HomeMy WebLinkAbout20240487 Ver 1_USACE Correspondence_20240424Chandler, Rebecca D
From: Rudolf, Laura <Laura.Rudolf@williams.com>
Sent: Wednesday, April 24, 2024 3:59 PM
To: Krystynka.B.Stygar@usace.army.mil
Cc: Joey Lawler; Erik L. Hartwick; Jennifer.L.Lawrence@usace.army.mi1; Chandler, Rebecca D;
Pitner, Andrew; jonathan.watts@deq.nc.gov; Doug j.perez@usace.army.miI
Subject: [External] RE: SAW-2024-00651: Forsyth County, Transco Main A MP 1345 Replacement
Project : Request for Information
Some people who received this message don't often get email from laura.rudolf@williams.com. Learn why this is important
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Krysta,
The Transco Main A MP 1345 Replacement Project (SAW-2024-00651) is a routine maintenance project
to replace a segment of the existing Mainline A Pipeline with an enhanced class of pipe, in accordance
with the U.S. Department of Transportation (DOT) natural gas pipe class requirements. This project is
not related to the Southeast SUDDLv Enhancement Proiect, which is the toxic of discussion on 5/2. The
Joint Application for the Transco Main A MP 1345 Replacement Project (SAW-2024-00651) was submitted
to the USACE and NCDEQ on 03/27/2024 and has been assigned to Jennifer Lawrence, at the USACE,
and Rebecca Chandler, at the NCDEQ. Joey Lawler is the lead at S&ME for the project. A second Joint
Permit Application was submitted to the USACE and NCDEQ for Transco Cowens Ford Loop MP
Replacement Project (SAW-2024-00757) on 04/10/2024 and has been assigned to Andrew Pitner, at the
NCDEQ, and Doug Perez, at the USACE. Joey Lawler is the lead at S&ME for the project as well. The
purpose of that project is a similar routine maintenance project to replace a segment of the existing
Cowans Ford Loop Mainline C Pipeline with an enhanced class of pipe, in accordance with the U.S.
Department of Transportation (DOT) natural gas pipe class requirements. I've copied the USACE and
NCDEQ reviewers for those two projects on this email for transparency. Please let me know if you have
any further questions regarding these two maintenance projects.
Thanks,
Laura Rudolf I Williams I Environmental Specialist
Cell: 713-204-1283 12800 Post Oak Blvd., Level 11, Houston, TX 77056
Williams Careers I Facebook I Twitter I Linkedln I YouTube I Instagram I Pipe Up
If you have received this message in error, please reply to advise the sender of the error and then immediately delete this
message.
From: Stygar, KRYSTYNKA B CIV USARMY CESAW (USA)<Krystynka.B.Stygar@usace.army.mil>
Sent: Wednesday, April 24, 2024 10:16 AM
To: Joey Lawler <JLawler@smeinc.com>
Cc: Erik L. Hartwick <EHartwick@smeinc.com>; ]onathan.watts@deg.nc.Bov
Subject: SAW-2024-00651: Forsyth County, Transco Main A MP 1345 Replacement Project : Request for Information
Joey,
Good morning, I have just received information that Transco, (via SM & E Inc) has applied for an NWP 12 for
utility lines for the Transco Main A MP 1345 replacement project. This was assigned the SAW action ID
number of SAW-2024-00651.
It was my understanding that this project, was part of the LARGE/BROAD project that is going to be part of the
Southeast Supply Enhancement Project.
There is an additional meeting that is scheduled for 5/2.
"This meeting is scheduled on behalf of Transcontinental Gas Pipe Line Company, LLC (TRANSCO) focused
on the initial planning stages of the Southeast Supply Enhancement Project."
"To facilitate seamless reviews leading up to application submittals, specifically we will have the opportunity to
address any concerns with the review of nominal workspace trenchless analysis/ Geotech investigations. We'll
also discuss Air Quality Permitting needs /modifications for compressor stations, questions with stormwater
submissions and following up with Environmental Justice Outreach efforts.
In preparation of receiving permit applications, we recognize the work load variations for different regional
offices and the coordination needed for this project. Please see the details below."
My concern for this NWP is that this NWP is piecemealing the actual permit, which appears to be part of
" Approximately 24 miles of 42" pipe in Guildford, Forsyth, and Davidson counties designated as the
Salem Loop"
Please advise what this NWP is specifically for, and if it is indeed a "separate and complete project" for
Transco.
Regards
Krysta