Loading...
HomeMy WebLinkAboutNCC221901_NOT Closeout Documents_20240604 ROY COOPER `" Governor 6� >� j8' r •' ELIZABETH S.BISER Secretary ' Q" : WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality May 23, 2024 SEDIMENT AND EROSION CONTROL& CONSTRUCTION STORMWATER INSPECTION REPORT BEL Investments Camden, NC, LLC Attn: Mr. Daniel G. Elcan, Manager 2862 Dauphin Street Mobile. AL 36606 Dear Sir: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, it-...— r- I Richard Peed, CPESC ARPA Environmental Specialist II (252) 946-6481 D --4 North Carolina Department of Environmental Quality ! Division of Energy.Mineral and Land Resources Washington Regional Office 1943 Washington Square Mall I Washington.North Carolina 27889 '".. ^sa"Grvinmmont.thAAN r 252.946.6481 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington,NC 27889 (252) 946-6481 County: Camden Project: Family Dollar Camden River basin: Pasquotank Person financially responsible:BEL Investments,Elizabeth City,NC,LLC-Daniel Project#: CAMDE-2022-003 G Elcan,Manager Address: 2862 Dauphin St.,Mobile,AL 36606 1. Project Location: US 158,Courthouse Pictures: No 2. Weather and soil conditions: warm,sunny,dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? N/A Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Title: Inspection report: Sent Report Date given/sent: May 23,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self monitoring or self inspections are required.The project is in compliance and released under the SPCA.The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGOI)via a Notice of Termination(NOT). The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01 Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Richard Peed Others present: Date of inspection: May 10,2024 Time arriving on site: 11:40 AM Time leaving site: 11:55 AM cc: