Loading...
HomeMy WebLinkAbout20220795 Ver 2_2024-04-04_McCoy Farm NCDEQ 2nd Submital SCM Calc Binder_20240611STORMWATER SCM CALCULATIONS MCCOY FARM Wesley Chapel, North Carolina Prepared for: Mills Ventures, LLC. Prepared by: DPR DESIGN 919 Berryhill Rd. Charlotte, NC 28208 PH: 704-332-1204 www.dpr.design DPR Project #: 19076 February 9th, 2022 � April 4th, 2024 ���\11N4114111111111������ C A R p ii���0 \\\����� C ARO� �'SSI� °a SEAL r° _ * C-650 030523 OWE ` SCC� AHyVI lGytjoDPR Associates, Inc. MCCOY FARM SCM DESIGN NARRATIVE DPR No. 19076 02-09-2022 Revision: 03-27-2024 The enclosed calculation package is to show the results of the stormwater SCM design for the proposed McCoy Farm development. The development is located in Wesley Chapel, Union County, North Carolina, on the West side of Wesley Chapel Rd. (SR-1162) just North of Potter Rd. The net site area is approximately 64.3 acres. The existing condition is open and wooded. This project's proposed development type will be single family residential. A total of three (2) SCM facilities are on site. Both are sand filters. All were designed per the most recent NC DENR Stormwater SCM manual. Topographic maps and field observations were used to delineate the watershed basins and hydraulic path feeding into the study conveyance system. With this information, hydraulic lengths, time of concentrations (TOC), and basin slopes were determined for the pre -developed conditions. TOC of 5 min. was used for all post -developed conditions. The total impervious areas of the development were calculated. The composite curve numbers (CN) were calculated based on the hydrologic soil types and groups from the U.S. Department of Agriculture, SCS Union County for the pre - developed and post -developed conditions. Approximately 0.76 AC. of offsite area drains to the SCMs. This area is considered to be 100% BUA. The BUA within the project area + the additional offsite BUA was calculated to be 43.8% of the drainage area. All SCM designs used a BUA of 45%, thereby adequately providing capacity for the offsite theoretical 100% BUA. It should be noted that the offsite BUA is not specifically listed on the BUA calculations. The development was designed using the high density threshold. The development is subject to Wesley Chapel's Detention requirements for peak discharges of 1-yr, 2-yr. 10-yr and 25-yr 24-hr storm events. The proposed SCMS, sand filters 1 & 2 were designed to capture and provide WQ treatment to handle the first 1-inch of rainfall. The sand filter, SCM #2, was designed so modeling results indicate that the SCM will capture and provide WQ treatment to handle the first 1-inch of rainfall plus provide 1-year, 2-year, 10-year, and 25-year (24-hr storm events, using SCS Method). The I` -Inch of rainfall water quality volume was calculated using the Schueler simple method. Post peak flow release rates are less than the Pre -developed peak flow rates. The spillway was designed to safely bypass the larger storm events. Refer to the detailed maps, calculations, results, and details are shown in this package and in the civil engineering subdivision plans. Z:ISharedlProjects12019119076 Carolyn Farm-Kahuna Group-Westley ChapellCALCSISCMICalcs and PDFsl2024- 03-27 5th sub SCM CalcslWorking119076 SCM Narrative.doc Page 1 of 2 Table 1: DRAINAGE AREAS: SCM No. Drainage Area Pre -Developed (+/- Ac.) Drainage Area Post -Developed (+/- Ac.) 1 24.5 25.9 2 6.3 6.3 Tota 1 30.8 32.2 Table 2: PRE -DEVELOPED PEAK DISCHARGES: SCM No. 1Yr - 24 Hr (cfs) 2Yr - 24 Hr (cfs) 10Yr - 24 Hr (cfs) 25Yr - 24 Hr (cfs) 50Yr - 24 Hr (cfs) 100Yr - 24 Hr (cfs) 1 13.43 23.29 54.82 76.85 95.47 115.59 2 2.810 4.927 11.76 16.50 20.53 24.89 Tota I 19.83 34.48 81.35 114.06 141.72 171.61 TABLE 3: POST- DEVELOPED PEAK DISCHARGES: SCM No. 1Yr - 24 Hr 2Yr - 24 Hr 10Yr - 24 Hr 25Yr - 24 Hr - 24 Hr 100Yr - 24 Hr (cfs) (cfs) (cfs) (cfs) F50Yr (cfs) (cfs) 1 55.99 76.70 136.39 174.00 204.29 236.09 2 13.62 18.66 33.18 42.32 49.69 57.43 TABLE 4: DETENTION ROUTING DISCHARGES: SCM No. 1 1Yr - 24 Hr 2Yr - 24 Hr 10Yr - 24 Hr 25Yr - 24 Hr 50Yr - 24 Hr 100Yr - 24 Hr (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 1 1.336 4.776 34.37 60.56 76.11 82.90 2 0.225 0.531 7.174 15.76 26.17 37.45 TABLE 5: POST- DEVELOPED DETENTION ROUTING ELEVATION: SCM No. ]F 1Yr - 24 Hr 2Yr - 24 Hr 10Yr - 24 Hr 25Yr - 24 Hr 50Yr - 24 Hr 100Yr - 24 Hr Elev. Elev. Elev. Elev. Elev. Elev. 1 597.34 597.61 598.68 599.33 599.83 600.39 2 1 613.21 613.55 614.07 614.48 614.74 614.93 Z:ISharedlProjects12019119076 Carolyn Farm-Kahuna Group-Westley ChapellCALCSISCMICalcs and PDFsl2024- 03-27 5th sub SCM CalcslWorking119076 SCM Narrative.doc Page 2 of 2 Project: McCoy Farm DPR DESIGN, LLC. Prepared by: JMM DPR Job #: 19076 PCSO SUMMARY Checked by: HN Location: Wesley Chapel, NC Date: 06-15-2022 Rev: 03/27/2024 PCSO SUMMARY - McCOY FARM Original Parcel ID Number(s): 06024002,06024004-01,06024004C,06024006,06024006A Development Type: Single -Family ISF Detached Subject to PCCO? Y/N NO If NO, why? PCCO District: Catawba River Water Supply Watershed Overlay N/A Stream Name Price Mill Creek Classification C Stream Index 11-138-2-2 Site Area (Net) (ac): 64.37 Disturbed Area (ac): 42.00 SCM All SCM #1 SCM #2 Total Drainage Area (ac): 32.2 25.9 6.3 Existing Built -upon -area (ac): 1.80 Existing BUA to be removed (ac): 1.80 Existing BUA to remain (ac): 0.00 Proposed New BUA (ac): 11.12 Proposed % BUA to SCM: 41.48% (45% used for SCM Design) Proposed % BUA to Site: 20.75% For Overall Site Density (High / Low) High Development or Redevelopment? Development Mitigation Type (if applicable) N/A SUPPLEMENT-EZ COVER PAGE FORMS LOADED COMPLIANCE 7 Width of vegetated setbacks provided (feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 2 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Strip (IS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: HY NGUYEN, PRINCIPLE & ENGINEER 28 Organization: DPR DESIGN 29 Street address: 919 BERRYHILL RD. 30 City, State, Zip: CHARLOTTE, NC 28208 31 Phone numbers : 704-340-0641 321 Email: JMCGIVERN@DPR.DESIGN Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. C A plglq�//i i SEAL 030523 rNE�\�,,�o�\ti°�� NG\3 Hy guy Signature of Designer Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM SAND FILTERS SAND FILTER - SCM 1 SAND FILTER - SCM #2 5 ITotal drainage area (sq ft 1,402,632 1128204 274428 6 lOnsite drainage area (sq ft 1,367,932 1096504 271428 7 JOffsite drainage area (sq ft) ITotal BUA in project (sq ft New BUA on subdivided lots (subject to permitting) (sq ft) 34,700 31700 3000 8 581962 sf 495970 sf 120522 sf 9 430000 sf 343140 sf 86860 sf 10permitting) New BUA not on subdivided lots (subject to s 151962 sf 121130 sf 30662 sf 11 Offsite BUA (sq ft 34700 sf 31700 sf 3000 sf 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft) sf sf sf Sidewalks ft 33431 sf 24738 sf 6262 sf Roof (sq ft sf sf sf Roadway s ft 88137 sf 67511 sf 17089 sf Future (sq ft) sf sf sf Other, please specify in the comment box below (sq ft 30394 sf 23700 sf 6300 sf 13 New infiltrating permeable pavement on subdivided lots s ft sf sf sf 14 New infiltrating permeable pavement not on subdivided lots (sq ft sf sf sf 15 Existing BUA that will remain (not subject to permitting) (sq ft) sf sf sf 16 Existing BUA that is already permitted (sq ft sf sf sf 17 Existing BUA that will be removed (sq ft sf sf sf 18 IPercent BUA 36% 44% 44% 19 Design storm inches 1.0 in 1.0 in 1.0 in 20 Design volume of SCM cu ft 81500 cf 58000 cf 23500 cf 121 Calculation method for design volume Simple Method, Schuler Simple Method, Schuler Simple Method, Schuler ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): Other BUA = Cluster Mailbox and Entry Monuments. Note: Future for HOA area is part of the OTHER BUA values. SAND FILTER 11 Drainage area number 1 2 21 Minimum required treatment volume cu ft 32083 sf 29162 sf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Y-es 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the desi n volume? No No 9 What is the method for dewatering the SCM for maintenance? Other Other 10 If applicable, will the SCM be cleaned out after construction? N/A N/A 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensedprofessional? Yes Yes SAND FILTER MDC FROM 02H .1056 18 SHWT elevation (fmsl) 589 608 19 Type of sand filter (open or closed) Open Open 20 If closed, will the filter will be pre -cast or pour -in -place? 21 If closed, top of grate elevation (fmsl) 22 Is this sand filter designed to attenuate peak flows? Yes Yes Sediment Chamber 23 Volume that can be retained in the sediment chamber (cubic feet) 25000 cf 6000 cf 24 Will there be a permanent pool in the sediment chamber? No No 25 Bottom of the sediment chamber (fmsl) 596.00 612.00 26 Area of the sediment chamber (square feet) 25000 sf 5600 sf 27 Physical depth of the sediment chamber inches 12 in 12 in 28 L2 Ponding depth in the sediment chamber, above any permanent pool inches 9 Elevation of top of weir between chambers (fmsl) 597 613 I Sand Chamber 30 Volume that can be retained in the sand chamber (cubic feet) 21025 cf 10475 cf 31 Bottom of the sand chamber (fmsl) 595.00 611.50 32 Area of the sand chamber (square feet 8050 sf 2650 sf 33 Physical depth of the sand chamber (inches) 24 in 18 in 34 Ponding depth in the sand chamber, above the sand surface inches 24 in 18 in 35 Elevation of the bypass device (fmsl) 597 613 36 Type of bypass device Outlet structure with Orifice Outlet structure with Orifice. 37 Mechanism for distributing flow over the sand surface RIP -RAP BERM RIP -RAP BERM 38 Sand specification for sand chamber ASTM C-33 ASTM C-33 39 Depth above underdrain pipe (inches) 12 in 12 in 40 Will the media be maintained to drain at least two inches per hour at the sand surface? Yes Yes 41 Is at least one clean -out pipe provided at the low point of each underdrain line? Yes Yes 42 Will clean -out pipes be capped? Yes Yes INFORMATION I 43 Please use this space to provide any additional information about the I sand filter(s): SCM #2 only has an impermiable liner to protect against SHWTE infiltration. Dewater: these are sand filters; there should be no need for dewatering; if there is a complete failure of the sand media then any excess water would have to be pumped out; refer to DEWATERING DETAIL on CDs, C3 series. Sand Filter 1 11:35 AM 4/3/2024 Coll w 'p m8 s d PMH J,r HIM- / q I n / I I \ / _� _��\ � / � � � / ' / / � `�\�t..`"°� �� � I / I✓ e1�__�..e,T.� fir' (Ott- v, I/ �% / 1 =L_ i -777�7 � / I vv ✓r / / I v 1 i l �, -- eta"° �g-� _ ,, � i IXl I1�U'vv AM - lop �I %I v v ���--;��_ � `v � °°ice �A � vvim';^• ��el/ 1 � /r/ vvv� �<� `�./� � �� _la///ICI III I I I i I � � a�� . `°°,�v/vv vwv� �`'� `/v ,''%✓-_����r �-- � ' /��� ---- � ��-�i TO TR55 Tc Worksheet Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 1 PRE - POND 1 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.56 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 13.53 + 0.00 + 0.00 = 13.53 Shallow Concentrated Flow Flow length (ft) = 700.00 0.00 0.00 Watercourse slope (%) = 4.40 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.38 0.00 0.00 Travel Time (min) = 3.45 + 0.00 + 0.00 = 3.45 Channel Flow X sectional flow area (sqft) = 13.00 0.00 0.00 Wetted perimeter (ft) = 15.00 0.00 0.00 Channel slope (%) = 1.60 0.00 0.00 Manning's n-value = 0.050 0.015 0.015 Velocity (ft/s) =3.42 0.00 0.00 Flow length (ft) ({0})630.0 0.0 0.0 Travel Time (min) = 3.07 + 0.00 + 0.00 = 3.07 Total Travel Time, Tc.............................................................................. 20.00 min 2 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 2 PRE - SCM 2 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.150 0.011 Flow length (ft) = 98.0 50.0 0.0 Two-year 24-hr precip. (in) = 3.56 3.56 0.00 Land slope (%) = 2.70 2.00 0.00 Travel Time (min) = 17.77 + 5.34 + 0.00 = 23.10 Shallow Concentrated Flow Flow length (ft) = 50.00 306.00 0.00 Watercourse slope (%) = 1.50 2.20 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) =1.98 2.39 0.00 Travel Time (min) = 0.42 + 2.13 + 0.00 = 2.55 Channel Flow X sectional flow area (sqft) = 13.00 0.00 0.00 Wetted perimeter (ft) = 15.00 0.00 0.00 Channel slope (%) = 1.90 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =12.44 0.00 0.00 Flow length (ft) ({0})259.0 0.0 0.0 Travel Time (min) = 0.35 + 0.00 + 0.00 = 0.35 Total Travel Time, Tc.............................................................................. 26.00 min o ------------- \T -�L-Ry L`-HAP�L RD. 0 u) -10 ---------- Project: McCoy Farm DPR DESIGN Prepared by: JMM DPR Job #: 19076 Impervious Estimates Checked by: HN Location: Wesley Chapel, NC Date: 07-05-2023 Rev:03-27-2024 Estimated BUA Breakdown - OVERALL SITE On -Site (43 Lots Total) Proposed Single Family 10,000 SF x 43 lots ......................................... 430,000 sq ft = 9.87 ac (10,000 SF = avg house pad 6,675 SF + 18'x50' +625 SF Driveway avg + sidewalk to front door 300 SF + Patio 500 SF + future allocation 1000 SF) Cluster Mailbox, Entry monuments, & Other Misc................................................... 30,000 sq ft = 0.69 ac Proposed Streets: A RD., B/C-B/C (approx. 26 x 3,050 LF)................................................................ 79,300 sq ft = 1.82 ac Additional Pavement for Cul-De-Sac.................................................... 5,300 sq ft = 0.12 ac Sidewalk (5' Wide).................................................................. 31,000 sq ft = 0.71 ac Driveway within R/W (43 UNITS x 18 x 8)........................................................... 6,192 sq ft = 0.14 ac Total Proposed Streets: F 121,792 sq ft = 2.80 ac Total Impervious Area... M 581,792 sq ft = AEL&C TotalNet Site Area=............................................................................................................... 64.37 ac TOTAL SCM Drainage Area #1 A + #2=................................................................................................ 32.20 ac Impervious Area Summary Imperv. Area % of Imp. Area of % of Imp. Area of (Ac) Site Area DA Area Proposed Single Family 9.87 15.34% 30.66% Proposed CMB & Misc. 0.69 1.07% 2.14% Proposed Streets 2.80 4.34% 8.68% Net Imp. Area 13.36 20.75% 41.48% USED 45% Total Imp. Area 13.36 20.75% 41.48% FOR DESIGN Z:IShareMProjects12019119076 Carolyn Farm-Kahuna Group-Westley ChapelICALQ-&DSQMI..?RW2Q 49A.xls Sheet 1 of 1 Project: McCoy Farm DPR DESIGN, INC Prepared by: JMM DPR Job No.: 19076 RUN-OFF CURVE NUMBER Checked by: HN Location: Wesley Chapel, NC Date: 02-09-2022, Rev: 2022-08-05 Total Drain. Area (Ac.) 41.5 Percentage of Site Soil Type Soil Group Basin TbB2 B 56.8% BdB2 & BdC2 C 38.7% CmB D 4.5% 100.0 Hvdrolooic Soil Group Used r-ercenr or Drainage CN for Weighted CN for Weighted CN for Weighted CN Group Weighted Total Weighted Land Use No. Acres Area Group B CN Group C CN Group D CN X/X CN Weighted CN CN Wood (Fair Cond.) 8.5 20.5% 60 34.1 73 28.3 79 3.6 0 0.0 65.9 13.5 Open Space (Fair Cond.) 31.2 75.2% 61 34.6 74 28.6 80 3.6 0 0.0 66.9 50.3 BUA (Buildings, Roads...) 1.8 4.2% 98 55.7 98 37.9 98 4.4 98 0.0 98.0 4.2 100% Used 67.5 On -Site Proposed Development Total Drain. Area (Ac.) 41.5 Percentage of Site Soil Tvpe Soil Group Basin TbB2 B 56.8% BdB2 & BdC2 C 38.7% CmB D 4.5% 100.0 67.9 Hvdrolooic Soil Group Used Percent of Drainage CN for Weighted CN for Weighted CN for Weighted CN Group Weighted Total Weighted Land Use No. Acres Area Group B CN Group C CN Group D CN X/X CN Weighted CN CN Wood (Fair Cond.) 0.0 0.0% 60 34.1 73 28.3 79 3.6 0 0.0 65.9 0.0 Open Space (Fair Cond.) 27.0 55.1 % 61 34.6 74 28.6 80 3.6 0 0.0 66.9 36.9 BUA (Buildings, Roads...) 14.5 45.0% 98 55.7 98 37.9 98 4.4 98 0.0 98.0 44.1 Total 41.5 100 Composite Curve Number (CN): 81 81.0 C:IDPR Dropboxl ProyectsWctive12019119076 Carolyn Farm-Kahuna Group-Westley ChapellCALCSISC1V1119076-CN.x1s Sheet: 1 of 1 ,s a a r ) q ) ) ,:a a o ODDga _a _a oorta _a oDgt7a _a oocva ,sa a r ) , � £ : 2 ) �§ , �M 7 U)CL • Oo Ln \ ) / / .. .. ! �� � • � \ � . � ) \ $ _ E � � \e k � ) \00 §# k / \ @ ) Ln 0 �k ) �� \ 2 { Q� _ §/ ) �; _ _) )� ) z Q z ,:a a ODDga _a _a OaLtla _a oDgt7a _a oocva 0 Z /W V W J CL Q O O � 7 U O O U O O O) E C U O m Q m N U (u C E C U) E m w 2i y O O O (6 m CL O C = A E y > O O a) C > Q O a) _0 -O U) 6 > Q m U m m m 0 ) m EN O C m N y U a) N E o) p) E a) U C C N 6 m y E (6 7 Q N N y a) 0 m W E= U Wi O O O N a) i U) y-IOU a) O N N a) I O a) C O Q 'U O U O n� ate) (UN (n O .� m E E N 6 U) w O -E N NN C O E — N O_ Y E O lO a) a) O m U) cr U U) m >O U) -0 O O y a) N U) -0 N Z ON 'O U Q m C d a)-, (U a) y 7 m Q U O '.. a) O N a) U W (p m O N o L � N (6 N O O U O N C N m Z C a) m p a N i U O U O O- O O E C O a) a) N .� C U 3 N (n Q �• m u) O a) L 70 Z- a) m O O C Q US U m N a) U 7 au)) U O N �_p w '6 V O CO� N m o m m E y >N O O N E a) N N 2f O O 3 J> m (n (O!) Q C Q C (6 N Utl) i U) -O O C N O Z E Q U O� a3 O O a) m N a) O) 0 O '-' >+ L N N jp O) N -O N 0 m� E O _O T 7 C (A Q a) U) a) (6 (6 7 ,U) C N o U) (60 O 'O O Q -00 0 >' 3 U) U) ".' C O (6 U .0 Q (6 C 0 s C (n E E - _ O C E m a p D O a) N O 7 y O O Q 7 O_ O N O N 0 O t -O 0 (U) N O a) i U U U) U C > Q a) 7> (n a) m O E N y 0 O) O .Q O C m m a) a) o p a) p CL o U m 0 y �_ y — 0 7 — O O N °' N m a) E m 55 FL E U� U p 2 Q o Q m L H o U U U— ou .9 U) m y as °- O � a N O N r m o m a cz y w `o m d U U o Z u) O m � v Q R R C a 0 7 0 0 LL }{ OL R 4 R5 R F m o a o O w y OC 0) `o y a o a w H a. o a 0 0 0 c Q v rn Q m o Z rn Q 16 co co Q v) .j 0 0 a y m � 0 0 0 o a. o 0 a m m U U o z 0) Q a m m S IL IL El El 13 13 y N V N w O O N N N N O O 00 m d a) U m Z Hydrologic Soil Group —Union County, North Carolina 2022-08-02_19076 SCM DA SHAPEFILE Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BdB2 Badin channery silty C 11.8 37.8% clay loam, 2 to 8 percent slopes, moderately eroded BdC2 Badin channery silty C 0.3 0.9% clay loam, 8 to 15 percent slopes, moderately eroded CmB Cid channery silt loam, 1 D 1.4 4.5% to 5 percent slopes TbB2 Tarrus gravelly silty clay B 17.8 56.8% loam, 2 to 8 percent slopes, moderately eroded Totals for Area of Interest 31.3 100.0% USDA Natural Resources Web Soil Survey 8/02/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Union County, North Carolina 2022-08-02_19076 SCM DA SHAPEFILE Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 8/02/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 NOTE: THIS REPORT WAS SHORTED FOR INSERTION INTO THE CALCULATION BINDER. REFER TO THE UPLOADED PDF //AAL FOR FULL REPORT. SUMMIT ENGINEERING. LABORATORY. TESTING January 31, 2020 Mr. Steven Whitworth Kahuna Group 311 Unionville Indian Trail Rd W Indian Trail, North Carolina 28079 Email: swhitworth ckkahuna-group.com Subject: Estimated Seasonal High -Water Table (ESHWT) Determinations Carolyn Farm Site — Additional Borings Wesley Chapel and Potter Road Wesley Chapel, North Carolina SUMMIT Project No. 3802.02 Dear Mr. Whitworth: SUMMIT Engineering, Laboratory and Testing, P. C. (SUMMIT) is pleased to submit this letter summarizing our observations of the soil test borings as related to Estimated Seasonal High -Water Table Elevation (ESHWT) determinations. This report contains a brief description of the project information provided to us, general site and subsurface conditions revealed during this study. PURPOSE OF STUDY The primary purpose of this study was to obtain information regarding the subsurface conditions near the proposed detention ponds, assess the engineering characteristics of the subsurface materials, and determination of the estimated seasonal high-water table mark (if evident). This report contains the following items: ENGINEERING • LABORATORY • TESTING 3575 Centre Circle Drive I Fort Mill, South Carolina 29715 1 (704) 504 - 1717 1 (704) 504 - 1125 (Fax) WWW. SU M M 1T-COM PAN I ES. COM Summary of ESHWT Determination Carolyn Farm Site — Additional Borings SUMMIT Project No. 3802.02 January 31, 2020 The following table summarizes the results of the boring and our observations. Summary Table of the Boring Results and Our Observations GW Depth Boring GW Depth After PWR Test Depth ESHWT ATD 24 Hours Depth Location (Feet)' Depth (Feet) ' (Feet) (Feet) (Feet)' BMP-1 11.2 7 NE 10 10 BMP-2 14.3 5 NE 0.8 6 1 Depths from existing ground surface. NE — Not Encountered in Boring. FOR SCM 2: 615.00(-)T= 608.00. FOR SCM 1A & 1B: 594.00 (-) 5' = 589.00. The analyses and recommendations submitted in this report were based, in part, on data obtained from this study. If the above -described project conditions are incorrect or changed after the issuing of this report, or subsurface conditions encountered during construction are different from those reported, SUMMIT should be notified and these recommendations should be re-evaluated based on the changed conditions to make appropriate revisions. We have prepared this report according to generally accepted geotechnical engineering practices. No warranty, express or implied, is made as to the professional advice included in this report. 5 Summary of ESHWT Determination SUMMIT Project No. 3802.02 Carolyn Farm Site — Additional Borings January 31, 2020 CLOSING SUMMIT appreciates the opportunity to provide our professional services for you on this project. If you have any questions concerning the information in this proposal or if we may be of further service, please contact us at 704.504.1717. Sincerely, SUMMIT ,,��111►Illlrll r" •.SUMMIT Engineering,i TLaboratory esti g C. ern: �,J•��//lllllllll►��, Kerry C. Cooper, P.E. Geotechnical Department Manager LIST OF APPENDICES 1 Figure No. 1 —Site Location Map Figure No. 2 — Boring Location Plan 2 Boring Logs 3 Photographic Log CARO 10 9' SEAL Y843 5 � - `,r,�•�!ekY ►G0` Ricky O. Coker, P.E. Senior Project Manager 1 rrrertane lnvestment Services , fIZIZ k a C ercGker 4, ZV t• R Elatos Park I d Wesley Chapel TP Wesley Chapel Elementary School Carolyn Farm Site Figure 1 Wesley Chapel and Potter Road Site Location Map Wesley Chapel, North Carolina SUMMIT 3575 Centre Circle SUMMIT Project No.: 3802.02 Fort Mill, South Carolina 29715 SCALE: NTS J (903) 504-1717 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodeskg Civil 3DO by Autodesk, Inc. v2022 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 61.4444 12.3000 0.8784 -------- 2 78.4691 13.2000 0.8899 -------- 3 0.0000 0.0000 0.0000 -------- 5 78.5032 13.0000 0.8418 -------- 10 77.8312 12.7000 0.8107 -------- 25 66.8612 11.2000 0.7456 -------- 50 59.9370 10.2000 0.6997 -------- 100 54.4447 9.3000 0.6593 -------- File name: Union County -Wesley Chapel.IDF Intensity = B / (Tc + D)^E Monday, 06 / 26 / 2023 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.02 4.02 3.36 2.90 2.56 2.29 2.08 1.90 1.75 1.63 1.52 1.43 2 5.93 4.78 4.02 3.48 3.07 2.75 2.49 2.28 2.11 1.96 1.83 1.72 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.89 5.61 4.75 4.14 3.67 3.31 3.02 2.78 2.57 2.40 2.25 2.12 10 7.58 6.19 5.27 4.61 4.10 3.71 3.39 3.13 2.91 2.72 2.55 2.41 25 8.38 6.86 5.86 5.14 4.60 4.18 3.84 3.55 3.32 3.11 2.94 2.78 50 8.93 7.32 6.27 5.52 4.96 4.52 4.16 3.87 3.62 3.41 3.22 3.06 100 9.43 7.73 6.64 5.87 5.29 4.84 4.47 4.17 3.91 3.69 3.50 3.33 Tc = time in minutes. Values may exceed 60. Active\2019\19076 Carolyn Farm-Kahuna Group-Westley Chapel\CALCS\BMP\19076 NOAA data for Precipitation.pcp Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.95 3.56 0.00 4.48 5.20 6.21 7.02 7.87 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 Project: McCoy Farm DPR DESIGN Computed by: JMM Job #: 19076 NOAA DATA - IN/HR Checked by:HN Location: Wesley Chapel, NC Date: 06-25-2022 NOAA DATA: C�? "'rf, f�F r x � o 4 � :1 } a O 2km 1mi PF tabular car Wesley Chapel Location information: Name: Matthews, North Carolina, USA* Latitude: 35-0118' Longitude:-80.6728' Elevation: 616.04 tt t" x Source: ESRI Maps ** Source: USGS POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WITH 90% CONFIDENCE INTERVALS AND SUPPLEMENTARY IN FORMAT ON NOAAAtlas 14, Volume 2, Version 3 PDS-basad precipitation frequency estimates with 90% confidence interva recurrence irderval 1 2 5 10 25 50 100 5 min 5.03 5.94 6.39 7.58 8.39 8.94 9.44 r (4.6,3-5.461 (5.46-6.47) (6-32-7-50) (6.9&8.24) (7.66-9.14) (8-12-9.68) (3.53-16.2) L 10-min (3: 0-4.36) (4.37 5.17) (5.07 6-01 ) (5.56-6 59) (S 06824) (6-467.71) (6. 8-3.12) [ 15 min 3.35 3.98 4.65 5.12 5.64 6.00 6.32 (3.08-3.64) (3.66-4.34) (4-27-5.07) (4.69-5.56) (5-15-6-12) (5-46-6.51) (5.72 6.85) 30-min 2.29 2.75 3.31 3.71 4.18 4.52 4.84 (2.11-2.49) (2.53-2.99) (3-04-3.60) (3.464.03) (3-82-4.53) (4.11-4.90) (4.38-5.24) fi0-min 1.43 1.72 2.12 2A1 2.78 3.06 3.33 (1.32-1.55j (1.59-1.8Sj (1-95-2-31) (2.21-2.62) (2-54-3.02) (2-70-3.32) (3.01-3.61) 2-h r 0.326 1.00 1.24 1 A2 1.66 1.84 2.02 r (0.35$-4.904) (0.915-1.49) (1-13-1.36) (1.36 1.55) {1-50-1.81) (1-66-2.00) (1.81-2.20) L 3-h r 0.595 0.706 0.981 1.02 1.20 1.34 1.49 (0-535-0.643) (0.646-0.776) (0.804-0-967) (0.925-1-11) ('i-09-1-31) (1-21-1.47) (1.33-1.62) 6 hr 0.352 0.425 0.530 0.613 0.726 0.316 0.908 r (0-323-0.387) (0.389-0.466) (0.485-0.532) (4.560-0.671) (0.658-4.792) (0-735-4.359) (0.813-0.959) L 12-hr 0.207 0.250 0.313 0.364 0.435 0.492 0.551 f0.190-0.227) (0.729-6.275) (0.287-0-344) (0.332-0.399) (0.394-4.474) (0-442-0.536) (0.490-6.599) 24 hr (0A14-0 133) (0. i37 6 61j (0.132-0202) (0.244-0235) (0.237-0284) (0-269-0317) (0.299-0. 56) [ Project: McCoy Farm DPR DESIGN Computed by: JMM Job #: 19076 NOAA DATA - PRECIPITATION Checked by:HN Location: Wesley Chapel, NC Date: 06-25-2022 NOAA DATA: � C� 4rfif' R 7 LYE {I: 2krr. 1mi A y 6 q. `Q�'µd Isa Wesley Chapel ��'} 6)aIIcI. Name: Mafthews North Carolina. IJ5Ax Latitude: 35. 0118' Longitude:-60.6728- Elevation: 616.04 ft - ' Source: ESRi Maps "Source: USGS POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WITH 99'_ CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION 140AAAtlas 14, Volume 2, Version 3 PF graphical Supplementary information PDS-based precipitation frequency estimates with 90% confidence intervi Average reaRrence lnienrai {years} 140 ? 2 5 76 25 50 5 min 0.419 4 49a 0.574 0.fi32 0.699 0.745 0.787 (0_386-0.455) (4.455-9.539) (0.527-6.1625) (0.594k.887) {4.638-0_758} {0_s7T-0.8i}7} {4.7i7-0.S62} (E 7fl ran 0.669 0,79t U.92U 1.07 1.17 1.19 t.25 (0-617-0.=) (4.728-4-862) (0.84,5-1-04) (U.92J-7.76} (7-02-1-21j {i-0&1.29] {7.73 7.35) El 7 rrtin 0.337 4.995 1:76 fi.28 t.d7 7.50 fi.58 {0-771-0.949} El 3amin 7.75 f.37 1.65 1.85 2.09 2.26 2.42 (1.Oir1.25} (7.26-7.50} {i-52-1-80} (1.7ik-2.4k} (7-91-2-27} {2-OCr2.43} (2.79-2.62) &U-min 1,�3 3.72 2.12 2.41 2.78 3.46 3.33 (1.32-7.55} (7.59-1.SS} {1-95-2-31} (2.24-2.fi2) (2-54 3-02) {2-7$ 3.32j (3.41-3.61} E 2-hr 1.&3 2.00 2.48 2.&E 3.32 3_fi7 4.03 (1.52-1.87} (7.83-2.19} {2.27-2.71} (2.59-3.71j (3.01-3.fi1) {3.32A6} (3.82-4.393 I F3-hr 1.7fi 2.fi2 2.fi5 3.D5 3.fi0 4.44 A.47 (1.fi7-1.93} (7.84-2.33} {2.42-2.9?} {2.753.34} (3.26-3.94) I 6-hr 2.91 2.5d 3.18 3.67 4.35 4.89 5.dd (1.932.32} (233-2.79) {2.91-3.48} {3.35-d.42} (3.9d_74} {d.41f-5.32) (4.87-5.92) I 12-hr 2.-0$ 3.01 3.77 4.39 5.24 5.92 6.63 (2.29-2.73} (2.76-3.31} {3-46-4-14j {#.04 4.84} {4.7#-5-72j {5.32-6.43} (5.91-7.22) El 2Zr 2.95 3.56 4.4$ 5.24 6.2'1 7.02 7.RJ (2.73 3.24} (3.30-3.56} (4.13-4.85) {4.86_5.fi4} (5.70-6-73j {6.43-7.61) (T.1 53) i 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk@ Civil 3D& 2019 by Autodesk, Inc. v202O CD CD CD CD SCS SCS SCS SCS I = 2 2 W > LU LU W LU W W coco co ,^^ co co I co LU LU co co O O � N U co co U co co rn � o 2 0 W I— 2 O w O � N U Leaend Hyd. Origin Description 1 SCS Runoff PRE - SCM 1 2 SCS Runoff PRE - SCM 2 5 SCS Runoff POST - SCM 1 7 SCS Runoff POST - SCM 2 9 Reservoir ROUTED-SCM 1 10 Reservoir ROUTED-SCM 2 Project: 19076 Hydrograph for BMP 1 and 2.gpw 03/27/2024 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 13.43 23.29 0.000 ------- 54.82 76.85 95.47 115.59 PRE - POND 1 2 SCS Runoff ------ 2.810 4.927 0.000 ------- 11.76 16.50 20.53 24.89 PRE - SCM 2 4 SCS Runoff ------ 0.000 0.000 3.467 ------- 0.000 0.000 0.000 0.000 POST -VOID 5 SCS Runoff ------ 55.99 76.70 0.000 ------- 136.39 174.00 204.29 236.09 POST - SCM 1 6 SCS Runoff ------ 16.00 21.91 0.000 ------- 38.97 49.71 58.37 67.45 POST - SCM 1 B VOID 7 SCS Runoff ------ 13.62 18.66 0.000 ------- 33.18 42.32 49.69 57.43 POST - SCM 2 9 Reservoir 5 1.336 4.776 0.000 ------- 34.37 60.56 76.11 82.90 ROUTED-SCM 1 10 Reservoir 7 0.225 0.531 0.000 ------- 7.174 15.76 26.17 37.44 ROUTED-BMP 2 Proj. file: 19076 Hydrographs.gpw Wednesday, 04 / 3 / 2024 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 13.43 2 726 51,618 ------ ------ ------ PRE - POND 1 2 SCS Runoff 2.810 2 730 13,066 ------ ------ ------ PRE - SCM 2 4 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ POST -VOID 5 SCS Runoff 55.99 2 718 112,395 ------ ------ ------ POST - SCM 1 6 SCS Runoff 16.00 2 718 32,113 ------ ------ ------ POST - SCM 1 B VOID 7 SCS Runoff 13.62 2 718 27,339 ------ ------ ------ POST - SCM 2 9 Reservoir 1.336 2 942 112,359 5 597.34 71,839 ROUTED-SCM 1 10 Reservoir 0.225 2 1102 27,313 7 613.21 19,024 ROUTED-BMP 2 19076 Hydrographs.gpw Return Period: 1 Year Wednesday, 04 / 3 / 2024 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 23.29 2 726 80,928 ------ ------ ------ PRE - POND 1 2 SCS Runoff 4.927 2 730 20,485 ------ ------ ------ PRE - SCM 2 4 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ POST -VOID 5 SCS Runoff 76.70 2 716 154,887 ------ ------ ------ POST - SCM 1 6 SCS Runoff 21.91 2 716 44,253 ------ ------ ------ POST - SCM 1 B VOID 7 SCS Runoff 18.66 2 716 37,675 ------ ------ ------ POST - SCM 2 9 Reservoir 4.776 2 768 154,846 5 597.61 83,057 ROUTED-SCM 1 10 Reservoir 0.531 2 882 37,649 7 613.55 24,284 ROUTED-BMP 2 19076 Hydrographs.gpw Return Period: 2 Year Wednesday, 04 / 3 / 2024 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 54.82 2 726 176,384 ------ ------ ------ PRE - POND 1 2 SCS Runoff 11.76 2 730 44,647 ------ ------ ------ PRE - SCM 2 4 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ POST -VOID 5 SCS Runoff 136.39 2 716 278,765 ------ ------ ------ POST - SCM 1 6 SCS Runoff 38.97 2 716 79,647 ------ ------ ------ POST - SCM 1 B VOID 7 SCS Runoff 33.18 2 716 67,808 ------ ------ ------ POST - SCM 2 9 Reservoir 34.37 2 724 278,718 5 598.68 128,919 ROUTED-SCM 1 10 Reservoir 7.174 2 726 67,782 7 614.07 32,557 ROUTED-BMP 2 19076 Hydrographs.gpw Return Period: 10 Year Wednesday, 04 / 3 / 2024 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 76.85 2 724 243,345 ------ ------ ------ PRE - POND 1 2 SCS Runoff 16.50 2 728 61,597 ------ ------ ------ PRE - SCM 2 4 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ POST -VOID 5 SCS Runoff 174.00 2 716 359,227 ------ ------ ------ POST - SCM 1 6 SCS Runoff 49.71 2 716 102,636 ------ ------ ------ POST - SCM 1 B VOID 7 SCS Runoff 42.32 2 716 87,380 ------ ------ ------ POST - SCM 2 9 Reservoir 60.56 2 724 359,179 5 599.33 159,065 ROUTED-SCM 1 10 Reservoir 15.76 2 724 87,353 7 614.48 39,435 ROUTED-BMP 2 19076 Hydrographs.gpw Return Period: 25 Year Wednesday, 04 / 3 / 2024 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 95.47 2 724 300,117 ------ ------ ------ PRE - POND 1 2 SCS Runoff 20.53 2 728 75,967 ------ ------ ------ PRE - SCM 2 4 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ POST -VOID 5 SCS Runoff 204.29 2 716 425,161 ------ ------ ------ POST - SCM 1 6 SCS Runoff 58.37 2 716 121,475 ------ ------ ------ POST - SCM 1 B VOID 7 SCS Runoff 49.69 2 716 103,418 ------ ------ ------ POST - SCM 2 9 Reservoir 76.11 2 724 425,112 5 599.83 182,598 ROUTED-SCM 1 10 Reservoir 26.17 2 722 103,392 7 614.74 44,089 ROUTED-BMP 2 19076 Hydrographs.gpw Return Period: 50 Year Wednesday, 04 / 3 / 2024 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 115.59 2 724 361,960 ------ ------ ------ PRE - POND 1 2 SCS Runoff 24.89 2 728 91,621 ------ ------ ------ PRE - SCM 2 4 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ POST -VOID 5 SCS Runoff 236.09 2 716 495,327 ------ ------ ------ POST - SCM 1 6 SCS Runoff 67.45 2 716 141,522 ------ ------ ------ POST - SCM 1 B VOID 7 SCS Runoff 57.43 2 716 120,485 ------ ------ ------ POST - SCM 2 9 Reservoir 82.90 2 724 495,276 5 600.39 210,282 ROUTED-SCM 1 10 Reservoir 37.44 2 720 120,459 7 614.93 47,461 ROUTED-BMP 2 19076 Hydrographs.gpw Return Period: 100 Year Wednesday, 04 / 3 / 2024 Project: McCoy Farm DPR DESIGN, INC Prepared By: JMM Job No.: 19076 Checked By: HN Location: Wesley Chapel, NC Date: 02-09-2022 Rev:07-05-2023 DESIGN CRITERIA PER NCDENR BMP ORDINANCE * SCM - SAND FILTER - WATER QUALITY CONTROL ONLY 1 • Total Drainage Area (A): 25.90 ac • Total Impervious Area "I" USED = 45.0% (for Design) 11.66 ac (See attached Impervious Ca/cs) * Total Water Quality Volume To Treat (First 1" of Rainfall) at 75%: WQv = (P/12) (A) (Rv) (43560) = 32,083 cf (Simple Method, Schueler) P. Water Quality Design Storm, 1st Inch of Rainfall 1 inch A: Drainage Area (Impervious Area Only) 25.90 ac. Rv. 0. 05 + 0.009 (1) = 0.455 1: % of Impervious Area 45.0 * Total Storm Water Volume Control 1-vr. 24-hr Post-Dev: Qv = (P-0.2S)12/ (P+0.8S) ' A ' (43560/12) = 119,888 cf (SCS Method) P. Design Storm, 1-yr 24-hr Storm Rainfall depth 2.95 inch A: Drainage Area 25.90 ac. S = 1, 000/CN-10 = 2.35 inch CN: Curve Number 81 * Estimated Storm Water Volume 10-vr, 24-hr Post-Dev: Qv = (P-0.2S)12/ (P+0.8S) ' A ' (43560/12) = 297,349 cf (SCS Method) P. Design Storm, 10-yr 24-hr Storm Rainfall depth 5.2 inch A: Drainage Area 25.90 ac. S = 1000/CN-10 = 2.35 inch CN: Curve Number 81 * Sedimentation Chamber Volume Min. Required: Vol -Pre = (0.2)(WQv) = 6,417 cf * Filtration Media Surface Area Required: Af=((WQv) (Df)]/((k) (Hf + Do (Tf)] = 1,833 sf (From Mecklenburg BMP Manual, Based on Darcy's Law) WQv: Waterquality volume 32,083 cf Df.- Filter bed depth (1.5' Minimum) 1.0 It k: Permeability coefficient of filter media 3.50 ft/day (1.75" per hour, or 3.5' per day) Hf.- Average height of water above filter bed, (half of pond depth, 1' max) 1.00 It Tf = Design filter bed drain time in days, (2 days beyond center 24-hr storm) 2.500 days Depth of Pond Water (24" Max.)= 24 inch printed 3/272024 Z: ISharedlProjects12019119076 Carolyn Farm-Kahuna Group-Westley ChapellCALCSISCM119076-SCM PONDS and Sand Filter Insert Table.xls page 1 of 3 Project: McCoy Farm DPR DESIGN, INC Prepared By: JMM Job No.: 19076 Checked By: HN Location: Wesley Chapel, NC Date: 02-09-2022 Rev:07-05-2023 * Sand Chamber: Volume of Sand Chamber required (WO Volume x 50%), NCDEQ MDC 3 (4): 16,042 cf Volume of the Sand Chamber provided: 21,025 cf * Filtration Media Surface Area Provided: 8,--- sf Area of Sand Filter required (50•1 WO Volume / WO Ponding design depth), NCDEQ MDC 3 (3): 8,021 sf 8,050 Area of sand Filter provided: sf SCM 1 -Storage Volume Provided: WO Sand WO Sand WO Chamber Total Sediment Overall Incremental Overall Chamber Area Chamber Storage Storage Chamber Surface Storage Total Notes Elevation Area Area Storage (ft) A A (cf) (so (so (cf) (cf) 592.5 Bottom of Stone - Provide liner per geo recommendation 594.0 Top of StoneBottom of Sand 595.0 Top of Sand Filter/ Bottom of Extended Dry Detention Pond 595.0 8,050 0 0 --- 8,050 0 0 Pond Bot 596.0 11,000 9,525 9,525 20,500 34,500 21,275 21,275 597.0 12,000 11,500 21,025 25,000 39,000 36,750 58,025 598.0 28,600 42,600 40,800 98,825 599.0 46,100 44,350 143,175 600.0 49,100 47,600 190,775 601.0 52,200 50,650 241,425 601.5 53,800 26,500 267,925 Pond Top Static Water Quality Elevation @ 596.29 ft Design Static Water Quality Elevation @ 597.00 ft Static 1YR-24 Channel Protection Elevation @ 598.47 ft ESHTW = 589.00 (594.00 - 5) IN THE SUMMIT GEO TECH REPORT DATED 2020-01-312. ng printed 3/272024 Z: IShared1Pmyacts12019119076 Carolyn Farm-Kahuna Group-Westley ChapellCALCSISCM119076-SCM PONDS and Sand Filter Insert Table.xls page 2 of 3 Project: McCoy Farm DPR DESIGN, INC Prepared By: JMM Job No.: 19076 Checked By: HN Location: Wesley Chapel, NC Date: 02-09-2022 Rev:07-05-2023 * SCM - SAND FILTER * Water Draw Down Flow Rate Thru Sand Filter Media Qo = WQv/Tf = (Af)(k)(Hf+Df)/Df = (Darcy's Law) k: Permeability coefficient of filter media Af.- Surface area, sf Hf.- Average height of water above filter bed Df.- Depth of soil filter bed Q o @ Top of Media Q o @ Median of WQv storage Q o @ Top of WQv storage 0.6522 cfs 3.50 fVday 8,050 sf 1.00 ft 1.0 ft 595.0 = 0.0000 cfs 596.0 = 0.6522 cfs 597.0 = 0.9783 cfs * Time Drawdown from Inundation to Saturation surface Tf= WQv/Qo 13.66 hrs (Sized for the Volume of 1-yr Storm with 50% remained at 36th Hour, 5% remained at 60th Hour, and drained completely at 120th Hour). 1-yr Storm Volume, Less 50% Remain Beyond 36th Hour 16,042 cf Average Surface Area 4,616 sf Area of Outlet Orifice (so, a = 2 A h^ 1/2 / c t)(2g)^(1/2)) a = 10.028 Orifice A= ResevoirArea, sf 4,616 Calc. Approx. Orifice Diameter (inch), d = 2.26 h= Falling Head, ft 3.47 c= Discharge Coefficient 0.6 Orifice Diameter (inch) Used, d = 0.0 t= Time ( 36 hrs), sec. 129,600 Drainage through Sand Media only. g= Accelleration, ft/sq.sec 32.2 a= Orifice Area (so d= Orifice Diameter (inch) Q: Draw down rate thru sand filter 0.6522 cfs Use 690 If of 6" Sch 40 PVC, Use 7 rows w/ 3/8" perforations spaced 6" on center, 4 rows w/90-deg aparl Totaling 690 LF. inch # of Perforation = (Total Linear feet of pipe)(# holes per foot)(4 rows of holes per pipe) = (690 /0(2 holes per foot)(4 rows of holes) 5520 holes Capacity of one hole (3/8") = CA(2gh)1(0.5) (orifice equation) 0.0078 cfs c= Discharge Coefficient 0.6 g=Accelleration, ft/sq.sec 32.2 a= Orifice Area (so of 3/8" hole 0.0008 h= head above perforation 4.5 Total Capacity = Capacity of 1 hole x # of holes 43.2224 cfs Total Capacity w/ 50% lost to clogging 21.6112 cfs Underdrain Pipe Capacity-- 1.49/n(A)(A/P)1(2/3) (S)10.5 (Manning Eq) 2.175 cfs n= pipe coefficient 0.013 A= Area (so of 10" dia pipe 0.5451 P= Pipe Perimeter, ft 1.57 s= slope, 0.5% 0.005 Underdrain Pipe Capacity w/ 50% lost to clogging 1.0875 cfs Both Flow Rates thru Perforation and Pipe are greater than that of Flow rate of Sand Filter. * SCM - ANTI -SEEP COLLAR SIZING Outlet Pipe Size (I.D.) = 36 in Outlet Pipe Size (O.D.) = 3.67 ft L, Length of Outlet Pipe = 48 If Min. Flow Length = 55.2 ft Min. Flow Length: Total Lengh of Collar offset = 7.2 ft 115 % of outlet pipe Number of anti -seep collars 2 Offset per collar 3.6 ft Min. Outside dimension of each collar 7.27 ft Designed collars 2 at 7.5' x 7.5' 1!0 printed 3/272024 Z: IShared1Pro/ects12019119076 Carolyn Farm-Kahuna Group-Westley ChapellCALCSISCM119076-SCM PONDS and Sand Filter Insert Table.xls page 3 of 3 Project: McCoy Farm DPR DESIGN, INC Prepared By: JMM Job No.: 19076 Checked By: HN Location: Wesley Chapel, NC Date: 02-09-2022 Rev: 03-27-2024 Charbtto-Meckle bu STORM WATER Services SCM Inset Table Sand Filter - SCM #1 Project Name: McCoy Farm Se uencelD: 1 Drainage Area (acres): 25.9 Land Use/Development Type: > 2 acres - Residential Open Space Vegetation Type: Grassed Percent Built -Upon Area: 45% Sediment Chamber Length (ft.): 250 Sediment Chamber Width ft.: 50 Sediment Chamber Height ft.: 1 Sand Filter Type. Surface Media Depth ft.: 1 Media Surface Area ft2 : 8,050 Flow Diverter Present Y/N : N Regulated By: Watershed Overlay Treatment Effectiveness: Optimal NC State Plane X eastin : 1497340 NC State Plane Y (northing): 464902 printed 3/25/2024 Z: IShareMProjects12019119076 Carolyn Farm-Kahuna Group-Westley ChapellCALCSISCM119076-SCM PONDS and Sand Filter Insert TableAs page 1 of 1 Pond Report 2 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Wednesday, 04 / 3 / 2024 Pond No. 1 - SCM 1 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 595.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 595.00 8,050 0 0 1.00 596.00 34,500 21,275 21,275 2.00 597.00 39,000 36,750 58,025 3.00 598.00 42,600 40,800 98,825 4.00 599.00 46,100 44,350 143,175 5.00 600.00 49,100 47,600 190,775 6.00 601.00 52,200 50,650 241,425 6.50 601.50 53,800 26,500 267,925 Culvert / Orifice Structures Weir Structures 2024-03-27 [A] [Bl [C] [PrFRSr] [A] [Bl [C] [D] Rise (in) = 36.00 27.60 6.00 0.00 Crest Len (ft) = 14.00 10.00 0.00 0.00 Span (in) = 36.00 18.00 168.00 0.00 Crest El. (ft) = 601.10 600.50 0.00 0.00 No. Barrels = 1 4 1 0 WeirCoeff. = 3.33 2.60 2.60 3.33 Invert El. (ft) = 592.40 597.30 599.60 0.00 Weir Type = 1 Broad Broad --- Length (ft) = 60.00 0.50 0.50 0.00 Multi -Stage = Yes No No No Slope (%) = 0.67 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD ExfiI User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 595.00 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 0.10 2,128 595.10 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.065 0.065 0.20 4,255 595.20 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.130 0.130 0.30 6,383 595.30 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.196 0.196 0.40 8,510 595.40 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.261 0.261 0.50 10,638 595.50 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.326 0.326 0.60 12,765 595.60 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.391 0.391 0.70 14,893 595.70 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.457 0.457 0.80 17,020 595.80 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.522 0.522 0.90 19,148 595.90 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.587 0.587 1.00 21,275 596.00 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.652 0.652 1.10 24,950 596.10 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.685 0.685 1.20 28,625 596.20 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.717 0.717 1.30 32,300 596.30 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.750 0.750 1.40 35,975 596.40 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.783 0.783 1.50 39,650 596.50 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.815 0.815 1.60 43,325 596.60 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.848 0.848 1.70 47,000 596.70 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.880 0.880 1.80 50,675 596.80 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.913 0.913 1.90 54,350 596.90 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.946 0.946 2.00 58,025 597.00 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 0.978 0.978 2.10 62,105 597.10 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 1.010 1.010 2.20 66,185 597.20 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 1.043 1.043 2.30 70,265 597.30 24.51 oc 0.00 0.00 --- 0.00 0.00 --- --- --- 1.075 1.075 2.40 74,345 597.40 24.51 oc 0.65 is 0.00 --- 0.00 0.00 --- --- --- 1.107 1.752 2.50 78,425 597.50 24.51 oc 1.83 is 0.00 --- 0.00 0.00 --- --- --- 1.139 2.965 2.60 82,505 597.60 24.51 oc 3.36 is 0.00 --- 0.00 0.00 --- --- --- 1.171 4.527 2.70 86,585 597.70 24.51 oc 5.16 is 0.00 --- 0.00 0.00 --- --- --- 1.203 6.368 2.80 90,665 597.80 24.51 oc 7.22 is 0.00 --- 0.00 0.00 --- --- --- 1.236 8.454 2.90 94,745 597.90 24.51 oc 9.49 is 0.00 --- 0.00 0.00 --- --- --- 1.268 10.76 3.00 98,825 598.00 24.51 oc 11.96 is 0.00 --- 0.00 0.00 --- --- --- 1.300 13.26 3.10 103,260 598.10 24.51 oc 14.62 is 0.00 --- 0.00 0.00 --- --- --- 1.300 15.92 3.20 107,695 598.20 24.51 oc 17.44 is 0.00 --- 0.00 0.00 --- --- --- 1.300 18.74 3.30 112,130 598.30 24.51 oc 20.43 is 0.00 --- 0.00 0.00 --- --- --- 1.300 21.73 3.40 116,565 598.40 24.51 oc 23.57 is 0.00 --- 0.00 0.00 --- --- --- 1.300 24.87 Continues on next page... K SCM 1 Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC Wrl) ExfiI User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.50 121,000 598.50 26.85 oc 26.85 is 0.00 --- 0.00 0.00 --- --- --- 1.300 28.15 3.60 125,435 598.60 30.28 oc 30.28 is 0.00 --- 0.00 0.00 --- --- --- 1.300 31.58 3.70 129,870 598.70 33.84 oc 33.83 is 0.00 --- 0.00 0.00 --- --- --- 1.300 35.13 3.80 134,305 598.80 37.52 oc 37.52 is 0.00 --- 0.00 0.00 --- --- --- 1.300 38.82 3.90 138,740 598.90 41.34 oc 41.34 is 0.00 --- 0.00 0.00 --- --- --- 1.300 42.64 4.00 143,175 599.00 45.28 oc 45.28 is 0.00 --- 0.00 0.00 --- --- --- 1.300 46.58 4.10 147,935 599.10 49.33 oc 49.33 is 0.00 --- 0.00 0.00 --- --- --- 1.300 50.63 4.20 152,695 599.20 53.50 oc 53.50 is 0.00 --- 0.00 0.00 --- --- --- 1.300 54.80 4.30 157,455 599.30 57.78 oc 57.78 is 0.00 --- 0.00 0.00 --- --- --- 1.300 59.08 4.40 162,215 599.40 62.16 oc 62.16 is 0.00 --- 0.00 0.00 --- --- --- 1.300 63.46 4.50 166,975 599.50 66.66 is 66.65 is 0.00 --- 0.00 0.00 --- --- --- 1.300 67.95 4.60 171,735 599.60 71.25 is 71.25 is 0.00 --- 0.00 0.00 --- --- --- 1.300 72.55 4.70 176,495 599.70 73.26 is 71.75 is 1.50 is --- 0.00 0.00 --- --- --- 1.300 74.55 4.80 181,255 599.80 74.44 is 70.18 is 4.26 is --- 0.00 0.00 --- --- --- 1.300 75.74 4.90 186,015 599.90 75.75 is 67.92 is 7.82 is --- 0.00 0.00 --- --- --- 1.300 77.05 5.00 190,775 600.00 77.16 is 65.09 is 12.06 is --- 0.00 0.00 --- --- --- 1.300 78.45 5.10 195,840 600.10 78.61 is 61.76 is 16.85 is --- 0.00 0.00 --- --- --- 1.300 79.91 5.20 200,905 600.20 79.74 is 59.79 is 19.94 is --- 0.00 0.00 --- --- --- 1.300 81.03 5.30 205,970 600.30 80.77 is 58.16 is 22.61 is --- 0.00 0.00 --- --- --- 1.300 82.07 5.40 211,035 600.40 81.75 is 56.75 is 24.99 is --- 0.00 0.00 --- --- --- 1.300 83.04 5.50 216,100 600.50 82.68 is 55.50 is 27.17 is --- 0.00 0.00 --- --- --- 1.300 83.97 5.60 221,165 600.60 83.40 is 55.33 is 28.07 is --- 0.00 0.82 --- --- --- 1.300 85.52 5.70 226,230 600.70 84.02 is 55.75 is 28.28 is --- 0.00 2.32 --- --- --- 1.300 87.64 5.80 231,295 600.80 84.64 is 56.15 is 28.48 is --- 0.00 4.27 --- --- --- 1.300 90.21 5.90 236,360 600.90 85.25 is 56.56 is 28.69 is --- 0.00 6.57 --- --- --- 1.300 93.12 6.00 241,425 601.00 85.86 is 56.96 is 28.89 is --- 0.00 9.19 --- --- --- 1.300 96.34 6.05 244,075 601.05 86.16 is 57.16 is 28.99 is --- 0.00 10.60 --- --- --- 1.189 97.95 6.10 246,725 601.10 86.46 is 57.36 is 29.10 is --- 0.00 12.08 --- --- --- 1.077 99.62 6.15 249,375 601.15 86.81 is 57.25 is 29.04 is --- 0.52 13.63 --- --- --- 0.966 101.40 6.20 252,025 601.20 87.21 is 56.88 is 28.85 is --- 1.48 15.23 --- --- --- 0.855 103.29 6.25 254,675 601.25 87.63 is 56.34 is 28.58 is --- 2.71 16.88 --- --- --- 0.743 105.25 6.30 257,325 601.30 88.07 is 55.66 is 28.24 is --- 4.17 18.60 --- --- --- 0.632 107.30 6.35 259,975 601.35 88.53 is 54.87 is 27.83 is --- 5.83 20.37 --- --- --- 0.520 109.42 6.40 262,625 601.40 89.00 is 53.97 is 27.37 is --- 7.66 22.20 --- --- --- 0.409 111.60 6.45 265,275 601.45 89.49 is 52.96 is 26.87 is --- 9.65 24.07 --- --- --- 0.298 113.85 6.50 267,925 601.50 89.98 is 51.87 is 26.31 is --- 11.80 26.00 --- --- --- 0.186 116.16 ... End Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Monday, 03 / 25 / 2024 Hyd. No. 5 POST - SCM 1 Hydrograph type = SCS Runoff Peak discharge = 55.99 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 112,395 cuft Drainage area = 25.900 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 50.00 40.00 30.00 10.00 0.00 0 2 4 — Hyd No. 5 POST-SCM1 Hyd. No. 5 -- 1 Year 6 8 10 12 14 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 ' 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report 1 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 9 ROUTED-SCM 1 Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 5 - POST - SCM 1 Reservoir name = SCM 1 Storage Indication method used. Q (cfs) 60.00 50.00 40.00 30.00 10.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage ROUTED-SCM 1 Hyd. No. 9 -- 1 Year Wednesday, 03 / 27 / 2024 = 1.336 cfs = 15.70 hrs = 112,359 cuft = 597.34 ft = 71,839 cuft Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' jW ' ' 0.00 0 8 16 24 32 40 48 56 64 72 80 Time (hrs) — Hyd No. 9 — Hyd No. 5 ® Total storage used = 71,839 cult Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 03 / 27 / 2024 Hyd. No. 9 ROUTED-SCM 1 Hydrograph type = Reservoir Peak discharge = 1.336 cfs Storm frequency = 1 yrs Time to peak = 15.70 hrs Time interval = 2 min Hyd. volume = 112,359 cuft Inflow hyd. No. = 5 - POST - SCM 1 Max. Elevation = 597.34 ft Reservoir name = SCM 1 Max. Storage = 71,839 cuft Storage Indication method used. Elev (ft) 599.00 .- @� 1111 597.00 .- @� 1111 595.00 0 8 — 1. SCM 1 ROUTED-SCM 1 Hyd. No. 9 -- 1 Year 16 24 32 40 48 56 64 Elev (ft) 599.00 598.00 597.00 596.00 595.00 72 80 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Friday, 03 / 22 / 2024 Hyd. No. 1 PRE-POND1 Hydrograph type = SCS Runoff Peak discharge = 23.29 cfs Storm frequency = 2 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 80,928 cuft Drainage area = 24.500 ac Curve number = 67.5* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.04 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(33.600 x 68)] / 24.500 Q (cfs) 24.00 16.00 12.00 : M 4.00 0.00 1 0 2 4 — Hyd No. 1 PRE - POND 1 Hyd. No. 1 -- 2 Year 6 8 10 12 14 Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 ' 0.00 16 18 20 22 24 26 Time (hrs) 2 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Friday, 03 / 22 / 2024 Hyd. No. 1 PRE-POND1 Hydrograph type = SCS Runoff Peak discharge = 54.82 cfs Storm frequency = 10 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 176,384 cuft Drainage area = 24.500 ac Curve number = 67.5* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.04 min Total precip. = 5.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(33.600 x 68)] / 24.500 Q (cfs) 60.00 50.00 40.00 30.00 10.00 0.00 0 2 4 — Hyd No. 1 PRE - POND 1 Hyd. No. 1 -- 10 Year 6 8 10 12 14 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 r ' 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Friday, 03 / 22 / 2024 Hyd. No. 1 PRE-POND1 Hydrograph type = SCS Runoff Peak discharge = 76.85 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 243,345 cuft Drainage area = 24.500 ac Curve number = 67.5* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.04 min Total precip. = 6.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(33.600 x 68)] / 24.500 Q (cfs) 80.00 70.00 50.00 40.00 30.00 10.00 PRE - POND 1 Hyd. No. 1 -- 25 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' ' ' ' F ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 1 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Friday, 03 / 22 / 2024 Hyd. No. 1 PRE - POND 1 Hydrograph type = SCS Runoff Peak discharge = 95.47 cfs Storm frequency = 50 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 300,117 cuft Drainage area = 24.500 ac Curve number = 67.5* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.04 min Total precip. = 7.02 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(33.600 x 68)] / 24.500 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 PRE - POND 1 Hyd. No. 1 -- 50 Year 0 2 4 6 8 10 12 14 Hyd No. 1 Q (cfs) I- Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Friday, 03 / 22 / 2024 Hyd. No. 1 PRE-POND1 Hydrograph type = SCS Runoff Peak discharge = 115.59 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 361,960 cuft Drainage area = 24.500 ac Curve number = 67.5* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.04 min Total precip. = 7.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(33.600 x 68)] / 24.500 Q (cfs) 120.00 100.00 40.00 0.00 0 2 4 — Hyd No. 1 PRE - POND 1 Hyd. No. 1 -- 100 Year 6 8 10 12 14 Q (cfs) 120.00 100.00 40.00 20.00 ' ' ' 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Friday, 03 / 22 / 2024 Hyd. No. 5 POST - SCM 1 Hydrograph type = SCS Runoff Peak discharge = 76.70 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 154,887 cuft Drainage area = 25.900 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 80.00 70.00 50.00 40.00 30.00 10.00 POST-SCM1 Hyd. No. 5 -- 2 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 1 0�— ' ' 'A ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 5 Time (hrs) Hydrograph Report 2 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 5 POST - SCM 1 Hydrograph type = SCS Runoff Peak discharge = Storm frequency = 10 yrs Time to peak = Time interval = 2 min Hyd. volume = Drainage area = 25.900 ac Curve number = Basin Slope = 0.0 % Hydraulic length = Tc method = User Time of conc. (Tc) = Total precip. = 5.20 in Distribution = Storm duration = 24 hrs Shape factor = Friday, 03 / 22 / 2024 136.39 cfs 11.93 hrs 278,765 cuft 81 0 ft 5.00 min Type II 484 Q (cfs) POST-SCM1 Hyd. No. 5 -- 10 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0.0 2.0 - Hyd No. 4.0 6.0 8.0 5 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Friday, 03 / 22 / 2024 Hyd. No. 5 POST - SCM 1 Hydrograph type = SCS Runoff Peak discharge = 174.00 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 359,227 cuft Drainage area = 25.900 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 POST-SCM1 Hyd. No. 5 -- 25 Year Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 - Hyd No. 5 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Friday, 03 / 22 / 2024 Hyd. No. 5 POST - SCM 1 Hydrograph type = SCS Runoff Peak discharge = 204.29 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 425,161 cuft Drainage area = 25.900 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.02 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 0.0 2.0 4.0 — Hyd No. 5 6.0 POST-SCM1 Hyd. No. 5 -- 50 Year Q (cfs) 210.00 180.00 150.00 120.00 30.00 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) I- Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Friday, 03 / 22 / 2024 Hyd. No. 5 POST - SCM 1 Hydrograph type = SCS Runoff Peak discharge = 236.09 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 495,327 cuft Drainage area = 25.900 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 POST-SCM1 Hyd. No. 5 -- 100 Year Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 0.00 ' ' ' ' 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 - Hyd No. 5 Time (hrs) Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 23.29 2 726 80,928 ------ ------ ------ PRE - POND 1 2 SCS Runoff 4.927 2 730 20,485 ------ ------ ------ PRE - SCM 2 4 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ POST -VOID 5 SCS Runoff 76.70 2 716 154,887 ------ ------ ------ POST - SCM 1 6 SCS Runoff 21.91 2 716 44,253 ------ ------ ------ POST - SCM 1 B VOID 7 SCS Runoff 18.66 2 716 37,675 ------ ------ ------ POST - SCM 2 9 Reservoir 4.776 2 768 154,846 5 597.61 83,058 ROUTED-SCM 1 10 Reservoir 0.531 2 882 37,649 7 613.55 24,284 ROUTED-BMP 2 19076 Hydrographs.gpw Return Period: 2 Year Wednesday, 03 / 27 / 2024 2 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 03 / 27 / 2024 Hyd. No. 9 ROUTED-SCM 1 Hydrograph type = Reservoir Peak discharge = 4.776 cfs Storm frequency = 2 yrs Time to peak = 12.80 hrs Time interval = 2 min Hyd. volume = 154,846 cuft Inflow hyd. No. = 5 - POST - SCM 1 Max. Elevation = 597.61 ft Reservoir name = SCM 1 Max. Storage = 83,058 cuft Storage Indication method used. ROUTED-SCM 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 54.82 2 726 176,384 ------ ------ ------ PRE - POND 1 2 SCS Runoff 11.76 2 730 44,647 ------ ------ ------ PRE - SCM 2 4 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ POST -VOID 5 SCS Runoff 136.39 2 716 278,765 ------ ------ ------ POST - SCM 1 6 SCS Runoff 38.97 2 716 79,647 ------ ------ ------ POST - SCM 1 B VOID 7 SCS Runoff 33.18 2 716 67,808 ------ ------ ------ POST - SCM 2 9 Reservoir 34.37 2 724 278,718 5 598.68 128,920 ROUTED-SCM 1 10 Reservoir 7.174 2 726 67,782 7 614.07 32,557 ROUTED-BMP 2 19076 Hydrographs.gpw Return Period: 10 Year Wednesday, 03 / 27 / 2024 4 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 03 / 27 / 2024 Hyd. No. 9 ROUTED-SCM 1 Hydrograph type = Reservoir Peak discharge = 34.37 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 278,718 cuft Inflow hyd. No. = 5 - POST - SCM 1 Max. Elevation = 598.68 ft Reservoir name = SCM 1 Max. Storage = 128,920 cuft Storage Indication method used. Q (cfs) 140.00 120.00 100.00 40.00 0.00 0 4 8 — Hyd No. 9 ROUTED-SCM 1 Hyd. No. 9 -- 10 Year Q (cfs) 140.00 120.00 100.00 .1 01 40.00 20.00 0.00 12 16 20 24 28 32 36 40 44 48 Time (hrs) Hyd No. 5 ® Total storage used = 128,920 cult Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 76.85 2 724 243,345 ------ ------ ------ PRE - POND 1 2 SCS Runoff 16.50 2 728 61,597 ------ ------ ------ PRE - SCM 2 4 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ POST -VOID 5 SCS Runoff 174.00 2 716 359,227 ------ ------ ------ POST - SCM 1 6 SCS Runoff 49.71 2 716 102,636 ------ ------ ------ POST - SCM 1 B VOID 7 SCS Runoff 42.32 2 716 87,380 ------ ------ ------ POST - SCM 2 9 Reservoir 60.56 2 724 359,179 5 599.33 159,066 ROUTED-SCM 1 10 Reservoir 15.76 2 724 87,354 7 614.48 39,435 ROUTED-BMP 2 19076 Hydrographs.gpw Return Period: 25 Year Wednesday, 03 / 27 / 2024 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 03 / 27 / 2024 Hyd. No. 9 ROUTED-SCM 1 Hydrograph type = Reservoir Peak discharge = 60.56 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 359,179 cuft Inflow hyd. No. = 5 - POST - SCM 1 Max. Elevation = 599.33 ft Reservoir name = SCM 1 Max. Storage = 159,066 cuft Storage Indication method used. Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 1 11 ROUTED-SCM 1 Hyd. No. 9 -- 25 Year Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 44 Time (hrs) Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 95.47 2 724 300,117 ------ ------ ------ PRE - POND 1 2 SCS Runoff 20.53 2 728 75,967 ------ ------ ------ PRE - SCM 2 4 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ POST -VOID 5 SCS Runoff 204.29 2 716 425,161 ------ ------ ------ POST - SCM 1 6 SCS Runoff 58.37 2 716 121,475 ------ ------ ------ POST - SCM 1 B VOID 7 SCS Runoff 49.69 2 716 103,418 ------ ------ ------ POST - SCM 2 9 Reservoir 79.60 2 722 425,112 5 599.82 182,064 ROUTED-SCM 1 10 Reservoir 26.17 2 722 103,392 7 614.74 44,089 ROUTED-BMP 2 19076 Hydrographs.gpw Return Period: 50 Year Wednesday, 03 / 27 / 2024 8 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 03 / 27 / 2024 Hyd. No. 9 ROUTED-SCM 1 Hydrograph type = Reservoir Peak discharge = 79.60 cfs Storm frequency = 50 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 425,112 cuft Inflow hyd. No. = 5 - POST - SCM 1 Max. Elevation = 599.82 ft Reservoir name = SCM 1 Max. Storage = 182,064 cuft Storage Indication method used. Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 0 4 — Hyd No. 9 ROUTED-SCM 1 Hyd. No. 9 -- 50 Year Q (cfs) 210.00 180.00 150.00 120.00 30.00 '' ' 0.00 8 12 16 20 24 28 32 36 Time (hrs) Hyd No. 5 ® Total storage used = 182,064 cult Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 115.59 2 724 361,960 ------ ------ ------ PRE - POND 1 2 SCS Runoff 24.89 2 728 91,621 ------ ------ ------ PRE - SCM 2 4 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ POST -VOID 5 SCS Runoff 236.09 2 716 495,327 ------ ------ ------ POST - SCM 1 6 SCS Runoff 67.45 2 716 141,522 ------ ------ ------ POST - SCM 1 B VOID 7 SCS Runoff 57.43 2 716 120,485 ------ ------ ------ POST - SCM 2 9 Reservoir 86.15 2 724 495,277 5 600.36 208,850 ROUTED-SCM 1 10 Reservoir 37.45 2 720 120,459 7 614.93 47,461 ROUTED-BMP 2 19076 Hydrographs.gpw Return Period: 100 Year Wednesday, 03 / 27 / 2024 10 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Wednesday, 03 / 27 / 2024 Hyd. No. 9 ROUTED-SCM 1 Hydrograph type = Reservoir Peak discharge = 86.15 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 495,277 cuft Inflow hyd. No. = 5 - POST - SCM 1 Max. Elevation = 600.36 ft Reservoir name = SCM 1 Max. Storage = 208,850 cuft Storage Indication method used. Q (cfs) ROUTED-SCM 1 Hyd. No. 9 -- 100 Year Q (cfs) 0 4 — Hyd No. 9 8 12 16 20 24 28 32 36 Time (hrs) — Hyd No. 5 ® Total storage used = 208,850 cult Project: McCoy Farm DPR DESIGN, INC Prepared By: JMM Job No.: 19076 Checked By: HN Location: Wesley Chapel, NC Date: 02-09-2022 Rev:03-27-2024 - ua-1 Total Drainage Area (A): Total Impervious Area "I" USED = 45.0% (for Design) (See attached Impervious Ca/cs) otal Water Quality Volume To Treat (First 1" of R; WQv = (P/12) (A) (Rv) (43560) _ (Simple Method, Schueler) P. Water Quality Design Storm, 1st Inch of Rainfall A: Drainage Area (Impervious Area Only) Rv. 0.05 + 0.009 (I) = I: % of Impervious Area Qv = (P-0.2S)12/ (P+0.8S) ' A' (43560/12) _ (SCS Method) P. Design Storm, 1-yr 24-hr Storm Rainfall depth A: Drainage Area S = 1,000/CN-10 = CN. Curve Number Qv = (P-0.2S)12/ (P+0.8S) ' A' (43560/12) _ (SCS Method) P. Design Storm, 10-yr 24-hr Storm Rainfall depth A: Drainage Area S = 1000/CN-10 = CN. Curve Number Vol -Pre = (0.2)(WQv) = Af=((WQ v) (D0]/ ((k) (Hf + Df) (TO] = (From Mecklenburg BMP Manual, Based on Darcy's Law) WQv: Water quality volume Df Filter bed depth (1.5' Minimum) k: Permeability coefficient of filter media (1.75" per hour, or 3.5' per day) Hf Average height of water above filter bed, (half of pond depth, V max) Tf = Design filter bed drain time in days, (2 days beyond center 24-hr storm) Depth of Pond Water (24" Max.)= 6.30 ac 2.84 lac 7,804 cf inch 6.30 ac. 0.455 29,162 cf 2.95 inch 6.30 ac. 2.35 inch 72,328 cf 5.2 inch 6.30 ac. 2.35 inch 1,561 cf 446 sf 7,804 cf 1.0 ft 3.50 ft/day 1.00 ft 2.500 days 24 inch printed 3252024 Z: IShareMProiects12019W9076 Carolyn Farm-Kahuna Group-Westley ChapellCALCSISCM119076-SCM PONDS and Sand Filter Insert TableAs page 1 of 3 Project: McCoy Farm DPR DESIGN, INC Prepared By: JMM Job No.: 19076 Checked By: HN Location: Wesley Chapel, NC Date: 02-09-2022 Rev:03-27-2024 Volume of Sand Chamber required (WQ Volume x 50%), NCDEQ MDC 3 (4): 3,902 cf Volume of the Sand Chamber provided: 10,138 1 cf * Filtration Media Surface Area Provided: sf Area of Sand Filter required (50% WQ Volume / WQ Ponding design depth), NCDEQ MDC 3 (3): sf �Vsf Area of sand Filter provided: SCM Storage Volume Provided: WQ Sand WQ Sand Chamber WQ Chamber Sediment Overall Overall Incremental Chamber Chamber Total Notes Elevation Storage Total Storage Area Area Surface Area Storage Storage (ft) (so A A (so (so A A 609.0 Bottom of Stone - Provide liner per geo recommendation 610.5 Top of Stone/Bottom of Sand 611.5 of Sand Filter/ Bottom of Extended Dry Detention Pond _Top 611.5 2,650 0 0 --- 2,650 0 0 Pond Bot 612.0 7,100 2,438 2,438 3,200 10,000 3,163 3,163 613.0 8,300 7,700 10,138 5,600 15,000 12,500 15,663 614.0 16,500 15,750 31,413 614.5 17,200 8,425 39,838 615.0 17,900 8,775 48,613 616.0 19,500 18,700 67,313 Pond Top Static Water Quality Elevation @ ft Design Static Water Quality Elevation @ ft aft Static Channel Protection Elevation @ ESHTW = 608 (615.00 - 7) IN THE SUMMIT GEOTECH REPORT DATED 2020-01-312. * BMP - SAND FILTER �0 * Water Draw Down Flow Rate Thru Sand Filter Media Qo = WQv/Tf = (Ao(k)(Hf+Do1Df = 0.1610 cfs (Darcy's Law) k: Permeability coefficient of filter media 3.5 ft/day Af.- Surface area of sand media, sf 2,650 sf Hf.- Average height of water above filter bed 0.50 ft Df.- Depth of soil filter bed 1.0 ft Q c @ Top of Media 0.0 @ 611.5 = 0.0000 cfs Q c @ Median of WQv storage 0.5 @ 612.0 = 0.1610 cfs Q c @ Top of WQv storage 1.0 @ 612.5 = 0.1620 cfs Q c @ Above WQv storage 2.0 @ 614.0 = 0.2430 cfs * Time Drawdown from Inundation to Saturation surface Tf = WQv/ Qo 13.46 hrs * Orifice Calcs For Channel Protection Dewatering Time 2 days (48 hrs) Beyond Center of 24-hr Storm (Sized for the Volume of 1-yr Storm with 50% remained at 36th Hour, 5% remained at 60th Hour, and drained completely at 120th Hour). 1-yr Storm Volume, Less 50% Remain Beyond 36th Hour 14,581 cf Average Surface Area 6,162 sf Area of Outlet Orifice (so, a = 2 A( )( )hA(1/2))/(c)(t)(2g)^(1/2)) NCDENR, Orifice E uation a = 0.030 where: A= ResevoirArea, sf 6,162 Approx. Orifice Diameter (inch), d = 2.34 h= Falling Head, ft 2.26 c= Discharge Coefficient 0.6 Orifice Diameter (inch) Used, d = 2.5 t= Time ( 36 hrs), sec. 129,600 g= Accelleration, ft/sq.se 32.2 a= Orifice Area (so d= Orifice Diameter (inch) * Sizing Under Drain Pipes Q: Draw down rate thru sand filter 0.1610 cfs printed 3252024 Z: IShareMProiects12019W9076 Carolyn Farm-Kahuna Group-Westley ChapellCALCSISCMW9076-SCM PONDS and Sand Filter Insert TableAs page 2 of 3 Project: McCoy Farm DPR DESIGN, INC Prepared By: JMM Job No.: 19076 Checked By: HN Location: Wesley Chapel, NC Date: 02-09-2022 Rev:03-27-2024 Use (6) 35 If of 6" Sch 40 PVC, Use 6 of w/ 318" perforations spaced 6" on center, 4 rows w/ 90-deg apart 35 LF of 6 1 inch # of Perforation = (# pipes)(2 holes per foot)(Linear feet/per pipe)(4 rows per pipe) = (6 pipes) (2)(35 /0(4) 1680 holes Capacity of one hole (3/8") = CA( (orifice equation) 0.0078 cfs c= Discharge Coefficient 0.6 g=Accelleration, ft/sq.sec 32.2 a= Orifice Area (so of 3/8"hole 0.0008 h= head above perforation 4.5 Total Capacity = Capacity of 1 hole x # of holes 13.1547 cfs Total Capacity w/ 50% lost to clogging 6.5773 cfs Underdrain Pipe Capacity= 1.49/n(A)(A/P)1(2/3) (Manning Eq) 0.395 cfs n= pipe coefficient 0.013 A= Area (so of 6 " dia pipe 0.1963 P= Pipe Perimeter, ft 1.57 s= slope, 0.5% 0.005 Underdrain Pipe Capacity w/ 50% lost to clogging 0.1974 cfs Both Flow Rates thru Perforation and Pipe are greater than that of Flow rate of Sand Filter Outlet Pipe Size (I.D.) = 30 in Outlet Pipe Size (O.D.) = 3.08 ft L, Length of Outlet Pipe = 61 If Min. Flow Length = 70.2 ft Min. Flow Length: Total Lengh of Collar offset = 9.1 ft 115% of outlet pipe Number of anti -seep collars 3 Offset per collar 3.1 ft Min. Outside dimension of each collar 6.13 ft Designed collars 3 at 6.5' x 6.5' printed 3252024 Z: IShareMProiects12019V9076 Carolyn Farm-Kahuna Group-Westley ChapellCALCSISCMV9076-SCM PONDS and Sand Filter Insert TableAs page 3 of 3 Project: McCoy Farm DPR DESIGN, INC Prepared By: JMM Job No.: 19076 Checked By: HN Location: Wesley Chapel, NC Date: 02-09-2022 Rev: 03-27-2024 Charbtto-Meckle bu STORM WATER Services SCM Inset Table Sand Filter - SCM #2 Project Name: McCoy Farm Se uencelD: 2 Drainage Area (acres): 6.3 Land Use/Development Type: > 2 acres - Residential Open Space Vegetation Type: Grassed Percent Built -Upon Area: 45% Sediment Chamber Length (ft.): 80 Sediment Chamber Width ft.: 81 Sediment Chamber Height ft.: 1 Sand Filter Type. Surface Media Depth ft.: 1 Media Surface Area ft2 : 2,650 Flow Diverter Present Y/N : N Regulated By: Watershed Overlay Treatment Effectiveness: Optimal NC State Plane X eastin : 1498750 NC State Plane Y (northing): 463440 printed 3/25/2024 Z: IShareMProjects12019119076 Carolyn Farm-Kahuna Group-Westley ChapellCALCSISCM119076-SCM PONDS and Sand Filter Insert TableAs page 1 of 1 Pond Report 2 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Monday, 03 / 25 / 2024 Pond No. 5 - SCM 2 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 611.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 611.50 2,650 0 0 0.50 612.00 10,000 3,163 3,163 1.50 613.00 15,000 12,500 15,663 2.50 614.00 16,500 15,750 31,413 3.00 614.50 17,200 8,425 39,838 3.50 615.00 17,900 8,775 48,613 4.50 616.00 19,500 18,700 67,313 Culvert / Orifice Structures Weir Structures 2024-03-27 [A] [Bl [C] [PrFRSr] [A] [Bl [C] [D] Rise (in) = 30.00 2.50 12.00 0.00 Crest Len (ft) = 16.00 16.00 10.00 0.00 Span (in) = 30.00 2.50 14.00 0.00 Crest El. (ft) = 615.50 614.50 615.00 0.00 No. Barrels = 1 1 4 0 WeirCoeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 609.20 613.00 613.50 0.00 Weir Type = 1 Rect Broad --- Length (ft) = 60.00 0.50 0.50 0.00 Multi -Stage = Yes Yes No No Slope (%) = 0.83 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 611.50 0.00 0.00 0.00 --- 0.00 0.00 0.00 --- --- --- 0.000 0.05 316 611.55 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.012 0.012 0.10 633 611.60 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.024 0.024 0.15 949 611.65 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.036 0.036 0.20 1,265 611.70 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.049 0.049 0.25 1,581 611.75 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.061 0.061 0.30 1,898 611.80 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.073 0.073 0.35 2,214 611.85 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.085 0.085 0.40 2,530 611.90 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.097 0.097 0.45 2,846 611.95 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.109 0.109 0.50 3,163 612.00 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.122 0.122 0.60 4,413 612.10 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.126 0.126 0.70 5,663 612.20 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.130 0.130 0.80 6,913 612.30 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.134 0.134 0.90 8,163 612.40 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.138 0.138 1.00 9,413 612.50 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.142 0.142 1.10 10,663 612.60 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.146 0.146 1.20 11,913 612.70 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.150 0.150 1.30 13,163 612.80 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.154 0.154 1.40 14,413 612.90 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.158 0.158 1.50 15,663 613.00 19.22 oc 0.00 0.00 --- 0.00 0.00 0.00 --- --- 0.162 0.162 1.60 17,238 613.10 19.22 oc 0.02 is 0.00 --- 0.00 0.00 0.00 --- --- 0.166 0.184 1.70 18,813 613.20 19.22 oc 0.05 is 0.00 --- 0.00 0.00 0.00 --- --- 0.170 0.221 1.80 20,388 613.30 19.22 oc 0.07 is 0.00 --- 0.00 0.00 0.00 --- --- 0.174 0.247 1.90 21,963 613.40 19.22 oc 0.09 is 0.00 --- 0.00 0.00 0.00 --- --- 0.178 0.267 2.00 23,538 613.50 19.22 oc 0.10 is 0.00 --- 0.00 0.00 0.00 --- --- 0.182 0.285 2.10 25,113 613.60 19.22 oc 0.12 is 0.50 is --- 0.00 0.00 0.00 --- --- 0.186 0.803 2.20 26,688 613.70 19.22 oc 0.13 is 1.42 is --- 0.00 0.00 0.00 --- --- 0.190 1.736 2.30 28,263 613.80 19.22 oc 0.14 is 2.61 is --- 0.00 0.00 0.00 --- --- 0.194 2.939 2.40 29,838 613.90 19.22 oc 0.15 is 4.02 is --- 0.00 0.00 0.00 --- --- 0.198 4.361 2.50 31,413 614.00 19.22 oc 0.16 is 5.62 is --- 0.00 0.00 0.00 --- --- 0.202 5.975 2.55 32,255 614.05 19.22 oc 0.16 is 6.48 is --- 0.00 0.00 0.00 --- --- 0.206 6.846 2.60 33,098 614.10 19.22 oc 0.16 is 7.38 is --- 0.00 0.00 0.00 --- --- 0.210 7.758 2.65 33,940 614.15 19.22 oc 0.17 is 8.33 is --- 0.00 0.00 0.00 --- --- 0.214 8.709 2.70 34,783 614.20 19.22 oc 0.17 is 9.31 is --- 0.00 0.00 0.00 --- --- 0.218 9.696 2.75 35,625 614.25 19.22 oc 0.18 is 10.32 is --- 0.00 0.00 0.00 --- --- 0.222 10.72 Continues on next page... K SCM 2 Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs 2.80 36,468 614.30 19.22 oc 2.85 37,310 614.35 19.22 oc 2.90 38,153 614.40 19.22 oc 2.95 38,995 614.45 19.22 oc 3.00 39,838 614.50 19.22 oc 3.05 40,715 614.55 19.22 oc 3.10 41,593 614.60 19.31 oc 3.15 42,470 614.65 21.42 oc 3.20 43,348 614.70 23.77 oc 3.25 44,225 614.75 26.33 oc 3.30 45,103 614.80 29.06 oc 3.35 45,980 614.85 31.96 oc 3.40 46,858 614.90 35.01 oc 3.45 47,735 614.95 38.20 oc 3.50 48,613 615.00 41.51 is 3.60 50,483 615.10 45.92 is 3.70 52,353 615.20 48.13 is 3.80 54,223 615.30 49.45 is 3.90 56,093 615.40 50.50 is 4.00 57,963 615.50 51.41 is 4.10 59,833 615.60 52.33 is 4.20 61,703 615.70 53.21 is 4.30 63,573 615.80 53.96 is 4.40 65,443 615.90 54.63 is 4.50 67,313 616.00 55.25 is ... End CIvB CIvC PrfRsr WrA WrB WrC Wrl) ExfiI User Total cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.18 is 11.37 is --- 0.00 0.00 0.00 --- --- 0.227 11.77 0.18 is 12.45 is --- 0.00 0.00 0.00 --- --- 0.231 12.86 0.19 is 13.56 is --- 0.00 0.00 0.00 --- --- 0.235 13.99 0.19 is 14.71 is --- 0.00 0.00 0.00 --- --- 0.239 15.14 0.19 is 15.89 is --- 0.00 0.00 0.00 --- --- 0.243 16.33 0.20 is 16.66 is --- 0.00 0.60 0.00 --- --- 0.243 17.70 0.20 is 17.40 is --- 0.00 1.68 0.00 --- --- 0.243 19.53 0.20 is 18.12 is --- 0.00 3.10 0.00 --- --- 0.243 21.66 0.21 is 18.80 is --- 0.00 4.77 0.00 --- --- 0.243 24.02 0.21 is 19.46 is --- 0.00 6.66 0.00 --- --- 0.243 26.57 0.21 is 20.10 is --- 0.00 8.75 0.00 --- --- 0.243 29.31 0.22 is 20.72 is --- 0.00 11.03 0.00 --- --- 0.243 32.20 0.22 is 21.32 is --- 0.00 13.47 0.00 --- --- 0.243 35.25 0.22 is 21.90 is --- 0.00 16.08 0.00 --- --- 0.243 38.44 0.20 is 22.47 is --- 0.00 18.84 0.00 --- --- 0.243 41.75 0.15 is 21.01 is --- 0.00 24.76 0.82 --- --- 0.243 46.99 0.13 is 17.44 is --- 0.00 30.57 s 2.33 --- --- 0.243 50.70 0.11 is 15.43 is --- 0.00 33.90 s 4.27 --- --- 0.243 53.96 0.10 is 13.90 is --- 0.00 36.50 s 6.58 --- --- 0.243 57.32 0.09 is 12.65 is --- 0.00 38.67 s 9.19 --- --- 0.243 60.84 0.08 is 11.14 is --- 1.68 39.43 s 12.08 --- --- 0.243 64.66 0.07 is 9.55 is --- 4.70 s 38.88 s 15.22 --- --- 0.243 68.67 0.06 is 8.31 is --- 7.18 s 38.39 s 18.60 --- --- 0.243 72.79 0.05 is 7.34 is --- 9.21 s 38.01 s 22.19 --- --- 0.243 77.04 0.05 is 6.55 is --- 10.94 s 37.69 s 26.00 --- --- 0.243 81.47 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Thursday, 12 / 14 / 2023 Hyd. No. 7 POST - SCM 2 Hydrograph type = SCS Runoff Peak discharge = 13.62 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 27,339 cuft Drainage area = 6.300 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 14.00 12.00 10.00 : M . Me 4.00 2.00 POST -SCM2 Hyd. No. 7 -- 1 Year Q (cfs) 14.00 12.00 10.00 M . ee 4.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 7 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Monday, 03 / 25 / 2024 Hyd. No. 1 PRE-POND1 Hydrograph type = SCS Runoff Peak discharge = 13.43 cfs Storm frequency = 1 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 51,618 cuft Drainage area = 24.500 ac Curve number = 67.5* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.04 min Total precip. = 2.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(33.600 x 68)] / 24.500 Q (cfs) 14.00 12.00 10.00 Um . Me 4.00 2.00 PRE - POND 1 Hyd. No. 1 -- 1 Year Q (cfs) 14.00 12.00 10.00 4.00 2.00 0.00 1 1 1 1 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 2 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Monday, 03 / 25 / 2024 Hyd. No. 1 PRE-POND1 Hydrograph type = SCS Runoff Peak discharge = 115.59 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 361,960 cuft Drainage area = 24.500 ac Curve number = 67.5* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.04 min Total precip. = 7.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(33.600 x 68)] / 24.500 Q (cfs) 120.00 100.00 40.00 0.00 0 2 4 — Hyd No. 1 PRE - POND 1 Hyd. No. 1 -- 100 Year 6 8 10 12 14 Q (cfs) 120.00 100.00 40.00 20.00 ' ' ' 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 10 ROUTED-BMP 2 Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 7 - POST - SCM 2 Reservoir name = SCM 2 Storage Indication method used. Elev (ft) 615.00 614.00 613.00 612.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage ROUTED-BMP 2 Hyd. No. 10 -- 1 Year Monday, 03 / 25 / 2024 = 0.225 cfs = 18.37 hrs = 27,313 cuft = 613.21 ft = 19,024 cuft Elev (ft) 615.00 614.00 613.00 612.00 611.00 ' ' ' ' ' ' ' ' ' ' ' ' 611.00 0 8 16 24 32 40 48 56 64 72 80 88 — 5. SCM 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Thursday, 12 / 14 / 2023 Hyd. No. 2 PRE - SCM 2 Hydrograph type = SCS Runoff Peak discharge = 4.927 cfs Storm frequency = 2 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 20,485 cuft Drainage area = 6.300 ac Curve number = 67.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 26.00 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 ---L 0 2 4 — Hyd No. 2 PRE - SCM 2 Hyd. No. 2 -- 2 Year 6 8 10 12 14 Q (cfs) 5.00 4.00 3.00 2.00 1.00 ' 0.00 16 18 20 22 24 26 Time (hrs) 2 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Thursday, 12 / 14 / 2023 Hyd. No. 2 PRE - SCM 2 Hydrograph type = SCS Runoff Peak discharge = 11.76 cfs Storm frequency = 10 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 44,647 cuft Drainage area = 6.300 ac Curve number = 67.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 26.00 min Total precip. = 5.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - SCM 2 Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Thursday, 12 / 14 / 2023 Hyd. No. 2 PRE - SCM 2 Hydrograph type = SCS Runoff Peak discharge = 16.50 cfs Storm frequency = 25 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 61,597 cuft Drainage area = 6.300 ac Curve number = 67.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 26.00 min Total precip. = 6.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 18.00 15.00 12.00 •M .M 3.00 e PRE - SCM 2 Hyd. No. 2 -- 25 Year 2 4 6 8 10 12 14 Hyd No. 2 Q (cfs) 18.00 15.00 12.00 M M 3.00 0.00 16 18 20 22 24 26 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Thursday, 12 / 14 / 2023 Hyd. No. 2 PRE - SCM 2 Hydrograph type = SCS Runoff Peak discharge = 20.53 cfs Storm frequency = 50 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 75,967 cuft Drainage area = 6.300 ac Curve number = 67.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 26.00 min Total precip. = 7.02 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 3.00 PRE - SCM 2 Hyd. No. 2 -- 50 Year Q (cfs) 21.00 18.00 15.00 12.00 • us 3.00 0.00 0- ' ' ' ' ' ' " ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 2 Time (hrs) I- Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Thursday, 12 / 14 / 2023 Hyd. No. 2 PRE - SCM 2 Hydrograph type = SCS Runoff Peak discharge = 24.89 cfs Storm frequency = 100 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 91,621 cuft Drainage area = 6.300 ac Curve number = 67.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 26.00 min Total precip. = 7.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 16.00 12.00 4.00 0.00 1 0 2 4 — Hyd No. 2 6 8 PRE - SCM 2 Hyd. No. 2 -- 100 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 .r— I I I I I I -r1% 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Thursday, 12 / 14 / 2023 Hyd. No. 7 POST - SCM 2 Hydrograph type = SCS Runoff Peak discharge = 18.66 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 37,675 cuft Drainage area = 6.300 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 1 0 2 4 — Hyd No. 7 6 8 POST -SCM2 Hyd. No. 7 -- 2 Year Q (cfs) 21.00 18.00 15.00 12.00 • us 3.00 ..W► ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 2 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 7 POST - SCM 2 Hydrograph type = SCS Runoff Peak discharge = Storm frequency = 10 yrs Time to peak = Time interval = 2 min Hyd. volume = Drainage area = 6.300 ac Curve number = Basin Slope = 0.0 % Hydraulic length = Tc method = User Time of conc. (Tc) = Total precip. = 5.20 in Distribution = Storm duration = 24 hrs Shape factor = Thursday, 12 / 14 / 2023 33.18 cfs 11.93 hrs 67,808 cuft 81 0 ft 5.00 min Type II 484 Q (cfs) POST -SCM2 Hyd. No. 7 -- 10 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0.0 2.0 - Hyd No. 4.0 6.0 8.0 7 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Thursday, 12 / 14 / 2023 Hyd. No. 7 POST - SCM 2 Hydrograph type = SCS Runoff Peak discharge = 42.32 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 87,380 cuft Drainage area = 6.300 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.21 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 40.00 30.00 10.00 0.00 0.0 2.0 4.0 — Hyd No. 7 6.0 8.0 POST -SCM2 Hyd. No. 7 -- 25 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 "'— ' 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) Hydrograph Report 4 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 7 POST - SCM 2 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 6.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.02 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 30.00 10.00 0.00 0.0 2.0 4.0 — Hyd No. 7 6.0 8.0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST -SCM2 Hyd. No. 7 -- 50 Year Thursday, 12 / 14 / 2023 = 49.69 cfs = 11.93 hrs = 103,418 cuft = 81 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 --r- ' ' ' 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) Hydrograph Report I- Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 7 POST - SCM 2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 6.300 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.87 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 40.00 30.00 10.00 0.00 0.0 2.0 4.0 — Hyd No. 7 6.0 8.0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST -SCM2 Hyd. No. 7 -- 100 Year Thursday, 12 / 14 / 2023 = 57.43 cfs = 11.93 hrs = 120,485 cuft = 81 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 --T ' ' ' 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) Hydrograph Report 1 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. 10 ROUTED-BMP 2 Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 7 - POST - SCM 2 Reservoir name = SCM 2 Storage Indication method used. Q (cfs) 21.00 18.00 15.00 12.00 • Me 3.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage ROUTED-BMP 2 Hyd. No. 10 -- 2 Year Monday, 03 / 25 / 2024 = 0.531 cfs = 14.70 hrs = 37,649 cuft = 613.55 ft = 24,284 cuft Q (cfs) 21.00 18.00 15.00 12.00 • us 3.00 0.00 ' ' � I I I ' 0.00 0 8 16 24 32 40 48 56 64 72 80 88 Time (hrs) — Hyd No. 10 Hyd No. 7 ® Total storage used = 24,284 cult 2 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Monday, 03 / 25 / 2024 Hyd. No. 10 ROUTED-BMP 2 Hydrograph type = Reservoir Peak discharge = 7.174 cfs Storm frequency = 10 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 67,782 cuft Inflow hyd. No. = 7 - POST - SCM 2 Max. Elevation = 614.07 ft Reservoir name = SCM 2 Max. Storage = 32,557 cuft Storage Indication method used. Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 0.00 0 6 12 — Hyd No. 10 ROUTED-BMP 2 Hyd. No. 10 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 18 24 30 36 42 48 54 60 66 Time (hrs) Hyd No. 7 ® Total storage used = 32,557 cult Hydrograph Report 3 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Monday, 03 / 25 / 2024 Hyd. No. 10 ROUTED-BMP 2 Hydrograph type = Reservoir Peak discharge = 15.76 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 87,354 cuft Inflow hyd. No. = 7 - POST - SCM 2 Max. Elevation = 614.48 ft Reservoir name = SCM 2 Max. Storage = 39,435 cuft Storage Indication method used Q (cfs) 50.00 40.00 30.00 10.00 0.00 0 4 — Hyd No. 10 ROUTED-BMP 2 Hyd. No. 10 -- 25 Year 8 12 16 20 24 28 32 36 — Hyd No. 7 ® Total storage used = 39,435 cuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 —6- 0.00 40 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Monday, 03 / 25 / 2024 Hyd. No. 10 ROUTED-BMP 2 Hydrograph type = Reservoir Peak discharge = 26.17 cfs Storm frequency = 50 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 103,392 cuft Inflow hyd. No. = 7 - POST - SCM 2 Max. Elevation = 614.74 ft Reservoir name = SCM 2 Max. Storage = 44,089 cuft Storage Indication method used. Q (cfs) 50.00 40.00 30.00 10.00 0.00 ' 0 2 4 — Hyd No. 10 6 8 ROUTED-BMP 2 Hyd. No. 10 -- 50 Year 10 12 Hyd No. 7 Q (cfs) 50.00 40.00 30.00 20.00 10.00 ' ' —_'_' 0.00 14 16 18 20 22 24 26 28 Time (hrs) ® Total storage used = 44,089 cult I- Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Monday, 03 / 25 / 2024 Hyd. No. 10 ROUTED-BMP 2 Hydrograph type = Reservoir Peak discharge = 37.45 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 120,459 cuft Inflow hyd. No. = 7 - POST - SCM 2 Max. Elevation = 614.93 ft Reservoir name = SCM 2 Max. Storage = 47,461 cuft Storage Indication method used. Q (cfs) 60.00 50.00 40.00 30.00 10.00 0.00 ' -.L. 0 2 4 — Hyd No. 10 ROUTED-BMP 2 Hyd. No. 10 -- 100 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 7 ® Total storage used = 47,461 cult Project: McCoy Farm DPR DESIGN, INC. Created by: JMM Project#: 19076 SCM OUTLET STRUCTURE Checked by: HN Location: Wesley Chapel, NC BOUYANCY CALCULATIONS Date: 06/14/2023 Rev: 03/27/2024 OUTLET STRUCTURE BOUYANCY CALCULATION SCM Number SCM #1 SCM #2 Structure Number 1 D-01 2C-01 WEIGHT OF DISPLACED WATER BY STRUCTURE Volume of riser: Outlet Pipe Diameter (in) = 36 30 Outside Length (ft) = 4.00 5.00 Outside Width (ft) = 5.00 5.00 Wall Thickness (ft) = 0.50 0.50 0.50 Weir Elev (ft) = 599.60 614.50 Invert Out (ft) = 591.80 609.20 Height of Weir to Invert Out (ft) = 7.80 5.30 0.00 Riser Volume (cu.ft) = 156.00 132.50 0.00 Volume of base: Length (ft) = 4.00 5.00 0.00 Width (ft)= 5.00 5.00 0.00 Height (ft) = 0.67 0.67 0.67 Base Volume (cu.ft) = 13.33 16.67 0.00 Total Volume of Structure: 169.33 149.17 0.00 Weight of Water (Ibs/cu.ft) = 62.4 62.4 62.4 Weight of Water Displaced (Ibs) 10,566 9,308 0 WEIGHT OF STRUCTURE Volume of Base (cu ft) = 13.33 16.67 0.00 Volume of riser: Outside Area (sf) = 20.00 25.00 0.00 Inside Area (sf) = 12.00 16.00 1.00 Net Area (sf) = 8.00 9.00 -1.00 Height of Riser to Weir (ft) = 7.80 5.30 0.00 Volume of Riser (cu ft) = 62.40 47.70 0.00 Area Loss for outlet pipe opening (sf): 7.07 4.91 0.00 Volume Loss for outlet pipe opening (cu.ft): -3.53 -2.45 0.00 Net Volume of Riser (sf) = 58.87 45.25 0.00 Volume of Posts (cu.ft): Weir Height (in) = 6.00 6.00 6.00 Volume of Posts (cu.ft) = 0.89 0.89 0.89 Volume of Top Slab (cu.ft): Length (ft) = 4.00 5.00 0.00 Width (ft)= 5.00 5.00 0.00 Thickness (in) = 6.00 6.00 6.00 Volume of Top slab (cu.ft) = 10.00 12.50 0.00 Volume Loss for Opening for Frame/Cover (cu ft) = 1.83 1.83 1.83 Volume of Top slab (cu.ft) = 8.17 10.67 -1.83 Weight of Concrete in Structure (Ibs) = 13,001 11,755 -151 Weight of Ring and Cover (Ibs) = 230 230 230 Total Weiaht Structure (Ibs) = 13,231 11,985 79 Anchor Block: Length* (ft) = 5.00 6.00 1.00 Width* (ft) = 6.00 6.00 1.00 Height* (ft) = 0.00 0.00 Anchor Block Volume (cu.ft) = 0.0 0.0 0.0 Weight of Water (Ibs/cu.ft) = 62.4 62.4 62.4 Weight of Water Displaced by Anchor Block (Ibs) 0 0 0 Weight of Anchor Block (Ibs) 0 0 0 Not Required Not Required Not Required *Length, Width, and Height are representative only. Anchor blocks are to be sized and designed by manufacturer to meet volume and weight minimums. NET BOUYANCY- PF Weight of Water Displaced (Ibs) _ 10,566 9,308 0 Total Weight Structure (Ibs) = 13,231 11,985 79 Bouyancy (Ibs) = 2,665 2,677 79 Safety Factor = 1.25 1.29 #DIV/01 *** Includes anchor block, if needed Z: ISharedlProjects12019119076 Carolyn F-Kahuna Group-Westley ChapeACALCSISCM119076-SCM Anchor Block.xls printed 326/2024 tz �L 0 0 0 0 0 0 c6 V O co N LO LO o6 co co coo co O 0 O O o ro 0 0 co ln0 08' l65 '13 'nul LO L) 00109 '13 wRi L U-1 - 6LE'Lb+0 elS 0 v 0 M O J N r W � I O J 2 uI 09' l69 '13 'AUI 00'L69 '13 TWO Ilelln0 - 00'00+0 elS 0 o 0 0 0 0 0 co NT O CO N W j ccoo coo coo cn cn cn N Lu �L 0 0 0 0 0 0 (6 N o6 4 O (6 co O O O O co O O O O 0 ro O ln0 OZ'609 '13 'Aul 001WIll wRi l :ul - 68Z"09+0 elS 0 (O O c a� 0 v C Cc M O J N LU O J 2 W 08'809 '13 'nul 9Z'L69 O TWO llegn0 - 00'00+0 e3S 0 0 0 0 0 0 0 O N O O (o j ccoo (No to co co ccoo N LU