HomeMy WebLinkAboutNCC221901_NOT Closeout Documents_20240604 ROY COOPER `"
Governor 6� >� j8'
r •'
ELIZABETH S.BISER
Secretary ' Q" :
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Interim Director Environmental Quality
May 23, 2024
SEDIMENT AND EROSION CONTROL& CONSTRUCTION STORMWATER
INSPECTION REPORT
BEL Investments Camden, NC, LLC
Attn: Mr. Daniel G. Elcan, Manager
2862 Dauphin Street
Mobile. AL 36606
Dear Sir:
Attached is a copy of the inspection report prepared following an onsite inspection of the project
referenced on the report. This report is intended to inform you of the project's compliance with
the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES
Stormwater General Permit.
Please review this report carefully as it may contain corrective actions needed and/or comments
which will assist you in meeting the required performance standards.
It is our desire that any and all possible problems be discussed and resolved at the earliest
possible time. To facilitate this effort, please contact me at the address/phone number below
should you have any questions.
Sincerely,
it-...— r- I
Richard Peed, CPESC
ARPA Environmental Specialist II
(252) 946-6481
D --4 North Carolina Department of Environmental Quality ! Division of Energy.Mineral and Land Resources
Washington Regional Office 1943 Washington Square Mall I Washington.North Carolina 27889
'".. ^sa"Grvinmmont.thAAN r 252.946.6481
Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington,NC 27889 (252) 946-6481
County: Camden Project: Family Dollar Camden River basin: Pasquotank
Person financially responsible:BEL Investments,Elizabeth City,NC,LLC-Daniel Project#: CAMDE-2022-003
G Elcan,Manager
Address: 2862 Dauphin St.,Mobile,AL 36606
1. Project Location: US 158,Courthouse
Pictures: No
2. Weather and soil conditions: warm,sunny,dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? N/A
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No One Title:
Inspection report: Sent Report Date given/sent: May 23,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self
monitoring or self inspections are required.The project is in compliance and released under
the SPCA.The permittee must request termination of coverage under the NPDES General
Stormwater Permit for Construction Activities(NCGOI)via a Notice of Termination(NOT).
The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01 Termination.Please note that
this correspondence must be uploaded as part of completing the NOT process.
Reported by: Richard Peed Others present:
Date of inspection: May 10,2024 Time arriving on site: 11:40 AM Time leaving site: 11:55 AM
cc: