Loading...
HomeMy WebLinkAbout20080737 Ver 4_EC Issues Letter_FOL_2016Feb10_20160210 Damaged, � !1 A T � .f _ /� !1 /� !1 ll • STA 24+60.0 RT 25.0 —COL1-: Remove silt/repair weep at toe of slope. • STA 25+00.0 RT 30.0 —COLI-: Remove silt/repair weep at base of previous basin. • STA 13+50.0 LT 30.0 to 16+50.0 LT 30.0 —Y1-: Re-seed bare areas of slope. • STA 16+80.0 LT 30.0 to l 7+80.0 LT 30.0 —Yl -: Place temparary silt fence above rip rap slope. • STA ] 7+00.0 LT 30.0 to ] 8+50.0 LT 30.0 —Y1-: Repair rills on slope. • STA 19+60.0 RT l 5.0 —Yl -: Repair weep at toe of slope and stream (at end of temporary slope drain). • STA 22+20.0 RT 45.0 —Y1-: Repair weep at toe of slope. • STA 22+60.0 RT 45.0 —Y1-: Repair weep/remove silt from basin 9.5 weep. • STA 23+50.0 RT 45.0 —Yl -: Repair weep/remove silt fi-om basin 14.2. • STA l 5+50.0 RT 30.0 —RP1 G: Repair slope/remove silt from beyond silt fence. • STA 11+20.0 LT 15.0 —TT1-: Extend rip rap channel to weep at wetland boundary. • Repair and remove silt from inlet protection systems/re-work sumps project wide. • Repair or replace wattles as necessary project wide. • Repair and seed all bare areas of the project. • Remove all unnecessary erosion control devices and systems that are no longer useful. If you have any questions or need clarification on any of these items please let us know. Sincerely, Jason Salisbury Resident Engineer JPS:bcp CC: Ron Hancock, P.E. Greg Burns, P.E. File Inspectors EC: Randy Wise, P.E. Aaron Earwood, P.E. Wiley Jones, P.E.