Loading...
HomeMy WebLinkAboutNCC232680_NOT Closeout Documents_20240603 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481 County: Craven Project: Hatteras Bass Pro-Storage Lot River basin: Neuse Person financially responsible:Bass Pro Shops-Kevin A Maliszewski,CFO Project#: CRAVE-2024-004 Address: 2500 E.Kearny St,Springfeld,MO 65898 1. Project Location: N.Glenburie Rd,New Bern Pictures: No 2. Weather and soil conditions: Sunny/Warm/Dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Title: Inspection report: Sent Report Date given/sent: May 08,2024 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA. 10. Comments: Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Amber Rights Others present: Date of inspection: May 07,2024 Time arriving on site: 1:45 PM Time leaving site: 2:00 PM cc: