Loading...
HomeMy WebLinkAboutWQ0023429_Staff Report_20240325State of North Carolina Division of Water Resources Water Quality Regional Operations Section Staff Report FORM: WQROSSR 04-14 Page 1 of 4 To: NPDES Unit Non-Discharge Unit Application No.: NC/WQ0023429 Attn: Central Office Staff Facility Name: 710 Royal Sunset Drive County: Chatham From: Michael Hall Raleigh Regional Office I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? Yes or No a. Date of site visit: 03/11/2024 b. Site visit conducted by: Michael Hall c. Inspection report attached? Yes or No d. Person contacted: and their contact information: JT Colvin, Elena Coagliati e. Driving directions: N/A 2. Discharge Point(s): N/A Latitude: Longitude: Latitude: Longitude: 3. Receiving stream or affected surface waters: N/A Classification: River Basin and Sub-basin No. Describe receiving stream features and pertinent downstream uses: II. PROPOSED FACILITIES: NEW APPLICATIONS 1. Facility Classification: Description: Proposed flow: Current permitted flow: NA 2. Are the new treatment facilities adequate for the type of waste and disposal system? Yes or No If no, explain: 3. Are site conditions (soils, depth to water table, etc.) consistent with the submitted reports? Yes No N/A If no, please explain: 4. Do the plans and site map represent the actual site (property lines, wells, etc.)? Yes No N/A If no, please explain: 5. Is the proposed residuals management plan adequate? Yes No N/A If no, please explain: 6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable? Yes No N/A If no, please explain: DocuSign Envelope ID: 343305A2-A69E-4F62-BE72-847FE9513A3D FORM: WQROSSR 04-14 Page 2 of 4 7. Are there any setback conflicts for proposed treatment, storage and disposal sites? Yes or No If yes, attach a map showing conflict areas. 8. Is the proposed or existing groundwater monitoring program adequate? Yes No N/A If no, explain and recommend any changes to the groundwater monitoring program: 9. For residuals, will seasonal or other restrictions be required? Yes No N/A If yes, attach list of sites with restrictions (Certification B) Describe the residuals handling and utilization scheme: 10. Possible toxic impacts to surface waters: NA 11. Pretreatment Program (POTWs only): NA III. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? Yes No N/A ORC: Certificate #: Backup ORC: Certificate #: 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? Yes or No If no, please explain: Description of existing facilities: a 1,500 gallon baffled septic tank with an effluent filter; two Advantex AX20 treatment units; a 2,500 gallon recirculation tank with a recirculation pump; a 2,500 gallon storage/dosing tank with an irrigation pump, and high-water audio/visual alarms; an ultraviolet (UV) disinfection unit; a rain sensor; control panels; a 0.31 acre drip irrigation area; and all associated piping, valves, controls, and appurtenances. Proposed flow: Current permitted flow: 600 gpd Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership, etc.) 3. Are the site conditions (e.g., soils, topography, depth to water table, etc.) maintained appropriately and adequately assimilating the waste? Yes or No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? Yes or No If yes, please explain: 5. Is the residuals management plan adequate? Yes or No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? Yes or No If no, please explain: 7. Is the existing groundwater monitoring program adequate? Yes No N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? Yes or No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? Yes or No If no, please explain: 10. Were monitoring wells properly constructed and located? Yes No N/A If no, please explain: DocuSign Envelope ID: 343305A2-A69E-4F62-BE72-847FE9513A3D FORM: WQROSSR 04-14 Page 3 of 4 11. Are the monitoring well coordinates correct in BIMS? Yes No N/A If no, please complete the following (expand table if necessary): Monitoring Well Latitude Longitude ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ 12. Has a review of all self-monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? Yes or No N/A Please summarize any findings resulting from this review: Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable. 13. Are there any permit changes needed in order to address ongoing BIMS violations? Yes or No If yes, please explain: 14. Check all that apply: No compliance issues Current enforcement action(s) Currently under JOC Notice(s) of violation Currently under SOC Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Have all compliance dates/conditions in the existing permit been satisfied? Yes No N/A If no, please explain: 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? Yes No N/A If yes, please explain: There was no fence around the sprayfield and the alarms on the pump tank were running continuously; although the pumps were still operating as designed. This has been communicated to both the permittee and Aqwa, and the permittee is working with Aqwa to have this repaired. 16. Possible toxic impacts to surface waters: 17. Pretreatment Program (POTWs only): IV. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? Yes or No If yes, please explain: 2. List any items that you would like the NPDES Unit or Non-Discharge Unit Central Office to obtain through an additional information request: Item Reason DocuSign Envelope ID: 343305A2-A69E-4F62-BE72-847FE9513A3D FORM: WQROSSR 04-14 Page 4 of 4 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: Hold, pending receipt and review of additional information by regional office Hold, pending review of draft permit by regional office Issue upon receipt of needed additional information Issue Deny (Please state reasons: ) 6. Signature of report preparer: Signature of regional supervisor: Date: V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS There was no fence around the sprayfield and the alarms on the pump tank were running continuously; although the pumps were still operating as designed. This has been communicated to both the permittee and Aqwa, and the permittee is working with Aqwa to have this repaired. DocuSign Envelope ID: 343305A2-A69E-4F62-BE72-847FE9513A3D 3/25/2024