Loading...
HomeMy WebLinkAboutSW8981020_CURRENT PERMIT_20230328 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 �8 ►p2U DOC TYPE © CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 o z3 032 g YYYYMMDD a�`5TA7Eo ROY COOPER Governor ELIZABETH S.BISER Secretary a'^" DOUGLAS R.ANSEL NORTH CAROLINA lntedm Dlrecmr Environmental Quality March 28, 2023 ZP No. 76, LLC Attn: Jeffery L. Zimmer, President P.O. Box 2628 Wilmington,NC 28401 Subject: Permit Renewal Post-Construction Stormwater Management Permit No. SW8981020 CVS Pharmacy Sneads Ferry Onslow County Dear Mr. Zimmer: Effective August 1, 2013 the Post-Construction Stormwater Management Program has been transferred from the Division of Water Quality ("DWQ")to the Division of Energy, Mineral and Land Resources ("DEMLR"). All previous references to DWQ will remain in older permits issued prior to August 1,2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period of any permit that was set to expire during this time frame to three(3)years from its current expiration date. On August 2, 2010,the Governor signed Session Law 2010-177, which granted an extra year for a total of four(4)years extension. The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on March 24, 2023. The Division is hereby notifying you that permit SW8981020 has been renewed, updated, and re-issued on March 28, 2023, as attached. Please be aware that the renewal and re- issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until March 10,2031, which includes all available extensions, and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts,requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty(30)days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714, or via telephone at 9197431-3000,or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Aisia Freeman in the Wilmington Regional Office, at phone 4 (910) 796-7318 or Aisia.freeman@ncdenr.gov. Sincerely, Cl �40 Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources ®rk 0%J� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington,North Carolina 2&405 aomHcewuNn 910.796.7215 State Stormwater Permit No. SW8 981020 Page 2 of 2 Enclosures: Attachment C—Permitting History Copy of the Renewal Application Documents DES/af: \\\Stormwater\Permits&Projects\1998\981020 HD\2023 03 permit 981020 CC' Wilmington Regional Office Stormwater File North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington,North Carolina 28405 rva mw 910.796.7215 +' Post Construction Stormwater Management Permit No. SW8981020 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST-CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mr. Jeffrey Zimmer and ZP No. 76, LLC CVS Pharmacy— Sneads Ferry 1309 Highway 210, Sneads Ferry, Onslow County FOR THE operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until March 10, 2031 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 2 of this permit. The stormwater control has been designed to handle the runoff from 50,900 square feet of impervious area. 3. The tract will be limited to the amount of built-upon area indicated on page 3 of this permit, and per approved plans. The built-upon area for the future development is limited to 0 square feet. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built-upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. Page 1 of 4 Post Construction Stormwater Management Permit No. SW8981020 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 1.72 Onsite, ft2: 75,090 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 50,900 C. Design Storm, inches: 1 d. Pond Design Depth, feet: 5 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 27.18 g. Permanent Pool Surface Area, ft2: 3,800 h. Permitted Storage Volume, ft3: 4,785 i. Temporary Storage Elevation, FMSL: 28.28 J. Controlling Orifice: 1"OJ pipe k. Permitted Forebay Volume, ft3: 2,190 I. Receiving Stream/River Basin: Mill Creek/Cape Fear M. Stream Index Number: 18-87-14 n. Classification of Water Body: "SA" (23 ppm chlorides) II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and re-vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 2 of 4 Post Construction Stormwater Management Permit No. SW8981020 8. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 9. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 10. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certifi cation(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the 'SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on-site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); Page 3 of 4 Post Construction Stormwater Management Permit No. SW8981020 b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. . d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed, updated and reissued this the 280 day of March 2023, NORTH CAROLIIN/A ENVIRONMENTAL MANAGEMENT COMMISSION f74 7.Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 4 of 4 Attachment C-Permitting History CVS Pharmacy Sneads Ferry Permit No.SW8 981020 Approval Pcrmit Action RIMS Description of the Changes Modified Plan Sheets Date Version High Density Stormwater Project-construction,operation and maintenance of a 3/10/1999 Original 1 0 detention pond in compliance with the provisions of 15A NCAC 2H.1000.The I-5(of5) Approval stormwater control has been designed to handle the runoff from 50,900 square feet of impervious area. High Density Commercial Project-operation and maintenance of a wet detention 7/27/2009 Renewal 2.0 pond in compliance with the provisions of 15A NCAC 2H.1000.The storm eater control has been designed to handle the runoff from 50,900 square feet of impervious area. 3/28/2023 Renewal 2.0 New Expiration Date 3/10/2031 Page 1 of 1 1 C11111L 1VQ. S �'Y 4# (to be n provided y.QW State of North Carolina y.e ' .` Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for rose as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan—submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a signed and notarized operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name : CVS Pharmacy Contact Person: John L. Pierce Phone Number: ( gin) 346-9800 For projects with multiple basins, specify which basin this worksheet applies to: Basin Bottom Elevation 22, 18 fL (average elevation of the floor of the basin) Permanent Pool Elevation 27 1 S ft. (elevation of the orifice) Temporary Pool Elevation 28.28 ft. (elevation of the discharge structure overflow) Permanent Pool Surface Area 3800 sq. fL (water surface area at the orifice elevation) Drainage Area 1 .64• ac. ' (on-site and off-site drainage to the basin) Impervious Area 1 .17 ac. (on-site and off-site drainage to the basin) ?ermanent Pool Volume 9702 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 4580 cu. ft. (volume detained above the permanent pool) Forebay Volume 2190 CIL fL SA/DAl used 5. 14% (surface area to drainage area ratio) ` Diameter of Orifice t in. Design TSS Removal 90% %o (85% TSS removal required, see item k below) I. REQUIRED ITEMS CHECKLIST me following checklist outlines design requirements per the Stormwater Best Management Practices manual '4_C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code ectiom 15 A NCAC 2H .1008. :Aial in the space provided to indicate the following design requirements have been met and supporting Dcumentation is attached. If the applicant has designated an agent in the Stomwarer Management Permit pplication Form, the agent may initial below. If a requirement has not been met, attach justification. an SWU-102 Rev 1/August1998 Page I of 3 Applicants•Inriiais" . `Tlie'temporary pool controls runoff from the I inch storm event. 1L < b. The basin length to width ratio is greater than 3:3 . . The basin side slopes above the permanent pool are no steeper than 3:I. d. A submerged and vegetated perimeter shelf at less than 6:1 is provided (show detail). ice---• e._.Vegetation above the permanent pool elevation is specified. f. An emergency drain is provided T..rr_. to empty the basin. (PORTABLE PUMP AVAILABLE) %g. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). SL h. The temporary pool draws down in 2 to 5 days. }t i. A trash rack is provided for both the overflow and orifice. j. The forebay volume is approximately equal to 20% of the total basin volume. k. Sediment storage is provided in the permanent pool. I. A 30400t vegetative filter is provided at the outlet2 (include erosive flow calculations) J2, in. Recorded drainage.easement for each basin including access to nearest right-of-way. _-�- n. A site specific operation and maintenance (0&M)plan is provided. 3 - o. A vegetation management/mowing schedule is provided in the O&M plan. JL P. Semi-annual inspections are specified'in the O&M plan. S? q. A debris check to be performed after every storm event is specified in the O&M plan. r. Specific clean-out benchmarks are specified in the 0&M plan (elevation or depth). s. A legally responsible party is designated in the O&M p�an3 (include name and title). If the basin is used for sediment and erosion control during construction, clean out of the basin is specified to be performed prior to use as a wet detention basin. i Footnotes: 1 When using the Division SA/DA tables,the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual % nd permanent pool depth. Linear interpolation should be employed to determine the correct v sta alue for non- standard table entries. �. - The requirement for a vegetative filter may be waived if the wet detention basin is designed to meet 90%TSS removal. 3 The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a ` resident of the subdivision has been named the president FI. WET DETENTION BASL 1 OPERATION.AND MAP41ENANCE AGREEMENT the wet detention basin system is defined as the wet detention basin, forebay, non-integrated pretreatment Ystems (pretreatment other than forebays); and the vegetated filter if one is provided. 'his system (check one) ❑ does XXdoes not incorporate a vegetated filter. 'his system (check one) ❑ does KXdoes not incorporate non-integrated pretreatment. (aintenance activities shall be performs as follows: After every significant runoff producing rainfall event and at least monthly: :711 SWU-102 Rev l/August 1998 Page 2 of 3 a! Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, grass cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The original design depth is: 5.0 The sediment removal benchmark depth is: 3.75 5. Remove cattails and other indigenous wetland plants when they cover 75% of the basin surface. These plants shall be encouraged to grow along the basin perimeter. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the above maintenance procedures. I agree to notify DWQ of any problems with the system or changes in the name of the project,responsible party, or address. Printname: Jeffrey L. Zimmer, LLC Adminstrator/ZP No. 76,LLC Address: P.O. Box 2628, Wilmington, NC 28402 Phone: (910) 763-4669 Title: LC Adminstrator Signature: Date: October 14 11998 I, 1� \�\Ct VY- a Notary Public for the State of County of do hereby certify that personally appeared before me this I—day of DC k-k:�Pl 119 and acknowledge the due execution of the forgoing infiltration system maintenance requirements. Witness my hand and official seal, My commission expires My Co ssiom Expires September 24 �00Y ; U n� r �ss?s o 'e = y°o �.NiWe eI d cig Form SWU-102 Rev 1/August 1998 Page 3 of 3 y9y011ER Cold •r DEMLR USE ONLY Date ecei ed Fee Pai Permit Number JG(J P ( jDaCl NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: Su g I p S l om 2. Project name: CVs ?harmacel SnGQ s Ferry 3. Project street address: 1309 H W 0-10 City: Sh e-a oKS Perrtl County: ons:low zip : a Mpo 4. What, if any, changes have been made to the project as permitted? N/OA)e. If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at:httl)s:Hdeg.nc.gov/about/divisions/energv- mi neral-land-resou rces/energy-m i ne ral-land-ru les/stormwater-prog ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at:https://deg.nc.gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: ZP A)0' 7(pr LLC 2. Signing Official's Name: J Z�i 2 L . Zi mrne r 3. Signing Official's Title: S 1 e rrL- 4. Mailing Address: r, 0• boy- <94as City: 1 I M l n n State: C ZIP :a (4Oa 5. Street Address: It P1'/)1CeFX S" eef- City: ll I m ln� n State:: AZC- ZIP : (Mq0/ 6. Phone: ( /0 ),-)Ya- '7&39 Email: . roPeI hY1nzPP/J�(,;1 zdI .caa ECEIVE MAR 2 4 2023 By-- Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION /qAn� o er Z� No �� Mcrnbcr, T ne ' I, �) 2-�re� L• Zf rnmer, ,, the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built-upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership All information provided on this permit renewal application is, to the best of my knowledge, correct and c et . Signature: Date: 0�� NOTARIZATION:: I, 6QIrr_rr' a Notary Public for the State of Nor H CGrolrhq County of NrV I+uHoye.Y` do hereby certify that 3t grey L. '?,wwrer,Ac,NacSlr of 2P No, -76 Ar,&,Av , SYrG personally appeared before me tlij�lAL %0, day of /°1Q�`( I , 202, and acknowledge the due HEM i� ittIntt tyre Jy�going instrument. Witness my hand and official seal, p,� Vty 2 S < Nofry Se#) P%Ov &My commission expires A&tyy64 31, 2026 ECEIVE MAR 2 4 2023 BY: Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 State Stormwater Management Sysiems Permit No. SW8 981020 CVS Pharmacy-Sneads Ferry Stormwater Permit No. SW8 981020 OuSlow County Engineer's Certification 1, Z�LCz X y -d as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe(periodically/weekly/full time) the construction of the project, F "1`7 (Project) for ZE A.16.�f- [_[_[/ (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in t e observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: ry„ SEAT. Signature = '•. ; RegisuationNumber IV Date f MAY 1"1 2009 BY: 6