGRAPH ORDINATES NDA'';E 2 C ENDING DATE NDTIMn 0559 ENDING TIME ICp:.i 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS TC•'I TIME BASE 29.98 HOURS ENGLISH UNITS DRAINAGE AMA A .ICY'TARE MILES PRECIPITAT7nN DEPTH INCHES LENGTH, HLfl�:3TION FE7T FLOW CM IC '_?EET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AR'.A ACRES TEMPERATURE DEGREE FAEMENHEIT *** *** *** *** *** *** " *** ,•,** *** *.•:- *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ************** 6 KK * RAIN * * * ************** 19 KO OUTPUT CONTROL VARIABME IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPUCH 0 PUNCH COMPUTED HYDROGRAPH TOUT 21 SAVE HYDROGRAPH ON THIS UNIT IS:'_V1 1 FIRST ORDINATE PUNCHED OR SAVED ICAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT 017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN Li;t?.!.OG 01567 .01667 24.00000 *** *** *** *** *** *** ••x *** *** *** *** **,, *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ************a* * 20 KK * PRE 24 KO OUTPUT CONTROL VARIABL':S IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IP1"CH 0 PUNCH COMPUTED HYDROGRAPH IOZJT 21 SAVE HYDROGRAPH ON THIS UNIT ISiV1 1 FIRST ORDINATE PUNCHED OR SAVED :WW2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LC+`T_CG .01,367 .01667 24.00000 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIM OPERATION STATION FLOW PEAK 6-HOUR 24-HOUR 72-HOUR AREA STAG HYDROGRAPH AT RAIN 0. 00 0 O. 0. .00 HYDROGRAPH AT PRE 2. 12.48 0 0. O. .00 *** NORMAL END OF HEC-1 *** Hydrograph Peak Flow Rate Peak Flow I Total Volume Name (CFS) Date/Time ( x1000(CF) RAIN 0.0 Dec 01, 1900 00:01 0.0 PRE 1.603 Dec 01, 1900 12:30 7.949 HEC-1 INPUT LINE ID 1. . . . . .2 . - . 3. 4 5 .6 . .7. . . . .8 . . . . .9. . ... .10 1 ID DKOTA SALISBURY 2 ID PRE-DEVELOPED 10 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 RR RAIN 7 RM 1 YEAR 8 KM 0 0 0.384 0.767 1.31 1-51 1.61 1.95 2.29 2.73 9 KM 2 YEAR 10 KM 0 0 0.455 C 914 1.58 1.83 1.94 2.34 2.76 3.3 11 Fit 10 YEAR 12 PH 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4,01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 NM 50 YEAR 16 'M 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 KM 100 YEAR 18 NM 0 0 0.716 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 KC 21 20 MN PRE 21 3A. 0.0028 22 LS 76 23 LID 0.404 24 NC- 21 25 W. ***************************************** ***************** * * * * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CO * JUN 1998 * * HYDROLOGIC E * VERSION 4.1 * * 609 SE * * * DAVIS, CA * RUN DATE 22AUG23 TIME 07:45:18 * * (916) * * * ***************************************** ***************** DKOTA SALISBURY PRE-DEVELOPED 10 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPn TIME DATA NMIN 1 MINUTES IN COMPUTATION INTERVAL IDATE 1 C STARTING DATE ITIME 0000 STARTING TIME 180.0 NUMBER OF HYDROGRAPH ORDINATES • NDD.E..TE 2 C ENDING DATE NDTTMM 0559 ENDING TIME ICEXT 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS T:'"AL TIME BASE 29.9a HOURS ENGLISH UNITS DRAINAGE ARIA F.C'IARE MILES PRECIPITAT:?N DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUEIC .'?EET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE' DEGREES FAHRENHEIT *** *** *** *** *** *** ....* *k* rt** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ***********k*.z * 6 KK * RAIN * * ************** 19 KO OUTPUT CONTROL =IAI3LES IPRNT 5 PRINT CONTROL IP.LOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH TOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISTIV1 1 FIRST ORDINATE PUNCHED OR SAVED ISrV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN 'LG3L_OG 01667 .01667 24.00000 *** *** *** *** *** *** x •k *** *** *** **.. *** *r,t *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ************** 20 RK * PRE * ************** 24 KO OUTPUT CONTROL VARIABLES IRINT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPLCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT IS:AV1 1 FIRST ORDINATE PUNCHED OR SAVED �S V2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN :i>7CJG 016,=.7 01667 24.00000 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIM OPERATION STATION FLOW PEAK 6-HOUR 24-HOUR 72-HOUR AREA STAG HYDROGRAPH AT RAIN 0 .00 0. 0. 0. .00 HYDROGRAPH AT PRE 3. 12.47 1. 0. 0. .00 *** NORMAL END OF HEC-1 *** Hydrograph Peak Flow Rate Peak Flow ' Total Volume Name ICFS; Date/Time x1000(CF) RAIN 0.0 Dec 01, 1900 00:01 0.0 PRE 3.025 Dec 01, 1900 12:29 15.427 HEC-1 INPUT LINE ID 1. . . . .2 3. . . 4 5. 6. . , . . . .7. . .. .. .8 9 . . ..10 1 ID DKOTA SALISBURY 2 ID PRE-DEVELOPED 50 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 KK RAIN 7 KM 1 YEAR 8 KM 0 0 0.384 0 767 1.31 1.51 1.61 1.95 2 29 2.73 9 KM 2 YEAR 10 KM 0 0 0.455 0.914 1.58 1.83 1.94 2.34 2.76 3.3 11 KM 10 YEAR 12 KM 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 M 50 YEAR 16 PH 0 0 0.681 1.37 2.8 3 36 3.65 4.45 5.35 6.41 17 _M 100 YEAR 18 NM 0 0 0.716 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 NC 21 20 r?: PRE 21 3:". 0.0028 22 LS 76 23 JD 0,404 24 i?4 21 25 7,Z ***************************************** ***************** * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CO * JUN 1998 * * HYDROLOGIC E * VERSION 4.1 * 609 SE * * * DAVIS, CA * RUN DATE 22AUG23 TIME 07:46:33 * * (916) ***************************************** ***************** DKOTA SALISBURY PRE-DEVELOPED 50 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCATHE IT HYDROGRAPH TIME DATA W7N 1 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME 3.Q0') NUMBER OF HYDROGRAPH ORDINATES NDDa_TE 2 0 ENDING DATE NDTINE 0559 ENDING TIME ICFY^ 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS T.:.'"'AL TIME BASE 29 93 HOURS ENGLISH UNITS DRAINAGE AZT A SC'ARZ MILES PRECIPITA7:O-7 DEPTH INi:HE i LENGTH, F,'.'ATION FLOW Cr'^IC .7IET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AR=A ACRES TEMPERATUR: DEGREES F'AHP.ENHEIT *** *** *** *** *** *** *:. *k* .** ** 4** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ************** 6 KR * RAIN * * ************** 19 KO OUTPUT CO".TRO_- VARTAB E IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPLTCH 0 PUNCH COMPUTED HYDROGRAPH ICUT 21 SAVE HYDROGRAPH ON THIS UNIT ISi,V1 1 FIRST ORDINATE PUNCHED OR SAVED 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN .LCGLOG O1E67 .01667 24.00000 *** *** *** *** *** *** • •k *** *** *** ** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * * 20 Eac * PRE -• * 24 KO OUTPUT CONTROL VARIABLES IP!�NT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPL;CH 0 PUNCH COMPUTED HYDROGRAPH LOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISTM1 1 FIRST ORDINATE PUNCHED OR SAVED IS:.V'2 1800 LAST ORDINATE PUNCHED OR SAVED TIM:NT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LGO:•;OG 01r;•;7 01667 24.00000 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIM OPERATION STATION FLOW PEAK 6-HOUR 24-HOUR 72-HOUR AREA STAG HYDROGRAPH AT RAIN 0. .00 0 0. 0 00 HYDROGRAPH AT PRE 4. 12.47 1 0. 0 00 *** NORMAL END OF HEC-1 *�* • Hydrograph Peak Flow Rate Peat:Flow Total Volume Name (CFS) Date/Time x1000(CF) RAIN 0.0 Dec 01, 1900 00:01 0.0 PRE 4.395 Dec 01, 1900 12:29 24.305 3 Post Developed Using NCDEQ sand filter design guidelines. Drainage area= 1.76 acres(0.00275 mi2) Total Post BUA= 1.28 acres Curve Number=98 Grassed Area=0.48 acres Curve Number=74 BUA= 1.28/1.76=72.7% Water Quality Volume Compute Runoff Volume Rv BUA 55,763 ft2 ( 1.28 ac.) % Impervious= 1.28/1.76= 73% Rv= 0.05 +0.9Ia=0.05 + 0.9(0.73)= 0.71 SAND FILTER MDC 3. SEDIMENT/SAND CHAMBER SIZING. The volume of water that can be stored in the sediment chamber and the sand chamber above the sand surface combined shall be 0.75 times the treatment volume. The elevation of bypass devices shall be set above the ponding depth associated with this volume. The bypass device may be designed to attenuate peak flows. The area required for a sand filter device is calculated similarly to many other SCMs: 1. Calculate the design volume. 2. Multiply the design volume by 0.75, a"discount"that is allowed because stormwater infiltrates so rapidly through the sand media that the stormwater is treated throughout the storm event. By the end of the storm, the runoff from the beginning of the storm has already been treated and has exited the sand filter. 3. Divide the discounted design volume by the ponding depth. this will be the minimum surface area of the sand filter. 4. If the sand filter is designed to attenuate peak flows, additional surface area may be added in the sediment chamber only.The sand filter must be designed so that 50% of the treatment volume can be stored in the sand chamber below the first bypass device. DV= 3630 x RD x Rv x A = 3630 x 1 x 0.71 x 1.76 =4,536 ft3 Apply 75% "discount" =3,402 ft3 Ponding depth of 6', filter area= 3402/5.9' = Minimum Surface Area=567 ft2 Use 128" x 83" elliptical CMP,with 9.9' x 58' =574 ft2 sand filter Soils, open good Chewada B =61 , Sedgefield C= 74 CN=(61 + 74)/2 = 67.5 CNW = [(1.28 x 98) +(0.48 x 67.5)] / 1.76= 89.68 4 Depth of Sand= 18"min. with 6"perforated underdrain Store 50% of Treatment volume before first bypass device= 3402/2 = 1701 ft3 SAND FILTER MDC 2. TWO CHAMBER SYSTEM. The sand filter shall include a sediment chamber and a sand chamber. Storage volume in each chamber shall be equivalent. Provide equal sediment storage as volume of sand filter. From Elliptical pipe diagram page 5,Area of filter= 10.6 ft2 remaining void=49.9 sf Sand filter volume= (10.6 ft2 x 58 ft)=615 ft3 Provide equal length 58' for sediment chamber flat section 0% Elevation=758.61, Set first orifice at 759.00 Calculate volume,pipe is flat, area available=49.9 sf x 232' = 11,576.8 cf,=0.266 ac.ft. @ 763.69 Since two sections of pipe are needed for attenuation of peak flows,the volume that will be retained in the sediment storage area= 174' x 10.6 sf= 1844 cf 5 - - I Cr in AREA=49.9 SF 112,64" 9.9' r AREA=10.6 SF o CO 10'-3 f 128"x83" NOMINAL PIPE ARCH SAND FILTER R.\Drawings\2023 Proiects\Dkota Salisbury\DAK_S30,24.dwq,1.20 6 Results of HEC-1 Analysis (see Calculations) Storm Pre-Devlp. Post- Routed Stage Comment (cfs) Devlp.(cfs) (cfs) Elev. (ft.) 1"-6 Hour na 1.197 0.033 758.60 40 Hr.OK 1- Year 24 Hour 1.065 4.726 0.79 760.31 Post<Pre OK 2-Year 24 Hour 1.60 7.184 1.125 761.41 Post<Pre OK 10-Year 24 Hour 3.03 10.167 1.606 763.64 Post<Pre OK 50-Year 24 Hour 4.40 12.447 6.725 764.09 WE< Top Pipe OK 7 Stage-Discharge 1.Sand filter Depth Area K 1.50 I 574.00 3 5 2.Orifice Dia.(in) Elev 5.00 759 00 F= 0 1364 Sf. Head Measured from 759.21 3.Orifice Dia.(in) Elev 0.00 0.00 A= 0 Sf. Head Measured from 0.00 4.Weir Length =Bev 4.00 ft. 763.69 5.Weir Lerioth Elev 0.00 III 0 00 Stage 1,Sand 2.Orifice 3.Orifice 4.Weir 5.Weir Total Flow Filter Box 757.75 0.000 0.00 . 0.00 0.00 0.00 0.000 758.00 0.023 0.00 0.00 0.00 0.00 0.023 759.00 0.039 0.00 0.00 0.00 0.00 0.039 760.00 0.054 0.63 0.00 0.00 0.00 0.687 761.00 0.070 0.95 0.00 0.00 0.00 1.022 762.00 0.085 1.19 0.00 0.00 - 0.00 1.274 763.69 0.111 1.51 0.00 0.00 0.00 1.617 764.78 0.128 1.68 0.00 13.56 0.00 15.463 0.00 -11.727 0.00 0.00 0.00 0.00 -11.727 0.00 -11.727 0.00 0.00 0.00 0.0:F -11.727 Basic Orifice Equation Basic Weir Equation 0 = C'dA I2gh Q = C,.LH3 cd = 0.65 ` c4. =3.0 g = 32.2ft / sec ` 8 HEC-1 INPUT PAGE 1 LINE ID 1 2 3 4 5 6 7 8 9 10 1 ID DAKOTA SALISBURY 2 ID 1 INCH, 6 HOUR STORM ROUTED ONLY THROUGH SAND FILTER 3 ID GEOSCIENCE GROUP, INC. 4 IT 2 0 0 3600 5 IN 5 0 0 6 IO 5 0 0 7 KK POST 8 PB 1 9 PI 0 0.003 0.003 0.003 0.003 0.003 0.003 0.004 0.004 0.004 10 PI 0.004 0.004 0.004 0.004 0.004 0.005 0.005 0.005 0.005 0.006 11 PI 0.007 0.007 0.007 0.008 0.008 0.009 0.009 0.01 0.011 0.012 12 PI 0.013 0.019 0.022 0.025 0.039 0.05 0.108 0.188 0.075 0.043 13 PI 0.028 0.023 0.02 0.014 0.012 0.011 0.01 0.009 0.009 0.008 14 PI 0.008 0.007 0.007 0.007 0.006 0.005 0.005 0.005 0.005 0.005 15 PI 0.004 0.004 0.004 0.004 0.04 0.004 0.004 0.004 0.003 0.003 16 PI 0.003 0.003 0.003 0 17 KK POST 18 KO 0 0 0 0 21 19 BA 0.0028 20 LS 0 89.68 21 UD 0.05 22 KK ROUTE 23 KO 21 24 RS 1 ELEV 757.75 25 SV 0 0.266 26 SE 757.75 763.69 27 SQ 0 0.023 0.039 0.054 28 SE 757.75 758 759 760 29 KM TOP PIPE 763.69 30 ST 766.69 4 3 1.5 31 ZZ 1***************************************** *************************************** * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * JUN 1998 * * HYDROLOGIC ENGINEERING CENTER * VERSION 4.1 * * 609 SECOND STREET * * * DAVIS, CAT IFORNIA 95616 * RUN DATE 31MAY24 TIME 13:18:44 * * (916) 756-1104 ***************************************** *************************************** DAKOTA SALISBURY 1 INCH, 6 HOUR STORM ROUTED ONLY THROUGH SAND FILTER GEOSCIENCE GROUP, INC. *** ERROR *** SPECIFIED START AND END DATES RESULT IN TOO MANY TIME PERIODS 6 I0 OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSC'AT 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 2 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 2000 NUMBER OF HYDROGRAPH ORDINATES NDDATE 3 0 ENDING DATE NDTIME 1838 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .03 HOURS TOTAL TIME BASE 66.63 HOURS ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES 9 LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT *** *** *** r** *** *** r** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** 17 KK * POST * ************** 18 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAT 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH LOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .033 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * * 22 KK * ROUTE * ************** 23 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH LOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .033 TIME INTERVAL IN HOURS 1 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT + POST 0. .00 0_ 0. 0. .00 HYDROGRAPH AT + POST 1. 3.20 0. 0. 0. .00 ROUTED TO + ROUTE 0. 5.57 0. 0. 0. .00 + 758.61 6.10 1 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION ROUTE (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 757.75 766.69 766.69 STORAGE 0. 0. 0. OUTFLOW 0. 0. 0. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 758.61 .00 0. 0. .00 6.10 .00 10 +++ NORMAL END OF HEC-1 +++ n ' D �1 69) i :19. Input ; Output Chart Graph]rS ummary T able Data Table, rHvdroor- . N Peak Flow Rate(C .. I Peak FlowDateTme 'Total Volumexl POST 1 197 Dec 01 1900 03 14 2 007 ROUTE 0 033 Dec 01- 1900 05 36 1 997 Check drawdown time, 2402 min. =40 hours fl Input J Output Chart Graph I Summary Table II Data Table Time(Minutes) POST ROUTE (CFS) I (CFS) 2392 00 0001 2394 00 0001 2396 0 0 0.001 2398 0 0 0 001 2400 0 0 0 001 2402 0 0 0.0 11 1 HEC-1 INPUT PAGE 1 LINE ID 1 2 3 4 5 6 7 8 9 10 1 ID DAKOTA SALISBURY 2 ID 1 YEAR 24 HOUR STORM POST DEVELOPED 3 ID GEOSCIENCE GROUP, INC. 4 IT 3 0 0 3600 5 IN 5 0 0 6 IO 5 0 0 7 KK 8 PE 2.58 9 PI 0 0.001 0.001 0.001 0.0011 0.001 0.0011 0.001 0.0011 0.0011 10 PI 0.0011 0.0011 0.0011 0.0011 0.0012 0.0011 0.0012 0.0011 0.0012 0.0012 11 PI 0.0012 0.0012 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0013 0.0013 12 PI 0.0013 0.0013 0.0013 0.0013 0.0014 0.0013 0.0014 0.0014 0.0013 0.0014 13 PI 0.0014 0.0014 0.0014 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0016 14 PI 0.0016 0.0016 0.0016 0.0017 0.0017 0.0016 0.0018 0.0017 0.0017 0.0018 15 PI 0.0018 0.0018 0.0018 0.0019 0.0019 0.0018 0.002 0.0019 0.0019 0.002 16 PI 0.002 0.002 0.002 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0022 17 PI 0.0022 0.0022 0.0024 0.0024 0.0026 0.0026 0.0028 0.0029 0.0029 0.003 18 PI 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0033 0.0034 0.0036 0.0038 19 PI 0.0039 0.0041 0.0044 0.0046 0.0048 0.0051 0.0054 0.0058 0.0062 0.0066 20 PI 0.007 0.0077 0.0086 0.0096 0.0106 0.0115 0.0238 0.0476 0.0764 0.1371 21 PI 0.0951 0.019 0.0166 0.0144 0.0122 0.0098 0.0084 0.008 0.0074 0.0068 22 PI 0.0064 0.006 0.0056 0.0054 0.0052 0.0048 0.0046 0.0044 0.0042 0.004 23 PI 0.0038 0.0037 0.0036 0.0035 0.0034 0.0034 0.0033 0.0033 0.0032 0.0031 24 PI 0.003 0.003 0.0029 0.0028 0.0027 0.0027 0.0026 0.0026 0.0025 0.0024 25 PI 0.0023 0.0023 0.0022 0.0023 0.0022 0.0022 0.0022 0.0021 0.0021 0.0021 26 PI 0.0021 0.002 0.002 0.002 0.0019 0.002 0.0019 0.0019 0.0018 0.0018 27 PI 0.0018 0.0018 0.0017 0.0018 0.0017 0.0017 0.0016 0.0017 0.0016 0.0016 28 PI 0.0015 0.0016 0.0015 0.0015 0.0015 0.0014 0.0014 0.0014 0.0013 0.0014 29 PI 0.0013 0.0013 0.0013 0.0013 0.0013 0.0012 0.0013 0.0013 0.0012 0.0013 30 PI 0.0012 0.0013 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0012 0.0012 31 PI 0.0012 0.0012 0.0012 0.0012 0.0012 0.0011 0.0012 0.0012 0.0011 0.0012 32 PI 0.0011 0.0012 0.0011 0.0012 0.0011 0.0011 0.0012 0.0011 0.0011 0.0011 33 PI 0.0011 34 KK POST 35 KM POST DEVELOPED 36 KO 21 37 BA 0.0028 38 LS 0 89.68 39 UD 0.05 40 KO 21 41 KK ROUTE 42 RS 1 ELEV 757.75 43 SV 0 0.266 44 SE 757.75 763.69 45 SQ 0 0.023 0.039 0.687 1.022 1.274 1.617 46 SE 757.75 758 759 760 761 762 763.79 47 KO 21 48 ST 763.69 4 3 1.5 49 ZZ 1***************************************** *************************************** * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * * JUN 1998 * * HYDROLOGIC ENGINEERING CENTER * VERSION 4.1 * * 609 SECOND STREET * * * DAVIS, CALIFORNIA 95616 * RUN DATE 31MAY24 TIME 14:26:50 (916) 756-1104 * * * ***************************************** *************************************** DAKOTA SALISBURY 1 YEAR 24 HOUR STORM POST DEVELOPED GEOSCIENCE GROUP, INC. *** ERROR *** SPECIFIED START AND END DATES RESULT IN TOO MANY TIME PERIODS 6 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL 12 IPLOT 0 PLOT CONTROL QSCAT 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 3 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 2000 NUMBER OF HYDROGRAPH ORDINATES NDDATE 5 0 ENDING DATE NDTIME 0357 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .05 HOURS TOTAL TIME BASE 99.95 HOURS ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT *** ************** 34 KK * POST * ************** 36 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAT 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .050 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** **r *** *** r** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** 34 KK * POST * ************** 40 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAT 0. HYDROGRAPH PLOT SPATE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .050 TIME INTERVAL IN HOURS ************** 41 KK * ROUTE * *******r****** 47 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SPATE IPNCH 0 PUNCH COMPUTED HYDROGRAPH 13 IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .050 TIME INTERVAL IN HOURS 1 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT + 0. .00 0. 0. 0. .00 HYDROGRAPH AT + POST 5. 10.05 0. 0. 0. .00 ROUTED TO + ROUTE 1. 10.30 0. 0. 0. .00 + 760.31 10.30 1 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION ROUTE (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 757.75 763.69 763.69 STORAGE 0. 0. 0. OUTFLOW 0. 2. 2. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 760.31 .00 0. 1. .00 10.30 .00 *** NORMAL END OF HEC-1 *** ID F r E11t ,,r. _ rr? iU' _-i:hr Fly�1 ol Gird I.JIEDI tI liki input I output chart I Graph]I Summary Table Data Tabie I Hvdrooraohti Peak Flow Rate(C. I Peak FlowDateTne I Total Volumex1 I I POST 4 726 Dec 01 1900 10 06 10.26 iROUTE 079 Dec01 1900 10 21 10258 14 1 HEC-1 INPUT PAGE 1 LINE ID 1 2 3 4 5 6 7 8 9 10 1 ID DKOTA SALISBURY 2 ID POST-DEVELOPED 2 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 KK RAIN 7 KM 1 YEAR 8 KM 0 0 0.384 0.767 1.31 1.51 1.61 1.95 2.29 2.73 9 KM 2 YEAR 10 PH 0 0 0.455 0.914 1.58 1.83 1.94 2.34 2 76 3.3 11 KM 10 YEAR 12 KM 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 KM 50 YEAR 16 KM 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 KM 100 YEAR 18 KM 0 0 0.716 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 KO 21 20 KK POST 21 BA 0.0028 22 LS 89.68 23 UD 0.05 24 KO 21 25 KK MAIN 26 KO 21 27 RS 1 ELEV 757.75 28 SV 0 0.266 29 SE 757.75 763.69 30 SQ 0 0.023 0.039 0.687 1.022 1.274 1.617 15.463 31 SE 757.75 758 759 760 761 762 763.69 764.78 32 KO 21 33 KM INSIDE TOP LID OF CONTROL BOX 34 ST 764.78 4 3 1.5 35 KO 21 36 ZZ 1***************************************** *************************************** * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * JUN 1998 * * HYDROLOGIC ENGINEERING CENTER * VERSION 4.1 * * 609 SECOND STREET * * * DAVIS, CALIFORNIA 95616 * RUN DATE 31MAY24 TIME 14;30:03 * * (916) 756-1104 * * * ***************************************** DKOTA SALISBURY POST-DEVELOPED 2 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAT 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 1 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 1800 NUMBER OF HYDROGRAPH ORDINATES NDDATE 2 0 ENDING DATE NDTIME 0559 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS TOTAL TIME BASE 29.98 HOURS 15 ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *•* r** *** *** *** *****r******r* 6 KK * RAIN ************** 19 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAT, 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG .01667 .01667 24.00000 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *r* *** *** *** *** *** *** *** *** *** *** ************** 20 KK * POST * 24 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 L➢CT ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG .01667 .01667 24.00000 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** 25 KK * MAIN * * * ************** 26 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SC'ATE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** 16 ************** 25 KK * MAIN * ************** 32 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL ()SCAT 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** 25 KK * MAIN * ************** 35 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS 1 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT RAIN 0. .00 0. 0. 0. .00 HYDROGRAPH AT POST 7. 12.07 1. 0. O. .00 ROUTED TO + MAIN 1. 12.40 0. 0. 0. .00 + 761.41 12.42 1 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION MAIN (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 757.75 764.78 764.78 STORAGE 0. 0. 0. OUTFLOW 0. 15. 15. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 761.41 .00 0. 1. .00 12.42 .00 *** NORMAL END OF HEC-1 *** 17 F,IC f.t,! .;e., her! Pon Input Output Chart Graph TSummary Table Data Table HvoroaraohN Peak Flow Rate(D I Peak FlowDater'Time !Total Volumex1 F— RAN 0 0 Dec 01 1900 00.01 0 0 POST 7 184 Dec 01 1900 12 05 14 526 MAIN 1 125 Dec 01 1900 12 24 12 802 18 HEC-1 INPUT PAGE 1 LINE ID 1 2 3 4 5 6 7 8 9 10 1 ID DKOTA SALISBURY 2 ID POST-DEVELOPED 10 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 10 5 0 0 6 KK RAIN 7 KM 1 YEAR 8 KM 0 0 0.384 0.767 1.31 1.51 1.61 1.95 2.29 2.73 9 KM 2 YEAR 10 KM 0 0 0.455 0.914 1.58 1.83 1.94 2.34 2.76 3.3 11 KM 10 YEAR 12 PH 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 KM 50 YEAR 16 KM 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 KM 100 YEAR 18 KM 0 0 0.716 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 KO 21 20 KK POST 21 BA 0.0028 22 LS 89.68 23 UD 0.05 24 KO 21 25 KK MAIN 26 KO 21 27 RS 1 ELEV 757.75 28 SV 0 0.266 29 SE 757.75 763.69 30 SQ 0 0.023 0.039 0.687 1.022 1.274 1.617 15.463 31 SE 757.75 758 759 760 761 762 763.69 764.78 32 KO 21 33 KM INSIDE TOP LID OF CONTROL BOX 34 ST 764.78 4 3 1.5 35 KO 21 36 ZZ ***************************************** *************************************** * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * JUN 1998 * * HYDROLOGIC ENGINEERING CENTER * VERSION 4.1 * * 609 SECOND STREET * * * DAVIS, CALIFORNIA 95616 * RUN DATE 31MAY24 TIME 14,33:32 (916) 756-1104 ***************************************** *************************************** DKOTA SALISBURY POST-DEVELOPED 10 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 1 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 1800 NUMBER OF HYDROGRAPH ORDINATES NDDATE 2 0 ENDING DATE NDTIME 0559 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS TOTAL TIME BASE 29.98 HOURS 19 ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** 6 KK * RAIN * * * ************** 19 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL OSrAT 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG .01667 .01667 24.00000 ************** 20 KK * POST * ************** 24 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSrAT 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 IAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG .01667 .01667 24.00000 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** 25 KK * MAIN * 26 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 7,AST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** 20 ********++++++ 25 KK * MAIN * ************** 32 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSC'A7 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 TART ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS **+*++******** 25 KK * MAIN * 35 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 TART ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS 1 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT + RAIN 0. .00 O. 0. 0. .00 HYDROGRAPH AT + POST 10. 12.07 1. 0. 0. .00 ROUTED TO + MAIN 2. 12.48 1. 0. 0. .00 + 763.64 12.52 1 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION MAIN (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 757.75 764.78 764.78 STORAGE 0. 0. 0. OUTFLOW 0. 15. 15. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 763.64 .00 0. 2. .00 12.52 .00 *** NORMAL END OF HEC-1 *** 21 ❑1 Girl I�J r Input I Output Chat I Graph II Summary Table Data Table HvdroaraohN Peak Flow Rate(C I Peak FlowDate/Time I Total Volumex1 RAIN 0 0 Dec 01 1900 00 01 0 0 POST 10 167 Dec 01 1900 12 05 23 747 MAIN 1 606 Dec 01 1900 12 30 21 993 22 HEC-1 INPUT PAGE 1 LINE ID 1 2 3 4 5 6 7 8 9 10 1 ID DKOTA SALISBURY 2 ID POST-DEVELOPED 50 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 KK RAIN 7 KM 1 YEAR 8 KM 0 0 0.384 0.767 1.31 1.51 1.61 1-95 2.29 2.73 9 KM 2 YEAR 10 KM 0 0 0.455 0.914 1.58 1.83 1.94 2.34 2.76 3.3 11 KM 10 YEAR 12 KM 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 KM 50 YEAR 16 PH 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 KM 100 YEAR 18 KM 0 0 0.716 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 KO 21 20 KK POST 21 BA 0.0028 22 LS 89.68 23 UD 0.05 24 KO 21 25 KK MAIN 26 KO 21 27 RS 1 ELEV 757.75 28 SV 0 0.266 29 SE 757.75 763.69 30 SQ 0 0.023 0.039 0.687 1.022 1.274 1.617 15.463 31 SE 757.75 758 759 760 761 762 763.69 764.78 32 KO 21 33 KM INSIDE TOP LID OF CONTROL BOX 34 ST 764.78 4 3 1.5 35 KO 21 36 ZZ 1***************************************** *************************************** * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * JUN 1998 * * HYDROLOGIC ENGINEERING CENTER * VERSION 4.1 * * 609 SECOND STREET * * * DAVIS, CALIFORNIA 95616 * RUN DATE 31MAY24 TIME 14:35:26 (916) 756-1104 * * * ***************************************** *************************************** DKOTA SALISBURY POST-DEVELOPED 50 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAT 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 1 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 1800 NUMBER OF HYDROGRAPH ORDINATES NDDATE 2 0 ENDING DATE NDTIME 0559 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS TOTAL TIME BASE 29.98 HOURS 23 ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT *** *** *** *** *** *** *** *** *** *r* *** *** *** *** *** *** *** *** *** *** r** *** *** *** *** *** *** **r *r* *** *** *** ************** 6 KK * RAIN * 19 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH LOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG .01667 .01667 24.00000 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** **x ************** 20 KK * POST * ****r********* 24 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAT 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG .01667 .01667 24.00000 *** *** *** *** *** **r *** *** *** *** *** *** *** *** *** **r *** *** *** *** *** *** *** *** *** *** *r* *** *** *** *** *** ************** 25 KK * MAIN * * * ************** 26 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAT 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS *** *** *** *** *** *** *r* *** *r* r** *** *** *** *** *** *** *** **r r** *** *** *** *** *** *** *** *** *** *** *** *** *** 24 ************** 25 KK * MAIN * * * ************** 32 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QS CAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *x* *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** 25 KK * MAIN * ************** 35 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL ()SCAT, 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 VAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS 1 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT + RAIN 0. .00 0. 0. 0. .00 HYDROGRAPH AT + POST 12. 12.07 1. 0. 0. .00 ROUTED TO + MAIN 7. 12.17 1. 0. 0. .00 + 764.09 12.17 1 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION MAIN (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 757.75 764.78 764.78 STORAGE 0. 0. 0. OUTFLOW 0. 15. 15. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 764.09 .00 0. 7. .00 12.17 .00 *** NORMAL END OF HEC-1 *** 25 File E j,' DIgilV1aI Input I Output Chart Graph j I Summary Table Data Table trgrrirnioPeak Flow Rate(C I Peak Flow DateiTime "Total Volumexl. r RAIN 0 0 Dec 01 1900 00 01 0 0 POST 12 447 Dec 01 1900 12 05 33 889 MAIN 6 725 Dec 01 1900 12.11 32 172 Primary Spillway Deadman Calculations Unit Weight Concrete (lbs/ft3)= 145 Unit Weight Water(Ibs/fe)= 62.4 Invert Riser 756.20 Inside Control Box roof 763.75 Hydraulic Head (ft.) 7.55 Outside Dimension of Square Riser(ft.) 5.0 Area (ft2) 25 Factor of Safety 1.25 Bouyant Force (lbs.) 11,778 Bouyant Force with F.S.(Ibs.) 14,722 Deadman Thickness (ft.) 2.0 Deadman Dimension- Square (ft.) 9.44 Use E 9 ft 26 Outlet Pipe Project D0.....ritA m Fricoon Method Manr`"r g Formula Salve Fir Full Haw Capacity Input Data Roughness Coeffioent 0.012 Cannel Slope 0.003 ft(h Normal Depth 24.0 in Diameter 24.0 in Discharge 17.33 cfs Results Discharge 17.33 cfs Normal Depth 24.0 in Flow Area 3.1 ft. Wetted Per. e er 6.3 ft Hydraulic Radius 6.0 n Top Width 1.30 ft Conical Depth 18.0 in Percent Ful 100.0% Criocal Slope 0.006 Mt Velocity 5.52 Ws Velocity Head 0.47 ft Specific Energy 2.47 ft trade Number Maximum Discharge 18.64 cfs D'_scharge Full 17.33 cis Slope Fug 0.005 ftlft Flow Type Subrntcal GVF input Date Downstream Depth 0.0 in Length 0.0 ft Number Of Sazps 0 GVF Output Data Upstream Depth 0.0 in Profile Deucnpoon N/A Profile Head,oss 0.00 ft Average End Depth Over'lbse 0.0% Normal Depth Over Rise 0.0% Downstream Velcary 0.00 ft/s Upstream Veloary 0.00 ft4 Normal Depth 24.0 in Critical Depth 18.0 in Channel.Slope 0.005 ftft Crecal Slope 0.006 fdfc 8.rae,Svstet,Ft naa.m►.aces S,* v,. F.o5foac .KCe®11 ulna Cara.- 00030D 071 9 1,2021 ew 1.00.t.CT 06�795UUS +I,20175516E2 Pap.7 of t Figure 8.O6a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<0.5 diameter) �. l `� � , 1 Outer W D + -a 90 _ i , i i diarnete• (Doi /� La _ _� HO.11 �S ; giallwater • 0.5110 l t,. 70 . I 1 I 4a�t1 f 4 ' - te/s r0� fit, • i �01 "- 60 _ - -4• • sk . . 4.. : '::::::t .-___ --• 1 0:4 irfilifie4 •4. .'i 1:4 0 I le Ill r. . 7.ue. -7_,, 0 . _ ._ ............_, _44....____ _ Q, ,, .d. •2 c;.)., 4. 4 . 1 . t— , . rii- am .., �._ E n is . >� ����� Mr 111 f 3 5 10 20 5n 100 200 500 1000 Discharge ttt3rsec) Cu•ves may not be extrapolated Nrgu a 8.06a Design of o:n'a:t. otr'r:ic:r p•otecbo i 4 um a round c,pe flowing full uirururr t:arl;nate-condition("r`„.•0.5 0 ameter) Re .12'93 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing ft tailwater condition (Tw<0.5 diameter) Outlet W Do + .a pipe tameae ;Doi , �,, I • I.---la , , sa . . ilwater - 0,500 �_ O 41 - I. —14' -' - 7 ,`: 7"--1.. . a1 .:; . o . �` SS I 6 s � to — . a : .Ifs a . ' _ _ .� L� "„ :iiii.: 4. . ....1 . _. , .....25 7--,. .:,____t , . / 6 _,_,..---,. - - / v z 5 i 3 5 IC 100 2 0©- 0C 1,2—,L-i'l Discharge fft3/sect LPyT2- Curves may not be extrapolated Figure 3.06a Design of outr:t sror:rtwr;:-rat`c1ic•i'um a round .pe ffowir;fr:0.ranir:rrr.urr L ibw.:e'cordt►on(Tw<C