HomeMy WebLinkAboutEmail RE Construction Stormwater NOI Not Accepted - 201474Sanford, Joyce
From: lase rfiche.ncdenr.gov@mccicloud.io
Sent: Friday, June 7, 2024 7:40 AM
To: ursula.robinson@pacetriad.org
Cc: Broussard, Brooklyn C; jhayes@well-spring.org; kmarlow@borum-wade.com
Subject: [External] Construction Stormwater NOI Not Accepted
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
This email is to notify you that your application for PACE of the Triad was not accepted for the following reason:
Ala/D5/D9. The uploaded NOI Certification form, letter of approval/grading permit, and Tab Ala must all have the same
project name.
Alb. Please verify your listed lot numbers. This conflicts with what is shown on the NOI certification form. Approval of
incorrect lot numbers will lead to incorrect lots being listed on your Certificate of Coverage.
A15a/A15b. Waterbody index number 12-94-7-1 is assigned to Fivemile Branch. Ensure you aren't entering the river
basin information.
B1. Permittee must be actively registered with the N.C. Secretary of State. Verify the business is listed as it is registered.
D6. Your uploaded FRO form needs to be signed/notarized.
Please submit a new NOL To auto -populate the new NOI, select'Yes' for the first question & enter NOI number 201474.
Contact B. Cole Broussard at Brooklyn. Broussard@deq.nc.gov with questions. Thank you.
For additional support, please visit our NPDES Stormwater Construction Program website at https://deq.nc.gov/NCG01.
The NOI application no. for this project is 201474.
ARPA grant funding indicated? No
ARPA Project No. entered (if applicable)?
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.