Loading...
HomeMy WebLinkAboutNCC241685_ESC Approval Submitted_20240603 d '+v 44 "IX 2 ROY COOPER gt �,�-;` y� Governor ,Harris "I DIONNE DELL[-GATTI v'� Secretory BRIAN WRENN NORTH CAROLINA Director Environmental Qualify June 3, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Encore Villas, LLC Attention:Clark Stewart,Member 2857 Westport Road Charlotte,North Carolina 28208 RE:Project Name: Encore Villas, LLC Acres Approved: 22.8 Project ID: CABAR-2021-064 County: Cabarrus,City: Concord Address: NC Hwy 49 River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Encore Villas,LLC Date Received by LQS: June 1,2021 Plan Type: Revised Dear Mr. Stewart: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three(3)years following the date of approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent(NOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGOI.Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form,a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO 1 permit.However,on or after May 1,2019,a$100 fee will be charged annually.This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC,once it is received. 3. Records of inspections made during the previous 30 days. D E North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources wwpp�� Mooresville Regional Office 6f0 East Center Avenue,Suite 301 ! Moorcsvilk.North Carolina 281t5 !ems i�V� -n ix . 7114.14.111.00 Letter of Approval with Modifications Encore Villas, LLC June 3, 2021 Page 2 of 3 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, eke-d.e6,,,s,( 94af61'e ee Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: Dogwood Engineering Attention: Sarah Stewart, PE 1209 Oak Crest Trail Belmont,North Carolina 28012 Inspection Department P P Letter of Approval with Modifications Encore Villas, LLC June 3,2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Encore Villas,LLC Project ID: CABAR-2021-064 County: Cabarrus _ 1. The site, or portions of the site as applicable, are required to be stabilized after any period of inactivity. Slopes steeper than 3:1,perimeter dikes,swales,and ditches must be stabilized within 7 days. All other areas must be stabilized within 14 days. [N.C.G.S. 143-215.1]This site has the potential for sediment relocation between phases if proper ground stabilization is not developed according to required standards.