Loading...
HomeMy WebLinkAboutNCC201707_NOT Closeout Documents_20240531 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 County: Cumberland Project: 20,21,22,and 23 Shannon Woods River basin: Cape Fear Person financially responsible:William R Homes,LLC-James W Ray,Manager Project#: CUMBE-2020-082 NCC201707 Address: 8000Corporate Center Drive Suite 100,Charlotte,NC 28226 1. Project Location: Shannon Woods Way,Hope Mills Pictures: No 2. Weather and soil conditions: Dry,workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No one Title: Inspection report: Sent Report Date given/sent: December 11,2020 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: December 08,2020 Time arriving on site: 9:05 AM Time leaving site: 9:15 AM CC: