HomeMy WebLinkAboutNCC241043_MODIFICATION Supporting Documents_20240604 (2) -tsaSGLTE0,, ROY COOPER c-+ u Governor ELIZABETH S.BISER ""' ,_r*t Secretary `$`a+N+" x WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality May 24,2024 LETTER OF APPROVAL Duke Energy Progress, LLC PO Box 1551 -PEDB3A Raleigh,NC 27602 RE: Project Name: EEI Access and Dredge Support Acres Approved: 32.87 Application ID: PA-004881 Permit Number: PERSO-2024-0103 Address: 1700 Dunnaway Road City: Semora County: Person River Basin: Roanoke Stream Classification: B: Primary Contact Recreation, Fresh Water; WS-V: Water Supply V Plan Type: Revised Plan Dear Duke Energy Progress, LLC, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three(3)years following the date of approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted _E ' North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources v Raleigh Regional Office 11628 Mall Service Center 13800 Barrett Drive I Raleigh,North Carolina 27609 NOR H CAR LIRA a.nrim.na arxn 919.791.4200 Letter of Approval Duke Energy Progress, LLC May 24, 2024 Page 2 of 2 for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973(North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules, including the applicant's eventual receipt of other environmental permits,authorizations or certifications that may be required for the project. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit, authorization, certification, or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Pieadv AiodtaiLde- Dylan Reinhardt Assistant Regional Engineer Land Quality Section DEQ j North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources v) Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh,North Carolina 27609 NORTH CAROM o�.m..haEnvironments!Q Nty /'� 919.791.4200